ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Namrata Sarvam

Registered No litigation declared Residential / Group Housing project

Namrata Sarvam

By NAMRATA KHANDGE VENTURES

RG-MH-05203 · RERA P52100077476 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Rs 15.00 crore secured on the land, in favour of HDFC BANK LTD
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 45%
8 of 84Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Namrata Sarvam is a Residential / Group Housing project by NAMRATA KHANDGE VENTURES in Pune, Maharashtra, registered with MahaRERA as P52100077476 on 16 Aug 2024. Possession is promised by 30 Dec 2027. 76 of the 84 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameNamrata Sarvam
  • TypeResidential / Group Housing
  • Location
    • Talegaon Chakan Road
    • Mhada Colony
    • Talegaon Dabhade (M Cl)
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • RERA no.P52100077476
  • ReraGenie IDRG-MH-05203

Builder

  • NameNAMRATA KHANDGE VENTURES
  • Entity typePartnership
  • GSTIN27AAIFN7339R1ZC
  • PartnersJay Shailesh Shah, Ravi Deepak Shah, Deepak Kantilal Shah
  • Other registrations2 more →

Key dates

this monthRegisteredAug 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Aug 2024
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed100 files

Current status

90%76 of 84 units booked
74.1%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing GNA8742042
Wing JNA8742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 45%.

Wing G44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing J42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26
BuildingClosed/CoveredTotal
Wing G1111
Wing J1515

Land and ownership8

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,730 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared present
Charge in favour ofHDFC BANK LTD
Secured amountRs 15.00 crore
CERSAI search filedYes
Declared on19 Jan 2026
LandownerVillageDistrict
Ravindra Pandurang KhandgeTalegaon Dabhade (M Cl)Pune
Rupali Ravindra KhandgeTalegaon Dabhade (M Cl)Pune
Ronit Ravindra KhandgeTalegaon Dabhade (M Cl)Pune
Riva Ravindra KhandgeTalegaon Dabhade (M Cl)Pune
Dilip Pandurang KhandgeTalegaon Dabhade (M Cl)Pune
Neelam Dilip KhandgeTalegaon Dabhade (M Cl)Pune
Hrushikesh Dilip KhandgeTalegaon Dabhade (M Cl)Pune
Poonam Amol WalkeTalegaon Dabhade (M Cl)Pune

Approvals and building plan

Sanctioning authorityTalegaon Dabhade Municipal Council
Permissible FSI4931.52
Proposed, not sanctioned4,932 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchV B CAPITAL OPP HOTEL SYMPHONY RANGE HILL ROAD BHOSALE NAGAR SHIVAJINAGAR PUNE MAHARASHTRA 411007
Estimated costRs 14.44 cr
Cost incurredRs 10.70 cr
Work done74.06%
BuildingWingEstimatedIncurred
Wing GNARs 6.62 crRs 5.17 cr
Wing JNARs 6.62 crRs 5.17 cr
-NARs 1.20 crRs 36.43 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR D Rathod and Associates
EngineerYogendra Girase
EngineerNikhil Mukesh Patil
EngineerSanjivani Ade
Chartered AccountantSSAP & Associates LLP
Chartered AccountantM/s. DHARINI NASWA &ASSOCIATES
PartnerRole in project
NAMRATA KHANDGE VENTURES-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
SM12600235Ram GawaliNAMRATA KHANDGE VENTURES06/04/2026
SM12500099Ram GawaliNAMRATA KHANDGE VENTURES02/09/2025
SM12600180Ram GawaliNAMRATA KHANDGE VENTURES23/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: NKV_GJ Wing_Form1_31032026.pdf18 Apr 2026
Withdrawal Update Form 2File: NKV_GJ Wing_Form 2_31032026.pdf18 Apr 2026
Withdrawal Update Form 3File: NKV_GJ Wing_Form 3_31032026.pdf18 Apr 2026
Withdrawal Update Form 1File: Namrata Sarvam_GJ_Form 1_Dec 2025.pdf16 Jan 2026
Withdrawal Update Form 2File: Namrata Sarvam_GJ Wing_Form 2_Dec 2025.pdf16 Jan 2026
Withdrawal Update Form 3File: Namrata Sarvam_GJ_Form 3_Dec 2025.pdf16 Jan 2026
Building plan approvalFile: Plan 1_Layout Plan.pdf13 Oct 2025
Building plan approvalFile: Plan 6_Wing G and H.pdf13 Oct 2025
Building plan approvalFile: Plan 7_Wing I and J.pdf13 Oct 2025
Withdrawal Update Form 1File: Namrata Sarvam G and J_Form 1_30092025.pdf10 Oct 2025
Withdrawal Update Form 2File: Namrata Sarvam_Form2_GJ_30092025.pdf10 Oct 2025
Withdrawal Update Form 3File: Namrata Sarvam_GJ_Form 3_30092025.pdf10 Oct 2025
Form 5 (FY 2024-2025)File: Namrata Sarvam_Form 5_P52100077476.pdf6 Oct 2025
Building plan approvalFile: Plan 1.pdf5 Aug 2025
Building plan approvalFile: Plan 6_Wing G and H.pdf5 Aug 2025
Building plan approvalFile: Plan 7_Wing I and J.pdf5 Aug 2025
Withdrawal Update Form 1File: Namrata Khandge_Form 1_Revised.pdf18 Jul 2025
Withdrawal Update Form 1File: Namrata Khandge_Form 1_Revised.pdf18 Jul 2025
Withdrawal Update Form 1File: Namrata Sarvam_G and J_Form 1_30062025.pdf18 Jul 2025
Withdrawal Update Form 1File: Namrata Sarvam_G and J_Form 1_30062025.pdf18 Jul 2025
Withdrawal Update Form 2File: Namrata Sarvam G and J _Form 2_30062025.pdf18 Jul 2025
Withdrawal Update Form 2File: Namrata Sarvam G and J _Form 2_30062025.pdf18 Jul 2025
Withdrawal Update Form 2File: Namrata Sarvam G and J _Form 2_30062025.pdf18 Jul 2025
Withdrawal Update Form 2File: Namrata Sarvam G and J _Form 2_30062025.pdf18 Jul 2025
Withdrawal Update Form 3File: Namrata Sarvam_G and J _Form 3_30062025.pdf18 Jul 2025
Withdrawal Update Form 3File: Namrata Sarvam_G and J _Form 3_30062025.pdf18 Jul 2025
Withdrawal Update Form 3File: Namrata Sarvam_G and J _Form 3_30062025.pdf18 Jul 2025
Withdrawal Update Form 3File: Namrata Sarvam_G and J _Form 3_30062025.pdf18 Jul 2025
Form 1File: Namrata Sarvam_G and J_Form 1_30062025.pdf15 Jul 2025
Form 2File: Namrata Sarvam G and J _Form 2_30062025.pdf15 Jul 2025
Form 3File: Namrata Sarvam_G and J _Form 3_30062025.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Namrata Sarvam G and J_Sold unsold inventory_30062025.pdf15 Jul 2025
Form 120 Jun 2025
Form 220 Jun 2025
Form 3File: 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)_31032025.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory_31032025.pdf20 Jun 2025
Form 120 Jun 2025
Form 220 Jun 2025
Form 3File: 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)_31122024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory_31122024.pdf20 Jun 2025
Form 1File: 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)_30092024.pdf20 Jun 2025
Form 220 Jun 2025
Form 3File: 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)_30092024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory_31122024.pdf20 Jun 2025
Form 2A (FY 2024-2025)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (3).pdf20 Jun 2025
Disclosure of sold/ booked inventoryFile: Namrata Sarvam GJ_Information of sold_booked.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Namrata Khandge_GJ_Form 2A_2024-25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Sarvam GJ Wing_Form 1_March 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Namrata Sarvam G and J_Form 3_March 2025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Namrata Sarvam G and J_Form 2_March 2025.pdf18 Apr 2025
Layout approvalFile: plan 1.pdf7 Apr 2025
Building plan approvalFile: Plan 6.pdf7 Apr 2025
Building plan approvalFile: Plan 9.pdf7 Apr 2025
Copy of Layout Approval (in case of layout)File: plan 1.pdf7 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf7 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 9.pdf7 Apr 2025
Proforma of Agreement for saleFile: Agg to Sale Namrata Sarvam_27022025.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Namrata Khandge_CA Cert_Dec 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Namrata Khandge_Engg Cert_Dec 2024_.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Sarvam G and J Wing_Architect Cert_Dec 2024.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Namrata Khnadge_GJ_Information of sold_booked inventory.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Namrata Khandge_G and J _Form 3_Signed.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA NKV_ Sept 2024 RERA FORM 3 SIGNED.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Namrata Khandge_GJ BLDG_Form 2_Sept 2024 Signed.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Khandge_Form 1_Sept 2024 signed.pdf19 Oct 2024
Copy of the legal title reportFile: Namrata Khandge_Title and search_Final_07082024.pdf8 Aug 2024
Other - LegalFile: Namrata Khandge_Correction Deed_07082024.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Khandge_Form 1_Revised.pdf4 Jul 2024
Details of encumbrances concerned to FinanceFile: Namrata Khandge_Declaration of Encumrances concerned to legal_14062024.pdf14 Jun 2024
Details of encumbrances concerned to LegalFile: Namrata Khandge_Declaration of Encumrances concerned to legal_14062024.pdf14 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Namrata Khandge_Form 2_04062024.pdf14 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Namrata Khandge_CA Certificate_10062024.pdf14 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation wrt AGS Final_14062024.pdf14 Jun 2024
Other - TechnicalFile: Namrata Khandge_Declaration cum undertaking_10062024.pdf11 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth Completion Certificate_G and J Wing.pdf10 Jun 2024
Proforma of Agreement for saleFile: Proforma of AGS_Final_05062024.pdf6 Jun 2024
Building plan approvalFile: Plan 1 HIghlighted.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 1 HIghlighted.pdf5 Jun 2024
CERSAI detailsFile: CERSAI Report_05062024.pdf5 Jun 2024
Proforma of Allotment letterFile: Model Form of Allotment Letter_04062024.pdf5 Jun 2024

How this compares with Pune

90%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Namrata Sarvam on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mhada Colony13,700+ in Pune

Builder: NAMRATA KHANDGE VENTURES

NAMRATA KHANDGE VENTURES has 3 registrations on MahaRERA, including Namrata Sarvam and Namrata Sarvam. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Namrata Sarvam is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Namrata Sarvam?

The registered promoter entity is NAMRATA KHANDGE VENTURES, a partnership as per the filing. Its GSTIN 27AAIFN7339R1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Namrata Sarvam?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Namrata Sarvam?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Namrata Sarvam?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Namrata Sarvam?

The professionals named in the filing: Architect: R D Rathod and Associates; Engineer: Yogendra Girase; Engineer: Nikhil Mukesh Patil; Engineer: Sanjivani Ade; Chartered Accountant: SSAP & Associates LLP; Chartered Accountant: M/s. DHARINI NASWA &ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Namrata Sarvam?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Namrata Sarvam. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Namrata Sarvam to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.