Home / Browse projects / Raigarh, Maharashtra / NANO CITY
NANO CITY
By NIRMAN REALTORS AND DEVELOPERS LTD
RG-MH-20966 · RERA P52000006161 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 3 complaints at MahaRERA
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 4 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NANO CITY is a Residential / Group Housing project by NIRMAN REALTORS AND DEVELOPERS LTD in Raigarh, Maharashtra, registered with MahaRERA as P52000006161 on 14 Aug 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 48 months from the original filing. 3 complaints are on record with the regulator.
At a glance
Project
- NameNANO CITY
- TypeResidential / Group Housing
- Location
- Bopele Road
- NANO CITY
- Bopele
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000006161
- ReraGenie IDRG-MH-20966
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Aug 2017
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 30 Dec 2025)
- Buildings3 building records
- Documents filed74 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOSSOM | NA | 3 | 0 | 0 | 0 | 0 |
| LOTUS | NA | 3 | 0 | 0 | 0 | 0 |
| LILY | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 70%.
BLOSSOM40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 66% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LOTUS0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LILY50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 25% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 2.57 cr | Rs 51.32 lakh |
| BLOSSOM | NA | Rs 2.37 cr | Rs 1.07 cr |
| LOTUS | NA | Rs 2.37 cr | Rs 1.07 cr |
| LILY | NA | Rs 2.37 cr | Rs 1.07 cr |
Certifying professionals and partners11
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aaditya Anil Suryavanshi |
| Architect | Rushika Sawant |
| Engineer | RUPESH |
| Engineer | Er. Rajesh Sundar Arunachalam |
| Engineer | Er.Nishant Amberkar |
| Engineer | Swaraj P Surana |
| Engineer | Kiran A Kurhade |
| Chartered Accountant | C.A. Mandar B. Bhave HMA & Associates |
| Chartered Accountant | KATARE BARWE & ASSOCIATES |
| Chartered Accountant | Rahul Thakkar |
| Chartered Accountant | Umesh Kamath |
| Partner | Role in project |
|---|---|
| NIRMAN REALTORS AND DEVELOPERS LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project could not be completed within the approved timeline due to unavoidable delays caused by labour shortages, intermittent disruption in availability of construction materials, and delays in statutory approvals from concerned authorities. These factors were beyond the control of the Promoter and impacted the progress of construction.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| COMEX/30/2017 | HIGH COURT | PENDING |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000089945 | Rituraj Parab | Nirman Realtors & Developers Ltd | 02/07/2019 |
| CC006000000090084 | Vandana Vrishanti Kuntewar | Nirman Realtors & Developers Ltd | 11/07/2019 |
| CC12502256 | Hajra Bano Mohammed Gulam Shaikh | NIRMAN REALTORS AND DEVELOPERS LTD | 05/07/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Nano City Form 1 Jun 25.pdf | 24 Dec 2025 |
| Withdrawal Update Form 1File: Nano City Form 1 Sep 25.pdf | 24 Dec 2025 |
| Withdrawal Update Form 2File: Nano City Form 2 June 25.pdf | 24 Dec 2025 |
| Withdrawal Update Form 2File: Nano City Form 2 Sep 25.pdf | 24 Dec 2025 |
| Withdrawal Update Form 3File: Nano City Form 3 Jun 25.pdf | 24 Dec 2025 |
| Withdrawal Update Form 3File: Nano City Form 3 Sep 25.pdf | 24 Dec 2025 |
| Form 2A (FY 2024-2025)File: Nano City Form 2A 2024-25.pdf | 24 Dec 2025 |
| Form 2A (FY 2022-2023)File: Nano City Form 2A 2022-23.pdf | 24 Dec 2025 |
| Form 2A (FY 2023-2024)File: Nnao City form 2A 2023-24.pdf | 24 Dec 2025 |
| Form 3File: Nano City Form 3 O1 2024.pdf | 27 May 2025 |
| Form 3File: Nano City Form 3 Q2 2024.pdf | 27 May 2025 |
| Form 3File: Nano City Form 3 Q3 2024.pdf | 27 May 2025 |
| Form 3File: Nano_city_Form_3_Q4.pdf | 27 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nano City Rera form 1 Q1 June 24.pdf | 23 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nano City Rera Form 1 Q2 Sep 24.pdf | 23 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nano City Rera Form 1 Q3 Dec 24.pdf | 23 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nano City Rera Form 1 Q4 Mar 25.pdf | 23 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nano City Engineer Certificate Form 2 Q1.pdf | 23 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nano City Engineer Certificate Form 2 Q3.pdf | 23 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nano City Engineer Certificate Form2 Q2.pdf | 23 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nano City Engineer Certificate Form 2 Q4.pdf | 23 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nano Form 2 31 dec 2022.pdf | 9 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Nano Form 2A 2022.pdf | 9 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Nano City 2018-19.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Nano City 2019-20.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Nano City 2020-21.pdf | 21 Feb 2023 |
| Declaration in FORM BFile: NRDL.pdf | 24 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nano City - Form 2-compressed.pdf | 9 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Nano City 2020-21.pdf | 14 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Nano City 2019-20.pdf | 14 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Nano City 2020-21.pdf | 14 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Nano City_compressed.pdf | 13 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 Nano City.pdf | 7 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nano Form 2.pdf | 21 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3 Jun 2018 Nano City.pdf | 28 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3 Sep 2018 Nano City.pdf | 28 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3 Dec 2018 Nano City.pdf | 28 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3 Mar 2019 Nano City.pdf | 28 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: nano_city.pdf | 17 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form_1_-_Nano_City.PDF | 17 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form_2_-_Nano_City.PDF | 17 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Nano City 15 Dec 2018.pdf | 25 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nano City 15 Dec 2018.pdf | 25 Jan 2019 |
| Certificates of CA (Form 3)File: Form 3-Nano City_31-03-2018.pdf | 14 Jan 2019 |
| Certificates of CA (Form 5)File: FORM 5 - NANO CITY.pdf | 14 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form_2__nanocity_.PDF | 1 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rera_form_1__nanocity_.PDF | 29 Sep 2018 |
| Certificates of CA (Form 3)File: NANO CITY DEC 2017-ilovepdf-compressed.pdf | 23 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1__Nano_city_.PDF | 20 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2__Nano_City_.PDF | 20 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 form 1 Nano City.PDF | 26 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 form 2 Nano City.PDF | 26 Mar 2018 |
| Certificates of CA (Form 3)File: Certificate of CA.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer.PDF | 30 Jul 2017 |
| Layout approvalFile: Nanocity Approved Plan Final_1.pdf | 29 Jul 2017 |
| Building plan approvalFile: _NANO CITY_ - CC_.pdf | 29 Jul 2017 |
| PAN CardFile: NRDL-Pan Card.PDF | 29 Jul 2017 |
| Copy of the legal title reportFile: Nano City Title Report.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Encumbrances Certificate_1.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Nanocity Approved Plan Final_1.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: _NANO CITY_ - CC_.pdf | 29 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: _NANO CITY_ - CC_.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Form B - Nano City_1FINAL.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-ARCHITECT CERTIFICATE-NANOCITY Revised.PDF | 29 Jul 2017 |
| Proforma of Allotment letterFile: Nanocity - Declaration.pdf | 29 Jul 2017 |
| OtherFile: NANO CITY NA Order_1FINAL.pdf | 29 Jul 2017 |
| OtherFile: NANO CITY Collector Order_1A.pdf | 29 Jul 2017 |
| OtherFile: NRDL Certificate of commencement of business.pdf | 29 Jul 2017 |
| OtherFile: NANO CITYMOU_Between Ishwarbhai Velani and NRDL 18-05-2015_1A.pdf | 29 Jul 2017 |
| OtherFile: NANO CITY Development Agreement between Amrutlal Patel and NRDL_14-04-2008 (1) - FINAL A.p | 29 Jul 2017 |
| OtherFile: NANO CITY Development Agreement between Amrutlal Patel and NRDL_14-04-2008 (3) - FINAL C.p | 29 Jul 2017 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SNEH NIRMAN | VILLAGE CHAMBHAR KIN TALUKA MAHAD | 49 | Completed | Nov 2015 | Jul 2015 |
| MADHU SUMITRA NIRMAN | AT GOREGAON TALUKA MANDGAON | 16 | Completed | Jun 2011 | Jun 2011 |
| SAI NIRMAN | NIRMAN NAGARI VILLAGE NERAL | 107 | Completed | Mar 2011 | Mar 2011 |
| NIRMAN AAKASH | VILLAGE NERAL TALUKA KARJAT | 9 | Completed | Jul 2007 | Jul 2007 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NANO CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NANO CITY5,900+ in Raigarh
Filed coordinates, straight-line distance. 84 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: NIRMAN REALTORS AND DEVELOPERS LTD
NIRMAN REALTORS AND DEVELOPERS LTD has 8 registrations on MahaRERA, including VIVIANA - BLOCK 1 and VIVIANA - BLOCK 2. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if NANO CITY is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NANO CITY?
The registered promoter entity is NIRMAN REALTORS AND DEVELOPERS LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NANO CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NANO CITY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NANO CITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NANO CITY?
The professionals named in the filing: Architect: Aaditya Anil Suryavanshi; Architect: Rushika Sawant; Engineer: RUPESH; Engineer: Er. Rajesh Sundar Arunachalam; Engineer: Er.Nishant Amberkar; Engineer: Swaraj P Surana. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NANO CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback