Home / Browse projects / Mumbai Suburban, Maharashtra / NAGESHWAR SRA CHS

Registered No litigation declared Others project

NAGESHWAR SRA CHS

By Vishwambhar Constructions

RG-MH-05824 · RERA P51800053512 · Last updated on MahaRERA portal: 12 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 52%
66 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

NAGESHWAR SRA CHS is a Others project by Vishwambhar Constructions in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053512 on 8 Nov 2023. Possession is promised by 31 Dec 2026. 14 of the 80 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameNAGESHWAR SRA CHS
  • TypeOthers
  • Location
    • WAMAN BOHIR ROAD
    • KANDARPADA
    • Dahisar
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800053512
  • ReraGenie IDRG-MH-05824

Builder

  • NameVishwambhar Constructions
  • Entity typePartnership
  • PartnersRAJESH SUBHASH MHATRE, MOHANA RAJESH MHATRE
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Nov 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed53 files

Current status

18%14 of 80 units booked
41.6%Work done, per cost certificate

Figures as on 12 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
COMPOSITE BUILDING NO 1NA222275580

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 52%.

COMPOSITE BUILDING NO 1: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure52%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks52%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered21

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,097 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2025
LandownerVillageDistrict
RAJESH MHATREDahisarMumbai Suburban

Approvals and building plan

Permissible FSI3048.96
Proposed, not sanctioned3,049 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAXMI APARTMENT, AVDOOT NAGAR, DAHISAR EAST, MUMBAI 68
Estimated costRs 18.65 cr
Cost incurredRs 7.76 cr
Work done41.62%
BuildingWingEstimatedIncurred
COMPOSITE BUILDING NO 1NARs 18.65 crRs 7.76 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY NEVE AND ASSOCIATES
EngineerNITIN KUMAR JAIN
EngineerTUSHAR SAWANT
Chartered AccountantCA AMIT B AGARWAL
PartnerRole in project
Vishwambhar Constructions-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCHITECT RERA CERTIFICATE TILL SEP 2025.pdf12 Dec 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTFICATE TILL SEP 2025.pdf12 Dec 2025
Withdrawal Update Form 3File: FORM 3 CA CERTFICATE TILL SEP 2025.pdf12 Dec 2025
Withdrawal Update Form 1File: FORM 1 Nageshwar CHS RERA TILL JUNE 25.pdf28 Nov 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTFICATE TILL JUNE 2025.pdf28 Nov 2025
Withdrawal Update Form 3File: FORM 3 CA CERTFICATE TILL JUNE 2025.pdf28 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE TILL MAR 25.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTFICATE TILL MAR 2025.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE TILL DEC 2024.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA CERTIFICATE TILL DEC 24.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate TILL DEC 2024.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE TILL SEP 2024.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA CERTIFICATE TILL SEP 24.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate TILL SEP 2024.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE TILL JUNE 2024.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate TILL JUNE 2024.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA CERTIFICATE TILL JUNE 24.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE TILL MAR 24.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_0001.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA CERTIFICATE TILL MAR 24.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE TILL SEP 2023.pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE TILL DEC 2023.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tushar sawant Engineer's certificate till Sep 2023.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tushar Sawant Engineer Certificate TILL DEC 2023.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA CERTIFICATE TILL DEC 2023.pdf12 Feb 2024
Copy of the legal title reportFile: title final.pdf28 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 6 DISCLOSURE OF INTERST MOHANA MHATRE.pdf28 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 6 DISCLOSURE OF INTERST RAJESH MHATRE.pdf28 Oct 2023
Proforma of Agreement for saleFile: final agreement vishwambhar.pdf28 Oct 2023
Details of encumbrances concerned to FinanceFile: No encumbarance self declaration.pdf18 Oct 2023
Details of encumbrances concerned to LegalFile: No encumbarance self declaration.pdf18 Oct 2023
Declaration about Commencement CertificateFile: Declaration about Commencement certificate.pdf18 Oct 2023
CERSAI detailsFile: Cersai Declaration.pdf18 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation report Allotment Letter.pdf18 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Clause copy.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA CERTIFICATE TILL SEP 2023 copy.pdf16 Oct 2023
Proforma of Allotment letterFile: final allotment.pdf16 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: rendorse cc.pdf9 Oct 2023
Declaration in FORM BFile: 1 FORM B.pdf9 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 4 BANK DECLARATION.pdf9 Oct 2023
Building plan approvalFile: SRA Composite Bldg IOA Letter.pdf30 Sep 2023
Layout approvalFile: plan 1.pdf30 Sep 2023
Layout approvalFile: plan 2.pdf30 Sep 2023
Layout approvalFile: plan 3.pdf30 Sep 2023
Layout approvalFile: plan 4.pdf30 Sep 2023
Layout approvalFile: plan 5.pdf30 Sep 2023
Copy of Layout Approval (in case of layout)File: plan 1.pdf30 Sep 2023
Copy of Layout Approval (in case of layout)File: plan 2.pdf30 Sep 2023
Copy of Layout Approval (in case of layout)File: plan 3.pdf30 Sep 2023
Copy of Layout Approval (in case of layout)File: plan 4.pdf30 Sep 2023
Copy of Layout Approval (in case of layout)File: plan 5.pdf30 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: SRA Composite Bldg IOA Letter.pdf30 Sep 2023
PAN CardFile: Vishwambhar Constructions Pan Card.pdf8 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
BHIMASHANKAR HEIGHTSKANDARPADA LINK ROAD DAHISAR WEST135CompletedSep 2021Sep 2021

How this compares with Mumbai Suburban

18%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAGESHWAR SRA CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDARPADA6,700+ in Mumbai Suburban

2 kmNAGESHWAR SRA CHSCompleted 43Lapsed / revoked 38Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 160 registered projects within 2 km.

Builder: Vishwambhar Constructions

Vishwambhar Constructions has 1 registration on MahaRERA, including NAGESHWAR SRA CHS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NAGESHWAR SRA CHS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAGESHWAR SRA CHS?

The registered promoter entity is Vishwambhar Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAGESHWAR SRA CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NAGESHWAR SRA CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAGESHWAR SRA CHS?

The professionals named in the filing: Architect: SANJAY NEVE AND ASSOCIATES; Engineer: NITIN KUMAR JAIN; Engineer: TUSHAR SAWANT; Chartered Accountant: CA AMIT B AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAGESHWAR SRA CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAGESHWAR SRA CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAGESHWAR SRA CHS to a free account