ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / NABHRAJ KALPATARU

Registered No litigation declared Residential / Group Housing project

NABHRAJ KALPATARU

By AKASH RAJESH BUTOLE and RAJESH BALABAX BUTOLE

RG-MH-93922 · RERA P51500054470 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
14 of 110Construction stages doneacross 10 buildings; furthest along: Slabs of Super Structure, 80%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

NABHRAJ KALPATARU is a Residential / Group Housing project by AKASH RAJESH BUTOLE and RAJESH BALABAX BUTOLE in Aurangabad, Maharashtra, registered with MahaRERA as P51500054470 on 25 Jan 2024. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameNABHRAJ KALPATARU
  • TypeResidential / Group Housing
  • Location
    • CHIKALTHANA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431006
  • Pincode431006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500054470
  • ReraGenie IDRG-MH-93922

Builder

  • NameAKASH RAJESH BUTOLE and RAJESH BALABAX BUTOLE
  • Entity typeOthers
  • Named personsAKASH RAJESH BUTOLE, RAJESH BALABAX BUTOLE

Key dates

this monthRegisteredJan 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings10 building records
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 TO 10NA10000
BUILDING NO 11 TO 20NA20000
BUILDING NO 21 TO 30NA10000
BUILDING NO 31 TO 40NA20000
BUILDING NO 41 TO 50NA10000
BUILDING NO 51 TO 60NA20000
BUILDING NO 61 TO 70NA10000
BUILDING NO 71 TO 80NA10000
BUILDING NO 81 TO 90NA10000
BUILDING NO 91 TO 100NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

BUILDING NO 1 TO 1036%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 11 TO 2035%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 21 TO 3042%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 31 TO 4041%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 41 TO 505%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 51 TO 605%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 61 TO 7013%
ActivityProgress
Excavation100%
Basement (if any)20%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 71 TO 8013%
ActivityProgress
Excavation100%
Basement (if any)20%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 81 TO 9011%
ActivityProgress
Excavation80%
Basement (if any)20%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 91 TO 10015%
ActivityProgress
Excavation80%
Basement (if any)40%
Podiums (if any)0%
Plinth40%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes10%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Open Space100
BuildingOpen SpaceTotal
BUILDING NO 1 TO 101010
BUILDING NO 11 TO 201010
BUILDING NO 21 TO 301010
BUILDING NO 31 TO 401010
BUILDING NO 41 TO 501010
BUILDING NO 51 TO 601010
BUILDING NO 61 TO 701010
BUILDING NO 71 TO 801010
BUILDING NO 81 TO 901010
BUILDING NO 91 TO 1001010

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,450 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityChhatrapati Sambhajinagar Municipal Corporation, Chhatrapati Sambhajinagar
Permissible FSI11331.32
Proposed, not sanctioned4,802 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 4, GUT NO 735, RATHI COMPLEX OPP AIRPORT JALNA ROAD AURANGABAD

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANURAG BUTOLE
EngineerANURAG BUTOLE
EngineerPiyush Lohade
Chartered AccountantSUDARSHAN KARWA & CO
PartnerRole in project
AKASH RAJESH BUTOLE and RAJESH BALABAX BUTOLE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Kalpataru Mar 26.pdf25 Apr 2026
Form 2File: Form 2 Kalpataru Mar 26.pdf25 Apr 2026
Form 3File: Form 3 Kalpataru Mar 26.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Kalpataru Mar 26.pdf25 Apr 2026
Form 1File: Form 01 Kalpataru Dec 25.pdf12 Mar 2026
Form 2File: Form 02 Kalpataru Dec 25.pdf12 Mar 2026
Form 3File: Form 03 Kalpataru Dec 25.pdf12 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Kalpataru Dec 25.pdf12 Mar 2026
Form 1File: Form 1 Arch Kalpataru Sep 25.pdf12 Nov 2025
Form 2File: Form 2 Egg Kalpataru Sep 25.pdf12 Nov 2025
Form 3File: Form 3 Declaration Kalpataru Sep 25.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Kalpataru Sep 25.pdf12 Nov 2025
Form 1File: Form 01 Arch Kalpataru (1).pdf6 Aug 2025
Form 2File: Form 02 Engg Kalpataru (1).pdf6 Aug 2025
Form 3File: Form declaration Kalpataru June 25.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Kalpataru (1).pdf6 Aug 2025
Form 1File: Form 01 Arch March 25.pdf3 Jun 2025
Form 2File: Form 2 Eng March 25.pdf3 Jun 2025
Form 3File: Form 3 March 25.pdf3 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Form 3 Kalpataru Dec 24.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Kalpataru Sep 24.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Kalpataru Dec 24.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaratio Form 3 Kalpataru Sep 24.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 Kalpataru Sep 24.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Kalpataru Dec 24.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Kalpataru March 2024_compressed.pdf19 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Kalpataru June 2024_compressed.pdf19 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru March 24 Eng C.pdf19 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru June 24 Eng C.pdf19 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Kalpataru March 24 Q A.pdf19 Aug 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf18 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf18 Jan 2024
Other - LegalFile: New Rera Search Gut no 55,56_compressed.pdf9 Jan 2024
Other - TechnicalFile: CC verification Mail.pdf9 Jan 2024
Other - LegalFile: Kalpataru Joint Declaration.pdf27 Dec 2023
Other - FinanceFile: Kalpataru Bank Declaration.pdf27 Dec 2023
CERSAI detailsFile: ENC CERSAI Declaration.pdf4 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Akash Butole Discloser Of Interest Other Real Estate Project.pdf4 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Kalpataru Format A (New).pdf4 Dec 2023
Layout approvalFile: KALPATARU LAYOUT.pdf2 Dec 2023
Building plan approvalFile: KALPATARU BUILDING.pdf2 Dec 2023
PAN CardFile: Both PANs.pdf2 Dec 2023
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf2 Dec 2023
Details of encumbrances concerned to FinanceFile: ENC DEC FIN.pdf2 Dec 2023
Details of encumbrances concerned to LegalFile: ENC DEC FIN.pdf2 Dec 2023
Copy of Layout Approval (in case of layout)File: KALPATARU LAYOUT.pdf2 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: KALPATARU BUILDING.pdf2 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: KALPATARU CC (SINGLE).pdf2 Dec 2023
Declaration about Commencement CertificateFile: Declaration About Commencement.pdf2 Dec 2023
Declaration in FORM BFile: Form B Kalpataru.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kalpataru.pdf2 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Rajesh Butole Discloser Of Interest Other Real Estate Project.pdf2 Dec 2023
Proforma of Allotment letterFile: Model Form Of Allotment Letter.pdf2 Dec 2023
Proforma of Agreement for saleFile: ATS Draft RERA.pdf2 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf2 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement to sale.pdf2 Dec 2023
Other - FinanceFile: Letter Of Authorisation.pdf2 Dec 2023

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep NABHRAJ KALPATARU on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKALTHANA1,400+ in Aurangabad

2 kmNABHRAJ KALPATARUCompleted 13Lapsed / revoked 1Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: AKASH RAJESH BUTOLE and RAJESH BALABAX BUTOLE

AKASH RAJESH BUTOLE and RAJESH BALABAX BUTOLE has 1 registration on MahaRERA, including NABHRAJ KALPATARU. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if NABHRAJ KALPATARU is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NABHRAJ KALPATARU?

The registered promoter entity is AKASH RAJESH BUTOLE and RAJESH BALABAX BUTOLE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NABHRAJ KALPATARU?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NABHRAJ KALPATARU?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NABHRAJ KALPATARU?

The professionals named in the filing: Architect: ANURAG BUTOLE; Engineer: ANURAG BUTOLE; Engineer: Piyush Lohade; Chartered Accountant: SUDARSHAN KARWA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NABHRAJ KALPATARU?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NABHRAJ KALPATARU. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NABHRAJ KALPATARU to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.