Home / Browse projects / Pune, Maharashtra / Nakshatra i-Land Phase 4
Nakshatra i-Land Phase 4
By Ellora Homemakers Pvt. Ltd.
RG-MH-91886 · RERA P52100046743 · Last updated on MahaRERA portal: 2 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Nakshatra i-Land Phase 4 is a Residential / Group Housing project by Ellora Homemakers Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100046743 on 5 Sep 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 95 of the 95 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameNakshatra i-Land Phase 4
- TypeResidential / Group Housing
- Location
- Off Alandi Moshi Road
- Moshi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100046743
- ReraGenie IDRG-MH-91886
Builder
- NameEllora Homemakers Pvt. Ltd.
- Entity typeCompany
- DirectorsAmrut Kanji Nisar, Chetan Babanrao Dheerangi, Kantilal Mavji Patel, Kirit Mavji Patel
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Sep 2022
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed69 files
Current status
Figures as on 2 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B Wing | NA | 14 | 14 | 95 | 0 | 95 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.
B Wing: 24% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 60% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 60% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 40% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 60% |
| Open Parking | Yes | 30% |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| YOGESH BHEL | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Vikas Achalkar |
| Engineer | JW Consultants LLP |
| Chartered Accountant | HM Shah & Associates |
| Partner | Role in project |
|---|---|
| Ellora Homemakers Pvt. Ltd. | - |
Litigation declared7
| Case | Court | Status |
|---|---|---|
| 43/2018 | Civil Court Pimpri | Pending for WS |
| 81/2018 | Civil Court Pimpri | Pending unready Board |
| 84/2018 | Civil Court Pimpri | Pending for Say |
| 1205/2018 | Civil Court Senior Division Pune | Pending Awaiting Summons |
| 54/2020 | NGT | Pending |
| 80/2021 | Civil Judge Senior Division Pune | Pending |
| 5024/2021 | Land Record | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 March 25.pdf | 2 Jul 2026 |
| Form 3File: Form 3 March 2025.pdf | 2 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Phase - 4 MIS.pdf | 2 Jul 2026 |
| Form 2File: Form 2 March 2025_11zon.pdf | 2 Jul 2026 |
| Form 1File: FORM 1 March 24.pdf | 2 Jul 2026 |
| Form 3File: Form 3 March 2024.pdf | 2 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Phase - 4 MIS.pdf | 2 Jul 2026 |
| Form 2File: Form 2 March 2024_11zon.pdf | 2 Jul 2026 |
| Form 1File: FORM 1 Dec 24.pdf | 2 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Phase - 4 MIS.pdf | 2 Jul 2026 |
| Form 2File: FORM 2 DEC 2024_11zon.pdf | 2 Jul 2026 |
| Form 3File: FORM 3 DEC 2024_11zon.pdf | 2 Jul 2026 |
| Form 1File: FORM 1 Dec 23.pdf | 2 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Phase - 4 MIS.pdf | 2 Jul 2026 |
| Form 3File: FORM 3 DEC 2023_11zon.pdf | 2 Jul 2026 |
| Form 2File: FORM 2 DEC 2023_11zon.pdf | 2 Jul 2026 |
| Form 1File: FORM 1 Sept 24.pdf | 2 Jul 2026 |
| Form 2File: Form 2 Sept 2024.pdf | 2 Jul 2026 |
| Form 3File: FORM 3 Sept 2024.pdf | 2 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Phase - 4 MIS.pdf | 2 Jul 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2025.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2025.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 March 25.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Dec 24.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2024.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2024.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase 4 - FORM 5 FY 2023-24.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Dec 2024.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2024.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Sept 24.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 June 24.pdf | 25 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf | 13 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024.pdf | 13 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 March 24.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Dec 23.pdf | 19 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2023_1.pdf | 19 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2023_1.pdf | 19 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Sept 23.pdf | 12 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Phase 4 - FORM 5 FY 2022-23.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2023.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2023.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2023.pdf | 2 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 June 23.PDF | 29 Jun 2023 |
| Proforma of Agreement for saleFile: ELLORA HOMEMAKERS.pdf | 29 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Ellora Homemakers.pdf | 4 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank 70 percent 04-10-2022.pdf | 4 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration About Bank Details 29-08-2022.pdf | 29 Aug 2022 |
| Copy of the legal title reportFile: Ellora_Homemaker_search_compressed-1-11[1].pdf | 13 Aug 2022 |
| Copy of the legal title reportFile: Ellora_Homemaker_search_compressed-12-24[1]_compressed.pdf | 13 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance to Finance.pdf | 13 Aug 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200243906018_For_Asset_Based_Search_03_08_2022_16_38_12_684.pdf | 13 Aug 2022 |
| CERSAI detailsFile: CERSAI Undertaking (1).pdf | 13 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 13 Aug 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 13 Aug 2022 |
| Proforma of Allotment letterFile: AGREEMENT AS PER RERA ELLORA HOMEMAKER.pdf | 13 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: Dev AL.pdf | 13 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Dev AFS.pdf | 13 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Encumberance Certificate - Ellora Homemakers.pdf | 25 Jul 2022 |
| Declaration about Commencement CertificateFile: Declaration Commencement Certificate - Ellora Homemakers.pdf | 25 Jul 2022 |
| Declaration in FORM BFile: Form - B.pdf | 18 Jul 2022 |
| Layout approvalFile: Layout Plan.pdf | 2 Jul 2022 |
| Building plan approvalFile: Plan - B.pdf | 2 Jul 2022 |
| Building plan approvalFile: Plan - B (1).pdf | 2 Jul 2022 |
| PAN CardFile: Ellora Home Makers-Pancad.PDF | 2 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 2 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan - B.pdf | 2 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan - B (1).pdf | 2 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 2 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Nakshatra i-Land Phase 4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Moshi13,700+ in Pune
Filed coordinates, straight-line distance. 151 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Ellora Homemakers Pvt. Ltd.
Ellora Homemakers Pvt. Ltd. has 3 registrations on MahaRERA, including Nakshatra I-Land - 2 and Nakshatra i-Land Phase 4. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Nakshatra i-Land Phase 4 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Nakshatra i-Land Phase 4 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Nakshatra i-Land Phase 4?
The registered promoter entity is Ellora Homemakers Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Nakshatra i-Land Phase 4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Nakshatra i-Land Phase 4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Nakshatra i-Land Phase 4?
The professionals named in the filing: Architect: Ar Vikas Achalkar; Engineer: JW Consultants LLP; Chartered Accountant: HM Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Nakshatra i-Land Phase 4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback