Red flags

  • 10 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
65 of 242Construction stages doneacross 22 buildings; furthest along: External plumbing and external plaster, 95%
10Complaints at MahaRERAon this registration
Jump to the 270 documents Report an error

NANDADEEP RESIDENCY is a Residential / Group Housing project by NANDADEEP HOMES PVT. LTD. in Raigarh, Maharashtra, registered with MahaRERA as P51700009698 on 22 Aug 2017. Possession is promised by 30 Dec 2028. 10 complaints are on record with the regulator.

At a glance

Project

  • NameNANDADEEP RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Wadavali
    • Karjat
    • wadawali t waredi
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700009698
  • ReraGenie IDRG-MH-24282

Builder

  • NameNANDADEEP HOMES PVT. LTD.
  • Entity typeCompany
  • DirectorsSURESH VITTHAL JUNGHARE, SUBHASH VITTHAL KADAM, SHANKAR TANAJI GOLE
  • Other registrations1 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings22 building records
  • Documents filed270 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 2NA60000
A1NA50000
A2NA50000
A3NA50000
A4NA50000
A5NA50000
A6NA50000
A7NA50000
A8NA50000
A9NA50000
A10NA50000
A11NA50000
A12NA50000
A13NA50000
A14NA50000
B1NA50000
B2NA50000
C1NA50000
C2NA50000
C3NA50000
C4NA50000
C5NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 20 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 22 buildings; the table lists the first 20.

65 of 242 construction stages are filed complete across 22 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

BUILDING NO 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A349%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A449%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A100%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A110%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A120%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A130%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A140%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C378%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 20 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes80%
Street LightingYes0%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes40%
Open ParkingYes20%
TEMPLEYes40%
SWIMMING POOLYes50%
FITNESS ROOMYes50%

Parking filed1211

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,211
Closed/Covered13
Open Space1,198
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 213158171
A105050
A205050
A305050
A405050
A505050
A605050
A705050
A805050
A905050
A1005050
A1105050
A1205050
A1305050
A1405050
B106060
B206060
C104545
C204040
C304545
C404545
C504545

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Shri Ganesh Bandu DanavaleNavi Mumbai (M Corp.)Thane
Sugoni Project Private LimitedKalamboliRaigarh

Approvals and building plan

Sanctioning authorityOffice of District Collector and District Magistrate Raigad- Alibaug
Permissible FSI21731.09
Proposed, not sanctioned15,491 sq m
Buildings approved22
Buildings sanctioned22

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR 6, VASHI, NAVI MUMBAI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectP S GOKAK
EngineerKANTILAL K PATEL
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
NANDADEEP HOMES PVT. LTD.-

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC006000000192463Ramesh Namdev ChavanM/s. Nandadeep Homes Pvt. Ltd.02/03/2020
CC006000000397060Ramesh Namdev ChavanNandadeep Homes Pvt.Ltd14/08/2023
CC006000000397061Ramesh Namdev ChavanNandadeep Homes Pvt.Ltd14/08/2023
CC006000000397062Ramesh Namdev ChavanNandadeep Homes Pvt.Ltd14/08/2023
CC006000000397063Ramesh Namdev ChavanNandadeep Homes Pvt. Ltd14/08/2023
CC006000000397064Ramesh Namdev ChavanNandadeep Homes Pvt.Ltd14/08/2023
CC006000000397065Ramesh Namdev ChavanNandadeep Homes Pvt. Ltd14/08/2023
CC006000000397067Ramesh Namdev ChavanNandadeep Homes Pvt. Ltd14/08/2023
CC006000000397068Ramesh Namdev ChavanNandadeep Homes Pvt.Ltd14/08/2023
CC12400755Laxmi AgarwalNANDADEEP HOMES PVT. LTD.13/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed270

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 270 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Sold and Booked InventoryFile: 11 Sold Booked - Q3 Dec 25.pdf20 Mar 2026
Form 1File: MI Architecture and Design 2.pdf20 Mar 2026
Form 2File: 11 Form 2 - Q3 Dec 25.pdf20 Mar 2026
Form 3File: 11 Form-3 Nandadeep - Q3 25-26 (1).pdf20 Mar 2026
Form 1File: Form 1 - Sept 25.pdf20 Mar 2026
Form 2File: 10 Form 2 - Q2 Sept 25.pdf20 Mar 2026
Form 3File: 10 Form-3 Nandadeep - Q2 25-26 (1).pdf20 Mar 2026
Disclosure of Sold and Booked InventoryFile: 10 Sold Booked - Q2 Sept 25.pdf20 Mar 2026
Form 3File: 1 Form-3 Nandadeep - Q1 23-24 (1).pdf27 Feb 2026
Form 2File: 1 Form 2 - Q1 June 23.pdf27 Feb 2026
Form 1File: 2 Form 1 - June 23.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Sold Booked - Q1 June 23.pdf27 Feb 2026
Form 1File: 3 Form 1 - Sept 23.pdf27 Feb 2026
Form 2File: 2 Form 2 - Q2 Sept 23.pdf27 Feb 2026
Form 3File: 2 Form-3 Nandadeep - Q2 23-24 (1).pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 2 Sold Booked - Q2 Sept 23.pdf27 Feb 2026
Form 1File: 4 Form 1 - Dec 23.pdf27 Feb 2026
Form 2File: 3 Form 2 - Q3 Dec 23.pdf27 Feb 2026
Form 3File: 3 Form-3 Nandadeep - Q3 23-24 (1).pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 3 Sold Booked - Q3 Dec 23.pdf27 Feb 2026
Form 1File: 5 Form 1 - Mar 24.pdf27 Feb 2026
Form 2File: 4 Form 2 - Q4 Mar 24.pdf27 Feb 2026
Form 3File: 4 Form-3 Nandadeep - Q4 23-24 (1).pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 4 Sold Booked - Q4 Mar 24.pdf27 Feb 2026
Form 1File: 6 Form 1 - June 24.pdf27 Feb 2026
Form 2File: 5 Form 2 - Q1 June 24.pdf27 Feb 2026
Form 3File: 5 Form-3 Nandadeep - Q1 24-25 (1).pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 5 Sold Booked - Q1 June 24.pdf27 Feb 2026
Form 1File: 7 Form 1 - Sept 24.pdf27 Feb 2026
Form 2File: 6 Form 2 - Q2 Sept 24.pdf27 Feb 2026
Form 3File: 6 Form-3 Nandadeep - Q2 24-25 (1).pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 6 Sold Booked - Q2 Sept 24.pdf27 Feb 2026
Form 1File: 8 Form 1 - Dec 24.pdf27 Feb 2026
Form 2File: 7 Form 2 - Q3 Dec 24.pdf27 Feb 2026
Form 3File: 7 Form-3 Nandadeep - Q3 24-25 (1).pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 7 Sold Booked - Q3 Dec 24.pdf27 Feb 2026
Form 1File: 9 Form 1 - Mar 25.pdf27 Feb 2026
Form 2File: 8 Form 2 - Q4 Mar 25.pdf27 Feb 2026
Form 3File: 8 Form-3 Nandadeep - Q4 24-25 (1).pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 8 Sold Booked - Q4 Mar 25.pdf27 Feb 2026
Form 1File: 10 Form 1 - June 25.pdf27 Feb 2026
Form 2File: 9 Form 2 - Q1 June 25.pdf27 Feb 2026
Form 3File: 9 Form-3 Nandadeep - Q1 25-26 (2).pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 9 Sold Booked - Q1 June 25.pdf27 Feb 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Nandadeep Residency as on 2022-23.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Nandadeep Residency as on June 2022.pdf25 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Nandadeep Residency as on September 2022.pdf25 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Nandadeep Residency as on December 2022.pdf25 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Nandadeep Residency as on March 2023.pdf25 Sep 2023
Certificates of CA (Form 3)File: Form 3- Nandadeep Residency as on June 2022_compressed.pdf25 Sep 2023
Certificates of CA (Form 3)File: Form 3- Nandadeep Residency as on September 2022_compressed.pdf25 Sep 2023
Certificates of CA (Form 3)File: Form 3- Nandadeep Residency as on 31-12-2022.pdf25 Sep 2023
Certificates of CA (Form 3)File: Form 3- Nandadeep Residency as on 31-03-2023.pdf25 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on December 2022.pdf4 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on September 2022.pdf4 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on December 2022.pdf4 May 2023
Certificates of CA (Form 3)File: Form 3_Ashwamegh Construction as on December 2022.pdf4 May 2023
Certificates of CA (Form 3)File: Form 3_Ashwamegh Construction September 2022.pdf4 May 2023
Certificates of CA (Form 3)File: Form 3_Ashwamegh Construction as on December 2022.pdf4 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 2018_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 2021_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 DECEMBER 2021_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 2022_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JUNE 2022_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SEPTEMBER 2022_compressed.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 DECEMBER 2022_compressed.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 3 Certificates of CA (Form 5).pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 499.pdf23 Jan 2023
Building plan approvalFile: Nandadeep Layout_compressed.pdf12 Jan 2023
Building Plan Approval (IOD)File: Nandadeep Layout_compressed.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nandadeep Residency as on March 2022.pdf1 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nandadeep Residency as on March 2022.pdf1 Nov 2022
Certificates of CA (Form 3)File: Form 3_Nandadeep Homes_marcH 2022.pdf1 Nov 2022
Certificates of CA (Form 3)File: Form 3_Nandadeep Homes_Sept 2021 (2).pdf16 Apr 2022
Certificates of CA (Form 3)File: Form 3_Nandadeep Homes_Dec 2021 (1).pdf16 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nandadeep Residency June 2021.pdf24 Nov 2021
Certificates of CA (Form 3)File: Form 3 30th June 2021_compressed.pdf24 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19-20 Nandadeep Residency.pdf24 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21 Nandadeep Residency.pdf24 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nandadeep March 2021_compressed.pdf26 Aug 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SIDDHIVINAYAKNEAR GAVHAN VILLAGE SECTOR 8B ULWE NAVI MUMBAI14CompletedMar 2014Late, Jun 2016
ASHTAVINAYAK CHSOPP NERUL URAN RAILWAY TRACK SECTOR 8F ULWE NAVI MUMBAI14CompletedMay 2013Late, Sep 2015
SARASWATI KRUPASECTOR 10 KHARGHAR NAVI MUMBAI9CompletedApr 2011Late, Jun 2013

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANDADEEP RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karjat5,900+ in Raigarh

2 kmNANDADEEP RESIDENCYCompleted 3Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: NANDADEEP HOMES PVT. LTD.

NANDADEEP HOMES PVT. LTD. has 2 registrations on MahaRERA, including NANDADEEP RESIDENCY and Gokuldham Residency. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if NANDADEEP RESIDENCY is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANDADEEP RESIDENCY?

The registered promoter entity is NANDADEEP HOMES PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANDADEEP RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NANDADEEP RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NANDADEEP RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANDADEEP RESIDENCY?

The professionals named in the filing: Architect: P S GOKAK; Engineer: KANTILAL K PATEL; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANDADEEP RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANDADEEP RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANDADEEP RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.