ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Rural, Karnataka / MVN AERO ONE TOWER 4

Registration approved No litigation declared Residential/Group Housing project

MVN AERO ONE TOWER 4

By MF FARMLANDS PRIVATE LIMITED

RG-KA-55836 · RERA PRM/KA/RERA/1250/303/PR/140923/006259 · Last updated on RERA Karnataka portal: 18 May 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 170 documents Report an error

MVN AERO ONE TOWER 4 is a Residential/Group Housing project by MF FARMLANDS PRIVATE LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/140923/006259 on 14 Sep 2023. Possession is promised by 20 Dec 2026.

At a glance

Project

  • NameMVN AERO ONE TOWER 4
  • TypeResidential/Group Housing
  • Location
    • Devanahalli
    • Bengaluru Rural
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1250/303/PR/140923/006259
  • ReraGenie IDRG-KA-55836

Builder

  • NameMF FARMLANDS PRIVATE LIMITED
  • Entity typeCompany
  • CINU01403DL2011PTC213599
  • GSTIN29AAHCM0235B1ZW
  • Authorized SignatorySaurabh Kaushik
  • NaNA
  • DirectorsSaurabh Kaushik, KANTA SHARMA, RUCHIKA SHARMA, SANJEEV SHARMA, VARUN SHARMA
  • Project HeadRAKESH SHARMA
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Sep 2023
  • Promised completion20 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed170 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 4---54054

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesYes-

Land and ownership5

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners5
LandownerVillageDistrict
M/S M.F FARMLANDS PVT LTD--
M/S M.F FARMLANDS PVT LTD--
M/S M.F FARMLANDS PVT LTD--
M/S M.F FARMLANDS PVT LTD--
M/S M.F FARMLANDS PVT LTD--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 21.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 21.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN VENKATESH
EngineerMAQSUD E NAZAR
Chartered AccountantSuresh Anchalia

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed170

As listed on the registration, under the names the promoter filed them with; the newest 80 of 170 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/140923/006259 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate MF RERA Tower 4 QTR-4 25-26.pdf18 May 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 ARCHITECT'S CERTIFICATE TOWER 4 Mar 26 Q4 25-26_compressed.pdf18 May 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineers Certificate Form 6 Tower 4 Q4 25-26 (Mar 26).pdf18 May 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate Tower 4.pdf16 May 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architects Certificate Tower 4 Q3 25-26_compressed.pdf16 May 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer's Certificate Tower 4 Q3 25-26.pdf16 May 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)16 May 2026
Q3 2025-26 KPTCL- BESCOM16 May 2026
Q3 2025-26 Fire and Safety16 May 2026
Q3 2025-26 Airport Authority of India16 May 2026
Q3 2025-26 BSNL/Telecommunication Department16 May 2026
Development Plan OrderFile: DP plan Order (1).pdf1 Sep 2023
Upload CDP map showing the proposed site.File: CDP Map new.pdf1 Sep 2023
sanctioned drawings Floor plansFile: 05 1st Floor Plan and typical 2nd 4th 6th 8th .pdf1 Sep 2023
sanctioned drawings Floor plansFile: 06 Typical 3rd 5th 7th 9th 11th and 13th Floor.pdf1 Sep 2023
sanctioned drawings Floor plansFile: 07 14th Floor plan and Terrace Floor Plan (1).pdf1 Sep 2023
sanctioned drawings Floor plansFile: 03 1st Basement Floor Plan (1).pdf1 Sep 2023
sanctioned drawings Floor plansFile: 02 2nd Basement Floor Plan (2).pdf1 Sep 2023
sanctioned drawings Floor plansFile: 04 Ground Floor Plan 1.pdf1 Sep 2023
Sectional drawingFile: Elevational and sectional drawing.pdf1 Sep 2023
Once again updated area details are incorrect, please update the area details as per the sanctionedFile: MVN TOWER 4 RERA_merged.pdf1 Sep 2023
Please upload the self Engineer's attested Engineer license copyFile: Self attested copy of engineer certificate.pdf1 Sep 2023
Please upload the land calculation sheet as per the guidance value(self-attested with a seal).File: tower 4 calculations (1).pdf1 Sep 2023
Please upload the STP design drawing certified by the concerned Engineer as per the KSPCB guidelineFile: MVN Infrasructure Pvt Ltd MVN AeroOne.pdf1 Sep 2023
Agreement for SaleFile: ATS Draft final .pdf1 Sep 2023
Proforma of the Allotment LetterFile: Empty Allotment Form (2).pdf1 Sep 2023
Tower 4 site plan(Area details)File: SITE PLAN T4 page1compressed.pdf1 Sep 2023
Tower 4 site plan(Area details)File: SITE PLANT4 page2compressed.pdf1 Sep 2023
Profit and Loss (Provisional)File: MF PL 22-23 NEW.pdf16 Aug 2023
Balance sheet(Provisional)File: MF BS 22-23 NEW.pdf16 Aug 2023
Cash flow statement(Provisional)File: MF CF 22-23 NEW.pdf16 Aug 2023
Directors reportFile: Directore Report 22-23 new.pdf16 Aug 2023
Auditor reportFile: Audit report 22-23 new.pdf16 Aug 2023
Bank account name should be as per bank account direction circular.File: Account name clarification letter.pdf16 Aug 2023
Company Name change certificateFile: Fresh Certificate of Incorporation Consequent upon Change of Name-261015.pdf16 Aug 2023
Registration fees not matched with actual total Area of landFile: MVN TOWER 4 SANCTION DRAWING (1).pdf16 Aug 2023
What are all the sources of funds to complete the projectFile: Source of Fund Tower 4.pdf16 Aug 2023
Chartered accountant certificate in prescribed format form -01File: CA letter Form 1-Revised.pdf16 Aug 2023
The area details as per the sanctioned drawingFile: MVN TOWER 4 SANCTION DRAWING (1).pdf16 Aug 2023
Engineer license issued by the local development Authority.(Self attested copy).File: Englineer license.jpg16 Aug 2023
Engineer license issued by the local development Authority.(Self attested copy).File: NNC-Liecence(Maqsud E Nazar).pdf16 Aug 2023
Land calculation sheet as per the guidance value(self-attested with a seal).File: Land calculation sheet.jpg16 Aug 2023
STP design drawing certified by the concerned Engineer as per the KSPCB guidelines along with the SFile: MVN Infrasructure Pvt Ltd MVN Aero-One.pdf16 Aug 2023
BESCOM NOC along with the copy of fee receipt paid towards the power supplyFile: Bescom NOC (3).pdf16 Aug 2023
BESCOM NOC FEE receiptFile: Bescom NoC renewal fee receipt.pdf16 Aug 2023
Proforma agreement for saleFile: ATS Draft final .pdf16 Aug 2023
Proforma of the Allotment LetterFile: Empty Allotment Form.pdf16 Aug 2023
NOC issued by BWSSB along with the copy of fee receipt paid towards NOC.File: Bettakotte doc.pdf16 Aug 2023
source of water supply to the project/building along with the supporting documentsFile: BOREWELL DC NOC.jpg16 Aug 2023
section 3(1) notarized affidavit.File: 3 of 1 notarized affidavit.pdf24 Jul 2023
project specification.File: RERA specification.pdf24 Jul 2023
source of water supply to the project/building along with the supporting documentsFile: Bettakote approval.pdf24 Jul 2023
ORIGINAL MR FOR SNO 28/1 IN FAVOUR OF CHIKKAMUNISHAMI AND CHIKKAMUNIYAPPA NEED TO UPLOAD INSTEAD OFFile: MR-16 28bar1.pdf24 Jul 2023
28/1 NA order for residential purpose for the ful extent 0-53 GFile: converstion NO ALNSR 64-2010-11 sy 28-1 0-21-5.pdf24 Jul 2023
TITLE DEED IN FAVOUR OF ANITHA POORNESH FOR S NO 28/4File: Anitha Purnesh saledeed.pdf24 Jul 2023
NA order of the DC for full extent of 50 G to residential purpose in sno 28/4File: Converstion No ALNSR 99-2016-17 Sy 28-4 0-11gunts.pdf24 Jul 2023
need partition deed in favour of krishnamma for sno 29/2File: partition deed 2008.pdf24 Jul 2023
MR and titles of Amrutha Diwakar for sno 29/3File: partition deed 2008.pdf24 Jul 2023
need MR and titles of Kanthamma for sno 29/4 and NA order of dc for residential usage for full extFile: partition deed 2008.pdf24 Jul 2023
advocate search report neededFile: Legal Opinion.pdf24 Jul 2023
Development PlanFile: Approved DP.pdf24 Jul 2023
CDP map showing the proposed siteFile: VILLAGEMAP _ZONE_ADLR SKETCH.pdf24 Jul 2023
village map showing the proposed siteFile: VILLAGEMAP _ZONE_ADLR SKETCH.pdf24 Jul 2023
Building LicenseFile: Builiding licence -Panchyath.pdf24 Jul 2023
sanctioned drawings Floor plansFile: 05 1st Floor Plan and typical 2nd, 4th, 6th, 8th, 10th, 12th Floor plan.pdf24 Jul 2023
sanctioned drawings Floor plansFile: 06 Typical 3rd, 5th, 7th, 9th, 11th and 13th Floor Plan.pdf24 Jul 2023
sanctioned drawings Floor plansFile: 07 14th Floor plan and Terrace Floor Plan.pdf24 Jul 2023
sanctioned drawings Floor plansFile: 03 1st Basement Floor Plan.pdf24 Jul 2023
sanctioned drawings Floor plansFile: 02 2nd Basement Floor Plan.pdf24 Jul 2023
sanctioned drawings Floor plansFile: 04 Ground Floor Plan (1).pdf24 Jul 2023
sectional drawingsFile: Elevational and sectional drawing.pdf24 Jul 2023
Please upload the Certificate from Registered Engineer indicating the structural safety adopted forFile: Structural stability certificate.pdf24 Jul 2023
Engineer LicenseFile: Eng license acknowledgement.jpeg24 Jul 2023
BESCOM NOCFile: bescom mf noc,.png24 Jul 2023
Agreement for SaleFile: ATS Draft final_rera (1).pdf24 Jul 2023
Proforma of the Allotment LetterFile: Allotment letterdraft.pdf24 Jul 2023
NOC issued by BWSSB alongFile: Bettakote approval.pdf24 Jul 2023
copies with self-attested with a seal/Notarization attestationFile: Selfattested merged copies.pdf24 Jul 2023
Company name mentioned not as per company registration certificate in promoter details.File: Fresh Certificate of Incorporation Consequent upon Change of Name-261015.pdf24 Jul 2023
Registration fees not matched with actual total Area of land.File: MVN TOWER 4 RERA.pdf24 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
MVN Aero One Phase 1Sy No 28/1, 28/4, 29/2, 29/3 & 29/4 Rayasandra village, Devanahalli Taluk , Bengaluru Rural, BengaluruOngoingJul 2025Not delivered

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep MVN AERO ONE TOWER 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

Builder: MF FARMLANDS PRIVATE LIMITED

MF FARMLANDS PRIVATE LIMITED has 3 registrations on RERA Karnataka, including MVN AERO ONE TOWER 4 and MVN AERO ONE T5 & T6. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if MVN AERO ONE TOWER 4 is delayed beyond 20 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MVN AERO ONE TOWER 4?

The registered promoter entity is MF FARMLANDS PRIVATE LIMITED, a company as per the filing. Its CIN U01403DL2011PTC213599 and GSTIN 29AAHCM0235B1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MVN AERO ONE TOWER 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MVN AERO ONE TOWER 4?

The professionals named in the filing: Architect: KIRAN VENKATESH; Engineer: MAQSUD E NAZAR; Chartered Accountant: Suresh Anchalia. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MVN AERO ONE TOWER 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MVN AERO ONE TOWER 4. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MVN AERO ONE TOWER 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.