Home / Browse projects / Mumbai Suburban, Maharashtra / Narang Castella

Registered Litigation declared Residential / Group Housing project

Narang Castella

By Narang Realty Private Limited

RG-MH-87809 · RERA PR1180002600545 · Last updated on MahaRERA portal: 31 Mar 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2032Possession promisedno revision filed
0 of 10Construction stages donefurthest along: Excavation, 0%
45 of 45Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 10 documents Report an error

Narang Castella is a Residential / Group Housing project by Narang Realty Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as PR1180002600545 on 26 May 2026. Possession is promised by 31 Mar 2032. 0 of the 45 units on this registration are recorded sold or booked, and 0 of 10 construction stages are filed complete.

At a glance

Project

  • NameNarang Castella
  • TypeResidential / Group Housing
  • Location
    • Kane Road
    • Bandra West
    • Bandra
    • CTSO Bandra
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1180002600545
  • ReraGenie IDRG-MH-87809

Builder

  • NameNarang Realty Private Limited
  • Entity typeCompany
  • CINU70109MH2012PTC234628
  • GSTIN27AAECN1432G1ZR
  • DirectorsGopal Madhawdas Narang, Sangeeta Gopal Narang, Soham Gopal Narang, Advait Gopal Narang
  • Other registrations4 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredMay 2026PromisedMar 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 May 2026
  • Promised completion31 Mar 2032
  • Revised completionNone
  • Buildings1 building record
  • Documents filed10 files

Current status

0%0 of 45 units booked

Figures as on 31 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Narang CastellaNA342545045

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 10 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Narang Castella: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed186

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots186
Stilt / Ground27
Basement153
Stack Parking6

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,102 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2026
LandownerVillageDistrict
Asit Premises Cooperative Society LimitedBandraMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI11350.19
Proposed, not sanctioned11,350 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No 3, Shailaja CHS, 50 Pali Hill Road, Bandra West, Mumbai.400050, Maharashtra

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. VISHWAS SATODIA
EngineerSameer Gandhi
Chartered AccountantHarsh Ruparelia & CO.
PartnerRole in project
Narang Realty Private Limited-

Litigation declared4

CaseCourtStatus
1409/2018/2018THE CITY CIVIL COURT AT DINDOSHIOngoing
2544/2018/2018THE CITY CIVIL COURT AT DINDOSHIOngoing
65 OF 2021/2021HIGHT COURT OF BOMBAYOngoing
66 OF 2021/2021HIGHT COURT OF BOMBAYOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Mar 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2032

Documents filed10

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration and undertaking (Annexure A)File: Annexure A-Narang Castella.pdf31 Mar 2026
Building plan approvalFile: Revised IOA Letter of Asit 20251224.pdf3 Mar 2026
Building plan approvalFile: Revised IOA Plans of Asit-1.pdf3 Mar 2026
Building plan approvalFile: Revised IOA Plans of Asit-2.pdf3 Mar 2026
Building plan approvalFile: Revised IOA Plans of Asit-3.pdf3 Mar 2026
Building plan approvalFile: Revised IOA Plans of Asit-4.pdf3 Mar 2026
Building plan approvalFile: Revised IOA Plans of Asit-5.pdf3 Mar 2026
Building plan approvalFile: Revised IOA Plans of Asit-6.pdf3 Mar 2026
Building plan approvalFile: Revised IOA Plans of Asit-7.pdf3 Mar 2026
Building plan approvalFile: Revised IOA Plans of Asit-8.pdf3 Mar 2026

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Narang VivendaP51800055504Ushma Nagar, Malad West, Mumbai Suburban254Apr 2024OngoingDec 2029Not due yet
Narang Privado AP51700077946Off Pokran Road 1, Thane279Nov 2024OngoingMar 2029Not due yet
Narang Privado - CP51700054336Off Pokharan Road No. 1,, Thane221Jan 2024OngoingDec 2028Not due yet
Narang Privado - BP51700050065Off Pokharan Road No. 1, Thane203Mar 2023OngoingMar 2028Not due yet

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Narang Castella on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra West6,700+ in Mumbai Suburban

2 kmNarang CastellaCompleted 32Lapsed / revoked 17Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 89 registered projects within 2 km.

Builder: Narang Realty Private Limited

NARANG REALTY PRIVATE LIMITED has 5 registrations on MahaRERA, including Narang Privado - B and Narang Privado - C. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Narang Castella is delayed beyond 31 Mar 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Narang Castella?

The registered promoter entity is Narang Realty Private Limited, a company as per the filing. Its CIN U70109MH2012PTC234628 and GSTIN 27AAECN1432G1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Narang Castella?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Narang Castella?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Narang Castella?

The professionals named in the filing: Architect: Ar. VISHWAS SATODIA; Engineer: Sameer Gandhi; Chartered Accountant: Harsh Ruparelia & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Narang Castella?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Narang Castella. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Narang Castella to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.