Registered No litigation declared Mixed project

NATURE PARADISE

By VISHWA REAL ESTATE CO

RG-MH-11502 · RERA P52000001604 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 102 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 102 months from the original
493 of 1287Construction stages doneacross 118 buildings; furthest along: Slabs of Super Structure, 98%
113 of 234Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

NATURE PARADISE is a Mixed project by VISHWA REAL ESTATE CO in Raigarh, Maharashtra, registered with MahaRERA as P52000001604 on 29 Jul 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 102 months from the original filing. 121 of the 234 units on this registration are recorded sold or booked, and 493 of 1287 construction stages are filed complete.

At a glance

Project

  • NameNATURE PARADISE
  • TypeMixed
  • Location
    • Alibagh
    • Mulgaon T. Wasare
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000001604
  • ReraGenie IDRG-MH-11502

Builder

  • NameVISHWA REAL ESTATE CO
  • Entity typePartnership
  • PartnersARCHANA RAVINDRA POTDAR, AAKASH RAVINDRA POTDAR, SHRIRAM BHASKAR VIBHANDIK, PRAVIN RAMDAS KUNJIWAL, SUREKHA PRAVIN KUNJIWAL, SUNIL EKNATHRAO PANDIT, MANISHA SUNIL PANDIT

Key dates

this monthRegisteredJul 2017First promiseJun 2021Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jul 2017
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 30 Jun 2021)
  • Buildings117 building records
  • Documents filed108 files

Current status

52%121 of 234 units booked
45.0%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LIG E TYPE PLOT NO 48NA22202
LIG E TYPE PLOT NO 49NA22202
LIG E TYPE PLOT NO 50NA22202
MIG D TYPE PLOT NO 51NA22202
MIG D TYPE PLOT NO 52NA22202
LIG E TYPE PLOT NO 53NA22202
LIG E TYPE PLOT NO 54NA22202
LIG E TYPE PLOT NO 55NA22202
LIG E TYPE PLOT NO 56NA22202
LIG E TYPE PLOT NO 57NA22202
LIG E TYPE PLOT NO 58NA22202
MIG D TYPE PLOT NO 59NA22202
MIG D TYPE PLOT NO 60NA22202
LIG E TYPE PLOT NO 61NA22202
LIG E TYPE PLOT NO 62NA22202
LIG E TYPE PLOT NO 63NA22202
LIG E TYPE PLOT NO 64NA22202
LIG E TYPE PLOT NO 65NA22202
LIG E TYPE PLOT NO 66NA22202
MIG D TYPE PLOT NO 67NA22202
MIG D TYPE PLOT NO 68NA22202
LIG E TYPE PLOT NO 69NA22202
LIG E TYPE PLOT NO 70NA22202
LIG E TYPE PLOT NO 71NA22202
LIG E TYPE PLOT NO 72NA22202
LIG E TYPE PLOT NO 73NA22202
LIG E TYPE PLOT NO 74NA22202
MIG D TYPE PLOT NO 75NA22202
MIG D TYPE PLOT NO 76NA22202
LIG E TYPE PLOT NO 77NA22202
C TYPE PLOT NO 1NA22202
A1 TYPE PLOT NO 2NA22202
A1 TYPE PLOT NO 03NA22202
A1 TYPE PLOT NO 04NA22202
D TYPE PLOT NO 05NA22202
MIG D TYPE PLOT NO 06NA22202
MIG D TYPE PLOT NO 07NA22202
B1 TYPE PLOT NO 08NA22202
B1 TYPE PLOT NO 09NA22202
LIG E TYPE PLOT NO 15NA22202
LIG E TYPE PLOT NO 16NA22202
LIG E TYPE PLOT NO 17NA22202
LIG E TYPE PLOT NO 18NA22202
MIG D TYPE PLOT NO 19NA22202
MIG D TYPE PLOT NO 20NA22202
LIG E TYPE PLOT NO 21NA22202
LIG E TYPE PLOT NO 22NA22202
LIG E TYPE PLOT NO 23NA22202
LIG E TYPE PLOT NO 24NA22202
LIG E TYPE PLOT NO 25NA22202
LIG E TYPE PLOT NO 26NA22202
MIG D TYPE PLOT NO 27NA22202
MIG D TYPE PLOT NO 28NA22202
LIG E TYPE PLOT NO 29NA22202
LIG E TYPE PLOT NO 30NA22202
LIG E TYPE PLOT NO 31NA22202
LIG E TYPE PLOT NO 32NA22202
LIG E TYPE PLOT NO 33NA22202
LIG E TYPE PLOT NO 34NA22101
MIG D TYPE PLOT NO 35NA22000
MIG D TYPE PLOT NO 36NA22000
LIG E TYPE PLOT NO 37NA22000
LIG E TYPE PLOT NO 38NA22000
LIG E TYPE PLOT NO 39NA22000
LIG E TYPE PLOT NO 40NA22000
LIG E TYPE PLOT NO 41NA22000
LIG E TYPE PLOT NO 42NA22000
MIG D TYPE PLOT NO 43NA22000
MIG D TYPE PLOT NO 44NA22000
LIG E TYPE PLOT NO 45NA22000
LIG E TYPE PLOT NO 46NA22000
LIG E TYPE PLOT NO 47NA22000
LIG E TYPE PLOT NO 78NA22000
LIG E TYPE PLOT NO 79NA22000
LIG E TYPE PLOT NO 80NA22000
LIG E TYPE PLOT NO 81NA22000
LIG E TYPE PLOT NO 82NA22000
MIG D TYPE PLOT NO 83NA22000
MIG D TYPE PLOT NO 84NA22000
LIG E TYPE PLOT NO 85NA22000
LIG E TYPE PLOT NO 86NA22000
LIG E TYPE PLOT NO 87NA22000
LIG E TYPE PLOT NO 88NA22000
LIG E TYPE PLOT NO 89NA22000
LIG E TYPE PLOT NO 90NA22000
MIG D TYPE PLOT NO 91NA22000
MIG D TYPE PLOT NO 92NA22000
LIG E TYPE PLOT NO 93NA22000
LIG E TYPE PLOT NO 94NA22000
LIG E TYPE PLOT NO 95NA22000
LIG E TYPE PLOT NO 96NA22000
LIG E TYPE PLOT NO 97NA22000
LIG E TYPE PLOT NO 98NA22000
MIG D TYPE PLOT NO 99NA22000
C TYPE PLOT NO 10NA22000
A1 TYPE PLOT NO 11NA22000
A1 TYPE PLOT NO 100NA22000
C TYPE PLOT NO 101NA22000
A2 TYPE PLOT NO 102NA22000
A1 TYPE PLOT NO 103NA22000
B2 TYPE PLOT NO 104NA22000
B2 TYPE PLOT NO 105NA22000
B2 TYPE PLOT NO 106NA22000
B2 TYPE PLOT NO 107NA22000
B2 TYPE PLOT NO 108NA22000
B2 TYPE PLOT NO 109NA22000
B1 TYPE PLOT NO 110NA22000
B1 TYPE PLOT NO 111NA22000
A2 TYPE PLOT NO 112NA22000
B1 TYPE PLOT NO 113NA22000
C TYPE PLOT NO 114NA22000
A2 TYPE PLOT NO 115NA22000
A2 TYPE PLOT NO 116NA22000
A2 TYPE PLOT NO 117NA22000
MIG D TYPE PLOT NO 12NA22000
LIG E TYPE PLOT NO 13NA22000
LIG E TYPE PLOT NO 14NA22000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 118 buildings; the table lists the first 20.

493 of 1287 construction stages are filed complete across 118 buildings. The stage furthest along is Slabs of Super Structure, at 98%.

LIG E TYPE PLOT NO 480%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LIG E TYPE PLOT NO 4982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LIG E TYPE PLOT NO 500%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MIG D TYPE PLOT NO 5182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MIG D TYPE PLOT NO 5282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LIG E TYPE PLOT NO 5382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LIG E TYPE PLOT NO 5482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LIG E TYPE PLOT NO 5582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LIG E TYPE PLOT NO 5682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LIG E TYPE PLOT NO 5782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LIG E TYPE PLOT NO 580%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MIG D TYPE PLOT NO 5982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MIG D TYPE PLOT NO 6082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LIG E TYPE PLOT NO 610%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LIG E TYPE PLOT NO 620%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LIG E TYPE PLOT NO 6382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LIG E TYPE PLOT NO 640%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LIG E TYPE PLOT NO 6568%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.89%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
LIG E TYPE PLOT NO 660%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MIG D TYPE PLOT NO 6782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area25,164 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Nov 2025

Approvals and building plan

Sanctioning authorityTown Planning Authority
Permissible FSI14759.0
Proposed, not sanctioned14,759 sq m
Buildings approved117
Buildings sanctioned117

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJALGOAN
Estimated costRs 18.23 cr
Cost incurredRs 8.21 cr
Work done45.04%
BuildingWingEstimatedIncurred
C TYPE PLOT NO 1NARs 63.39 lakh-
C TYPE PLOT NO 10NARs 63.39 lakh-
C TYPE PLOT NO 101NARs 63.39 lakh-
C TYPE PLOT NO 114NARs 63.39 lakh-
B2 TYPE PLOT NO 104NARs 39.10 lakh-
B2 TYPE PLOT NO 105NARs 39.10 lakh-
B2 TYPE PLOT NO 106NARs 39.10 lakh-
B2 TYPE PLOT NO 107NARs 39.10 lakh-
B2 TYPE PLOT NO 108NARs 39.10 lakh-
B2 TYPE PLOT NO 109NARs 39.10 lakh-
B1 TYPE PLOT NO 08NARs 38.04 lakh-
B1 TYPE PLOT NO 09NARs 38.04 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMUKESH MORE
EngineerMR BHANGALE
Chartered AccountantBadale Mahale and CO Chartered Accountants
Chartered AccountantSonawane Mor And Co Charterred Accountant
PartnerRole in project
VISHWA REAL ESTATE CO-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000010441Jun 2021 → Dec 2025

Reason as filed by the promoterWorst market scenario and sluggish sales due to many factors ...Also there is a corona since 2020 and lockdown .

EXT52000024454Jun 2021 → Dec 2029

Reason as filed by the promoterAs per attachment

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Aug 2021

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate from 01st Jul25 to 30th Sep25_compres.pdf16 Jun 2026
Withdrawal Update Form 1File: Architect form 01st Oct25 to 31st dec25.pdf16 Jun 2026
Withdrawal Update Form 1File: Architect form from 01st Jan 26 to 31st Mar26.pdf16 Jun 2026
Withdrawal Update Form 2File: Form 2 June 24.pdf16 Jun 2026
Withdrawal Update Form 2File: form 2 - Engineer form 01st Oct25 to 31st Dec25.pdf16 Jun 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate from 01st Jan26 to 31st Mar26.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3 01st Jul25 to 30th Sep25.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3 01st Oct25 to 31st Dec25.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3 - From 01st Jan26 to 31st Mar26.pdf16 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 01st Apr 24 to 31st Mar25.pdf3 Apr 2026
Form 1File: Architect form 1st Apr25 to 30th Jun25_compressed.pdf21 Jul 2025
Form 2File: Form 2 Engineer form 01st Apr25 to 30th Jun25.pdf21 Jul 2025
Form 3File: Form 3 01st Apr25 to 30th Jun25.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Booked and sold Inventory 01st Apr25 to 30th Jun 2025_compressed.pdf21 Jul 2025
Form 1File: Architect form for 1st Jan25 to 31st Mar25_compressed.pdf4 Jul 2025
Form 2File: Form 2.pdf4 Jul 2025
Form 3File: Form 3.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & Booked Inventory_compressed.pdf4 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form for 1st Jan25 to 31st Mar25_compressed.pdf24 Apr 2025
Certificates of CA (Form 3)File: Form 3.pdf24 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf24 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed.pdf19 Jan 2025
Certificates of CA (Form 3)File: Form 3.pdf19 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FOrm 2.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory till 31st Dec24_compressed.pdf19 Jan 2025
Certificates of CA (Form 3)File: Form 3 Jul24 to Sep24.pdf26 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer form.pdf26 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked - 300623.pdf31 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked - 300923.pdf31 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked - 311223.pdf31 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked - 310324.pdf31 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked - 300624.pdf31 Jul 2024
Declaration in FORM BFile: Form B.pdf30 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2018.pdf30 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2019.pdf30 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2020.pdf30 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2021.pdf30 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2022.pdf30 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2023.pdf30 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2024.pdf30 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 22.pdf30 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 23.pdf30 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 23.pdf30 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 23.pdf30 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 23.pdf30 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mar 24.pdf30 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 24.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2022.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2024.pdf30 Jul 2024
CERSAI detailsFile: Declaration for CERSAI.pdf30 Jul 2024
Certificates of CA (Form 3)File: Form 3 Jun 23.pdf30 Jul 2024
Certificates of CA (Form 3)File: Form 3 Sep 23.pdf30 Jul 2024
Certificates of CA (Form 3)File: Form 3 March 22.pdf30 Jul 2024
Certificates of CA (Form 3)File: Form 3 March 23.pdf30 Jul 2024
Certificates of CA (Form 3)File: Form 3 Jun 23.pdf30 Jul 2024
Certificates of CA (Form 3)File: Form 3 Sep 23.pdf30 Jul 2024
Certificates of CA (Form 3)File: Form 3 Dec 23.pdf30 Jul 2024
Certificates of CA (Form 3)File: Form 3 March 24.pdf30 Jul 2024
Certificates of CA (Form 3)File: Form 3 Jun 24.pdf30 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of other interest.pdf30 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf30 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FOrm 5 22-23.pdf30 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf30 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration.pdf30 Jul 2024
Declaration about Commencement CertificateFile: Revised Declaration about commencement certificate stamped.pdf9 Sep 2021
Declaration about Commencement CertificateFile: Declaration of CC under circular32 on letter head.pdf7 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality assurance certificate1_compressed.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality assurance certificate_compressed.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality assurance certificate1_compressed.pdf12 Aug 2021
Details of Restarting of Construction work post lockdownFile: Details of Restarting of Construction work post lockdown.pdf12 Aug 2021
OtherFile: Declaration of CC under circular32 on letter head.pdf12 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect form 4_compressed.pdf11 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect form 4 additional_compressed.pdf11 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect form 4 additionals_compressed.pdf11 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of formation of Legal Entity Society Co Op etc.pdf6 Aug 2021
Status of ConveyanceFile: Status of conveyeance.pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Annual Report AY 2020 To 2021.pdf4 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Annual Report AY 2021 To 2022.pdf4 Aug 2021
Declaration about Commencement CertificateFile: NA order small file size.pdf20 Jul 2021

How this compares with Raigarh

52%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 102 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NATURE PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Alibagh5,900+ in Raigarh

2 kmNATURE PARADISECompleted 48Lapsed / revoked 30Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 104 registered projects within 2 km.

Builder: VISHWA REAL ESTATE CO

VISHWA REAL ESTATE CO has 1 registration on MahaRERA, including NATURE PARADISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if NATURE PARADISE is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NATURE PARADISE?

The registered promoter entity is VISHWA REAL ESTATE CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NATURE PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NATURE PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NATURE PARADISE?

The professionals named in the filing: Architect: MUKESH MORE; Engineer: MR BHANGALE; Chartered Accountant: Badale Mahale and CO Chartered Accountants; Chartered Accountant: Sonawane Mor And Co Charterred Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NATURE PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NATURE PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NATURE PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.