Home / Browse projects / Pune, Maharashtra / NANDANVAN COLINA

Completed No litigation declared Residential / Group Housing project

NANDANVAN COLINA

By SAI SANKALP DEVELOPERS

RG-MH-24158 · RERA P52100014132 · Last updated on MahaRERA portal: 27 May 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
13 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

NANDANVAN COLINA is a Residential / Group Housing project by SAI SANKALP DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100014132 on 9 Nov 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameNANDANVAN COLINA
  • TypeResidential / Group Housing
  • Location
    • MAHARASHTRA
    • AMBEGAON BK
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014132
  • ReraGenie IDRG-MH-24158

Builder

  • NameSAI SANKALP DEVELOPERS
  • Entity typePartnership
  • PartnersANANTA DHONDIBA MORE, SANTOSH NATHA MANE, NANDKUMAR SAMBHAJI BELDARE, SANDEEP ANANTA MORE, YUVRAJ SAMBHAJI BELDARE
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2017First promiseMar 2021Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Nov 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 29 Mar 2021)
  • Buildings4 building records
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA150000
Building-BNA150000
Building-CNA70000
Row HouseNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 May 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.

Building A76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)25%
Plinth100%
Stilt Floor40%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building-B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building-C80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Row House0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 May 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Open Space3

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,190 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
YUVRAJ SAMBHAJIRAO BELDAREAMBEGAON BkPune
KUNAL SHRIKRISHNA GOLEDhankawadiPune
NANDKUMAR SAMBHAJI BELDAREKatrajPune
PUSHKARAJ SURYAKANT GOLEDhankawadiPune
SHRIKIRSHNA SADASHIV GOLEDhankawadiPune
SWATI SHRIKRISHNA GOLEDhankawadiPune
KUNAL METAL WORKS- PARTNER NO. 01A PUSHKARAJ GOLEAMBEGAON BkPune
KUNAL METAL WORKS-PARTNER 1B SWATI S GOLEAwasari Bk.Pune

Approvals and building plan

Permissible FSI9357.0
Proposed, not sanctioned2,773 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHANKAWADI PUNE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Tarwadi
PartnerRole in project
SAI SANKALP DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009561Mar 2021 → Jun 2021

Reason as filed by the promoterDUE TO COVID-19 CORONA PANDEMIC AND VARIOUS FORCE MAJURE FACTORS LIKE LABOUR PROBLEM, SHORTAGE OF MATERIAL, ETC.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 May 2021

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_compressed.pdf27 May 2022
Disclosure of sold/ booked inventoryFile: Details Regarding Sold and Unsold Flats.pdf27 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_compressed.pdf30 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate 23198-merged-compressed_compressed.pdf30 Jun 2021
Architect’s Certificate on Completion of Project (Form 4)File: Architect Completion Certificate A Wing.pdf17 Jun 2021
Architect’s Certificate on Completion of Project (Form 4)File: Architect Completion Certificate C Wing.pdf17 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect Completion Certificate A Wing.pdf12 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect Completion Certificate C Wing.pdf12 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect Society Formation letter.pdf12 May 2021
Architect’s Certificate on Completion of Project (Form 4)File: Architect Society Formation letter.pdf12 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf6 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf26 Mar 2021
OtherFile: A- Wing Vilas Tarawadi-converted-compressed.pdf17 Feb 2021
OtherFile: C- Wing-converted-compressed.pdf17 Feb 2021
Certificates of CA (Form 3)File: Form 3.pdf11 Nov 2020
OtherFile: A wing vilas tarwadi certificated.pdf11 Nov 2020
OtherFile: C wing mhada Tarwadi certificaed.pdf11 Nov 2020
OtherFile: C Wing Photo 111120.pdf11 Nov 2020
OtherFile: C wing mhada Tarwadi certificaed.pdf11 Nov 2020
Details of Restarting of Construction work post lockdownFile: RERA LETTER.pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A wing vilas tarwadi certificated.pdf9 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: c wing architect certificate.pdf9 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: c wing arc certificate.pdf9 Jun 2020
Certificates of CA (Form 3)File: PG1TO6_compressed.pdf9 Jun 2020
Certificates of CA (Form 3)File: PG7TO10_compressed.pdf9 Jun 2020
OtherFile: A Wing Photo.pdf9 Jun 2020
OtherFile: c wing photo.pdf9 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A wing vilas tarwadi certificated 170220.pdf18 Feb 2020
OtherFile: combinepdf_reduce.pdf18 Feb 2020
OtherFile: combinepdf (1)_reduce.pdf18 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA FORM 5 18-19.pdf3 Feb 2020
Certificates of CA (Form 3)File: ilovepdf_merged-compressed_compressed.pdf18 Jan 2020
OtherFile: A Building Photos_compressed.pdf18 Jan 2020
OtherFile: A wing vilas tarwadi certificated_compressed.pdf18 Jan 2020
OtherFile: C Building photo_compressed.pdf18 Jan 2020
OtherFile: C wing vilas tarwadi certificated_compressed.pdf18 Jan 2020
Certificates of CA (Form 3)File: sai sankalp 001_compressed (1).pdf18 Sep 2019
OtherFile: building photos.pdf18 Sep 2019
OtherFile: vilas tarwadi A Wing Certificated.pdf18 Sep 2019
OtherFile: building photos.pdf18 Sep 2019
OtherFile: vilas tarwadi A Wing Certificated.pdf18 Sep 2019
OtherFile: DECLARATION.pdf29 Aug 2019
Certificates of CA (Form 3)File: 2019-08-13 1234.pdf13 Aug 2019
Certificates of CA (Form 3)File: Sai sankalp 001-compressed.pdf25 Jul 2019
Certificates of CA (Form 5)File: RERA FORM 5.pdf17 Jul 2019
Certificates of CA (Form 3)File: SAI SANKALP 001 (1)_compressed.pdf13 Jul 2019
OtherFile: Building photos.pdf13 Jul 2019
OtherFile: Vilas Tarawadi Arc Certificate.pdf13 Jul 2019
OtherFile: Building Photos plastering, etc.pdf20 Feb 2019
Certificates of CA (Form 3)File: FORM 3.pdf12 Feb 2019
Certificates of CA (Form 3)File: sachin 1.pdf29 Nov 2018
Certificates of CA (Form 3)File: sachin 2.pdf29 Nov 2018
Certificates of CA (Form 3)File: sachin 3.pdf29 Nov 2018
Certificates of CA (Form 3)File: sachin 4.pdf29 Nov 2018
OtherFile: 2.pdf29 Nov 2018
OtherFile: 1.pdf29 Nov 2018
OtherFile: 3.pdf29 Nov 2018
OtherFile: Building 6 to 8 Slap.pdf17 Nov 2018
OtherFile: Building 9 to 11 Slap.pdf17 Nov 2018
OtherFile: Building Photo Internal.pdf17 Nov 2018
OtherFile: Building Water Tank.pdf17 Nov 2018
Details of encumbrancesFile: Non Encumbrance Certificate.pdf30 Jun 2018
Declaration in FORM BFile: Affidavit cum declaration compressed.pdf30 Jun 2018
Certificates of CA (Form 3)File: Form 3 compressed.pdf30 Jun 2018
OtherFile: Floor 1 to 5.pdf8 Jun 2018
OtherFile: Floor 6 to 10.pdf8 Jun 2018
OtherFile: Building Photos.pdf8 Jun 2018
OtherFile: FIRE NOC LETTER.pdf8 Jun 2018
OtherFile: Revised Provisional Fire NOC request.pdf8 Jun 2018
Building plan approvalFile: Approved Project Plan.pdf16 Mar 2018
Building plan approvalFile: Approved Project Plan.pdf16 Mar 2018
Copy of the legal title reportFile: NA Order.pdf16 Mar 2018
Building Plan Approval (IOD)File: Approved Project Plan.pdf16 Mar 2018
Building Plan Approval (IOD)File: Approved Project Plan.pdf16 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf16 Mar 2018
OtherFile: Site Photos 1.pdf16 Mar 2018
OtherFile: NA Order.pdf16 Mar 2018
OtherFile: Sole Selling Agreement Final.pdf16 Mar 2018
Building plan approvalFile: Block Plan.pdf30 Aug 2017
Layout approvalFile: Building Layout.pdf30 Aug 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 9 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANDANVAN COLINA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBEGAON BK13,700+ in Pune

2 kmNANDANVAN COLINACompleted 80Lapsed / revoked 36Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: SAI SANKALP DEVELOPERS

SAI SANKALP DEVELOPERS has 3 registrations on MahaRERA, including NANDANVAN COLINA and NANDANVAN COLINA. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NANDANVAN COLINA is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANDANVAN COLINA?

The registered promoter entity is SAI SANKALP DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANDANVAN COLINA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NANDANVAN COLINA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANDANVAN COLINA?

The professionals named in the filing: Architect: Vilas Tarwadi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANDANVAN COLINA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANDANVAN COLINA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANDANVAN COLINA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.