Home / Browse projects / Nagpur, Maharashtra / NARMADA VIHAR-8

Completed No litigation declared Plotted project

NARMADA VIHAR-8

By RITESH R. SHARMA, ADITYA R. SHARMA, RAGHAV R. SHARMA

RG-MH-78149 · RERA P50500076953 · Last updated on MahaRERA portal: 22 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedregistration recorded completed
75 of 75Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

NARMADA VIHAR-8 is a Plotted project by RITESH R. SHARMA, ADITYA R. SHARMA, RAGHAV R. SHARMA in Nagpur, Maharashtra, registered with MahaRERA as P50500076953 on 9 Jul 2024. The registration is recorded completed; possession was promised by 31 Dec 2029. 0 of the 75 units on this registration are recorded sold or booked.

At a glance

Project

  • NameNARMADA VIHAR-8
  • TypePlotted
  • Location
    • ASTAVINAYAK ROAD
    • WANADONGARI
    • Wanadongri
    • Hingna
    • Nagpur
    • 441110
  • Pincode441110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500076953
  • ReraGenie IDRG-MH-78149

Builder

  • NameRITESH R. SHARMA, ADITYA R. SHARMA, RAGHAV R. SHARMA
  • Entity typeOthers
  • Member PartnersADITYA RITESH SHARMA SHARMA, RAGHAV RITESH SHARMA SHARMA
  • Member Partner & Authorised SignatoryRITESH RADHESHYAM SHARMA SHARMA
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedDec 2029Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Jul 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed62 files

Current status

0%0 of 75 units booked

Figures as on 22 Jul 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 22 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area16,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
Declared on5 Jun 2025
LandownerVillageDistrict
RITESH RADHESHYAM SHARMANagpur (M Corp.)Nagpur
ADITYA RITESH SHARMANagpur (M Corp.)Nagpur
RAGHAV RITESH SHARMANagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagar Parishad Wanadongri

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChandak Bhawan, North Ambazari Road, Shankar nagar Square, NAGPUR 440010

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Lamge
EngineerHitendra Sharma
Chartered AccountantPrashant Sharma
PartnerRole in project
RITESH R. SHARMA, ADITYA R. SHARMA, RAGHAV R. SHARMA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jul 2025

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: OC Mail NPWana ARch FOrm 4 NPW letter.pdf22 Jul 2025
Form 1File: Form 1 Arch Cert 141024.pdf3 Jun 2025
Form 1File: Form 1 Arch Certi Q-3 Dec 2024.pdf3 Jun 2025
Form 2File: Form 2 Engr Certi Dec 2024.pdf3 Jun 2025
Form 3File: Form 3 CA Certi Dec 2024.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: DlSCOLSURE OF SOLD I BOOKED lNVENTORY NV-8.pdf3 Jun 2025
Self-declaration of Quarterly ProgressFile: 31-03-25 DlSCOLSURE OF SOLD I BOOKED lNVENTORY.pdf3 Jun 2025
Form 1File: Form 1 ARch Certi March 2025.pdf3 Jun 2025
Form 2File: Form 2 Engr Certi MARCH 2025.pdf3 Jun 2025
Form 3File: Form 3 CA Certi March 2025_11zon (1).pdf3 Jun 2025
Form 2A (FY 2024-2025)File: FOrm 2A DOwnloaded Engr Annual Certificate.pdf3 Jun 2025
Completion CertificateFile: COmpletion Letter Nagar Parishad.pdf20 May 2025
Completion CertificateFile: Form 4 Arch Completion certificate.pdf20 May 2025
Completion CertificateFile: OC Mail NPWana ARch FOrm 4 NPW letter.pdf20 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Mail NPWana ARch FOrm 4 NPW letter.pdf8 May 2025
Other - TechnicalFile: OC Mail NPWanadongri to RERA.pdf6 May 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: COmpletion Letter Nagar Parishad.pdf25 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COmpletion Letter Nagar Parishad.pdf25 Apr 2025
Other - TechnicalFile: Form 4 Arch Completion certificate.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARch Certi March 2025.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certi March 2025_11zon (1).pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engr Certi MARCH 2025.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certi Dec 2024.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certi Q-3 Dec 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engr Certi Dec 2024.pdf27 Jan 2025
Status of ConveyanceFile: DlSCOLSURE OF SOLD I BOOKED lNVENTORY NV-8.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: DlSCOLSURE OF SOLD I BOOKED lNVENTORY NV-8.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert 141024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certi 141024.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engr Certi 141024.pdf15 Oct 2024
Details of encumbrances concerned to FinanceFile: Nil Fin Encu Declaration - corrected PH.pdf2 Jul 2024
Details of encumbrances concerned to LegalFile: Nil Fin Encu Declaration - corrected PH.pdf2 Jul 2024
CERSAI detailsFile: CERSAI_Search_Report_200311824722_For_Asset_Based_Search_28_06_2024_15_30_00_317.pdf28 Jun 2024
Proforma of Agreement for saleFile: AGREEMENT-RERA-PLOT-SHARMA-NARMADA_VIHAR-8- (1).pdf28 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report to model agreement -3sign.pdf28 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration bank separate account.pdf20 Jun 2024
Proforma of Allotment letterFile: Allotment_Letter-NARMADA_VIHAR-8.pdf15 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation report to model ALLOTTMENT LETTER.pdf15 Jun 2024
Other - FinanceFile: dECLARATION aNNEX-1.pdf15 Jun 2024
Other - FinanceFile: dECLARATION bANK joINT OPERATION.pdf15 Jun 2024
Other - FinanceFile: dECLARATION nO SEPERATE ENTITY.pdf15 Jun 2024
PAN CardFile: PAN.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 3 sign.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory disclosure.pdf3 Jun 2024
Other - LegalFile: 7-12.pdf3 Jun 2024
Other - TechnicalFile: CC Mail NPWana.pdf3 Jun 2024
Status of ConveyanceFile: Sold Inventory disclosure.pdf1 Jun 2024
Building plan approval or NA orderFile: NA Sanad W-105 106 107.pdf31 May 2024
Layout approvalFile: FInal Sanction letter and RL.pdf31 May 2024
Layout approvalFile: Final Sanction MAP.pdf31 May 2024
Copy of the legal title reportFile: Title Search Report_11zon.pdf31 May 2024
Details of encumbrances concerned to FinanceFile: Legal Encumberance certificate.pdf31 May 2024
Details of encumbrances concerned to LegalFile: Legal Encumberance certificate.pdf31 May 2024
Copy of Layout Approval (in case of layout)File: FInal Sanction letter and RL.pdf31 May 2024
Copy of Layout Approval (in case of layout)File: Final Sanction MAP.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: NA Sanad W-105 106 107.pdf31 May 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Sanad W-105 106 107.pdf31 May 2024
Declaration about Commencement CertificateFile: Format D COmmencement declaration.pdf31 May 2024
Declaration in FORM BFile: fORMAT b aFFIDAVIT dECLARATION.pdf31 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf31 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A diclosure in other organisations.pdf31 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHIVTIRTH NAGAR - 4P50500033701Near MBA College, Zari village, Grampanchayat Rui, Nagpur Gramin Nagpur, Nagpur217Mar 2022CompletedDec 2027Jul 2023

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NARMADA VIHAR-8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WANADONGARI2,800+ in Nagpur

2 kmNARMADA VIHAR-8Completed 9Lapsed / revoked 4Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: RITESH R. SHARMA, ADITYA R. SHARMA, RAGHAV R. SHARMA

RITESH R. SHARMA, ADITYA R. SHARMA, RAGHAV R. SHARMA has 1 registration on MahaRERA, including NARMADA VIHAR-8. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if NARMADA VIHAR-8 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NARMADA VIHAR-8?

The registered promoter entity is RITESH R. SHARMA, ADITYA R. SHARMA, RAGHAV R. SHARMA, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NARMADA VIHAR-8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NARMADA VIHAR-8?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NARMADA VIHAR-8?

The professionals named in the filing: Architect: Umesh Lamge; Engineer: Hitendra Sharma; Chartered Accountant: Prashant Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NARMADA VIHAR-8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NARMADA VIHAR-8. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NARMADA VIHAR-8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.