Home / Browse projects / Nagpur, Maharashtra / MORESHWAR PARK-9
MORESHWAR PARK-9
RG-MH-23689 · RERA P50500079001 · Last updated on MahaRERA portal: 17 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MORESHWAR PARK-9 is a Plotted project by PRASANNA PLANNERS in Nagpur, Maharashtra, registered with MahaRERA as P50500079001 on 31 Jan 2025. Possession is promised by 31 Dec 2029. 88 of the 107 units on this registration are recorded sold or booked.
At a glance
Project
- NameMORESHWAR PARK-9
- TypePlotted
- Location
- MOUZA-WANADONGARI
- WANADONGARI
- Wanadongri
- Hingna
- Nagpur
- 441110
- Pincode441110
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500079001
- ReraGenie IDRG-MH-23689
Builder
- NamePRASANNA PLANNERS
- Entity typePartnership
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jan 2025
- Promised completion31 Dec 2029
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed67 files
Current status
Figures as on 17 Jun 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 65% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 69% |
| Landscaping & Tree Planting | Yes | 55% |
| Street Lighting | Yes | 89% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 65% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 88% |
| Aggregate area of recreational Open Space | Yes | 75% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 6.67 cr | Rs 1.10 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHAWAL HARSHE |
| Engineer | DHAWAL HARSHE |
| Chartered Accountant | CA ANKIT TALREJA |
| Chartered Accountant | GAD & ASSOCIATES |
| Chartered Accountant | SUMIT SANTOSH AGRAWAL |
| Partner | Role in project |
|---|---|
| PRASANNA PLANNERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jan 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 DEC-25 MORESHWAR PARK-9.pdf | 17 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 MORESHWAR PARK 9 MARCH 2026.pdf | 17 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 DECEMBER.pdf | 17 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 17 Jun 2026 |
| Withdrawal Update Form 3File: FORM-3 MORESHWAR PARK-9 DEC-2025 SCAN.pdf | 17 Jun 2026 |
| Withdrawal Update Form 3File: FORM-3 MORESHWAR PARK-9 MAR-2026.pdf | 17 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 SEP 2025.pdf | 19 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 SEP 2025_page-0001.pdf | 19 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 MORESHEAR PARK 9 SEP 2025.pdf | 19 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 SEP 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 SEP 2025_page-0001.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 MORESHEAR PARK 9 SEP 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: form 1 june 2025.pdf | 19 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 SEP 2025.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 JUNE 2025.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 SEP 2025_page-0001.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 JUNE 2025.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 MORESHEAR PARK 9 SEP 2025.pdf | 19 Oct 2025 |
| Building plan approval or NA orderFile: DIPLO MAP-4115_compressed.pdf | 23 Jan 2025 |
| Layout approvalFile: DIPLO MAP-4115_compressed.pdf | 23 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: DIPLO MAP-4115_compressed.pdf | 23 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: DIPLO MAP-4115_compressed.pdf | 23 Jan 2025 |
| Other - TechnicalFile: cc mail moresh.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (2).pdf | 22 Jan 2025 |
| Copy of the legal title reportFile: Title Search Report_page-0001.pdf | 20 Jan 2025 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER_compressed.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 mp 9.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 mp9.pdf | 20 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order (1)_compressed.pdf | 20 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: IMG_0001_compressed.pdf | 20 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Final Map Letter.pdf | 20 Jan 2025 |
| Other - LegalFile: Sale Deed Prasanna Planners_compressed-1-12.pdf | 20 Jan 2025 |
| Other - LegalFile: Sale Deed Prasanna Planners_compressed-13-24.pdf | 20 Jan 2025 |
| Other - LegalFile: Sale Deed Prasanna Planners_compressed-25-36.pdf | 20 Jan 2025 |
| Other - LegalFile: Sale Deed Prasanna Planners_compressed-37-50.pdf | 20 Jan 2025 |
| Other - LegalFile: Sale Deed Prasanna Planners_compressed-51-64.pdf | 20 Jan 2025 |
| Other - LegalFile: PARTNERSHIP DEED_compressed.pdf | 20 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: dev allotment mp9.pdf | 20 Jan 2025 |
| Other - FinanceFile: Sale Deed Prasanna Planners_compressed-1-12.pdf | 20 Jan 2025 |
| Other - FinanceFile: Sale Deed Prasanna Planners_compressed-13-24.pdf | 20 Jan 2025 |
| Other - FinanceFile: Sale Deed Prasanna Planners_compressed-25-36.pdf | 20 Jan 2025 |
| Other - FinanceFile: Sale Deed Prasanna Planners_compressed-37-50.pdf | 20 Jan 2025 |
| Other - FinanceFile: Sale Deed Prasanna Planners_compressed-51-64.pdf | 20 Jan 2025 |
| Other - FinanceFile: PARTNERSHIP DEED_compressed.pdf | 20 Jan 2025 |
| Other - TechnicalFile: Sale Deed Prasanna Planners_compressed-25-36.pdf | 20 Jan 2025 |
| Other - TechnicalFile: qa mp9 (1).pdf | 20 Jan 2025 |
| Other - TechnicalFile: PARTNERSHIP DEED_compressed.pdf | 20 Jan 2025 |
| Other - TechnicalFile: Sale Deed Prasanna Planners_compressed-51-64.pdf | 20 Jan 2025 |
| Other - TechnicalFile: Sale Deed Prasanna Planners_compressed-37-50.pdf | 20 Jan 2025 |
| Other - TechnicalFile: Sale Deed Prasanna Planners_compressed-13-24.pdf | 20 Jan 2025 |
| Other - TechnicalFile: Sale Deed Prasanna Planners_compressed-1-12.pdf | 20 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: dev ats.pdf | 20 Jan 2025 |
| Proforma of Agreement for saleFile: ats mp 9.pdf | 20 Jan 2025 |
| PAN CardFile: Prasanna Planners Pan Card.pdf | 19 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUM FINANCE_page-0001.pdf | 19 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUM LEGAL_page-0001.pdf | 19 Jan 2025 |
| Declaration in FORM BFile: Affidavit Cum Decliaration.pdf | 19 Jan 2025 |
| Declaration about Commencement CertificateFile: FORM D.pdf | 19 Jan 2025 |
| CERSAI detailsFile: CERSAI.pdf | 19 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf | 19 Jan 2025 |
| Details of encumbrances concerned to LegalFile: ENCUM FINANCE_page-0001.pdf | 19 Jan 2025 |
| Details of encumbrances concerned to LegalFile: ENCUM LEGAL_page-0001.pdf | 19 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: INT DEC_PRAKASH CHAPLE.pdf | 19 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: INT DEC_AMIT HEDA.pdf | 19 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: INT DEC_SHAKTI JAISWAL.pdf | 19 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format b.pdf | 19 Jan 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured_Unsecured.pdf | 19 Jan 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MORESHWAR PARK-9 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WANADONGARI2,800+ in Nagpur
A2 Universal
Aditya Anagha Multi State Credit Co-Operat
Nagpur Marina
HOABL Impactum Land Private Limited
CANAL FRONT-02
SHIVAJI LAND BUILDERS AND DEVELOPERS
MAuli Nagar 12
P SQUARE REALTY
KANCHAN NAGARI 7
SHUBH INFRASTRUCTURE
MAULI TOWN- 21
KIRTISAGAR REALTY PRIVATE LIMITED
See every Nagpur project, with the district possession charts
Builder: PRASANNA PLANNERS
PRASANNA PLANNERS has 2 registrations on MahaRERA, including Moreshwar park 4 and MORESHWAR PARK-9. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if MORESHWAR PARK-9 is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MORESHWAR PARK-9?
The registered promoter entity is PRASANNA PLANNERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MORESHWAR PARK-9?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MORESHWAR PARK-9?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MORESHWAR PARK-9?
The professionals named in the filing: Architect: DHAWAL HARSHE; Engineer: DHAWAL HARSHE; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: GAD & ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MORESHWAR PARK-9?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback