Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedno revision filed
4 of 10Construction stages donefurthest along: Slabs of Super Structure, 0%
83 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

MORAYA MAJESTIC is a Mixed project by Moraya Properties in Pune, Maharashtra, registered with MahaRERA as P52100077896 on 13 Nov 2024. Possession is promised by 30 Sep 2028. 22 of the 105 units on this registration are recorded sold or booked, and 4 of 10 construction stages are filed complete.

At a glance

Project

  • NameMORAYA MAJESTIC
  • TypeMixed
  • Location
    • Moshi
    • Borhadewadi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100077896
  • ReraGenie IDRG-MH-18942

Builder

  • NameMoraya Properties
  • Entity typePartnership
  • GSTIN27ABVFM6596P1ZT
  • PartnersDnyaneshwar Vishwanath Kadu, Sameer Vilas Jeurkar

Key dates

this monthRegisteredNov 2024PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Nov 2024
  • Promised completion30 Sep 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed96 files

Current status

21%22 of 105 units booked
18.2%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MORAYA MAJESTIC BUILDING ANA15137827105

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 10 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 0%.

MORAYA MAJESTIC BUILDING A: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed223

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots223
Closed/Covered183
Open Space40

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,095 sq m
Land owned byNot the promoter
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jun 2025
LandownerVillageDistrict
SADHANA ANILKUMAR GOYALPimpriPune
SUCHETA ANILKUMAR GOYALPimpriPune
MEGHA ANILKUMAR GOYALPimpriPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI9070.55
Proposed, not sanctioned9,071 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 20.21, Jarvari Society, Pimple Saudagar, Pune.411027, Maharashtra
Estimated costRs 23.00 cr
Cost incurredRs 4.18 cr
Work done18.17%
BuildingWingEstimatedIncurred
MORAYA MAJESTIC BUILDING ANARs 21.85 crRs 4.18 cr
-NARs 1.15 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKamlesh Kadu
EngineerAmol LAXMAN NIRMAL
EngineerAkshay Shivaji Gaikwad
Chartered AccountantVIJAY
Chartered AccountantV S A P AND COMPANY
PartnerRole in project
Moraya Properties-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q4 Moraya Magestic.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q4 final.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q4 final.pdf18 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26 Moraya Magestic final.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 For FY 2025-26- Q3.PDF16 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A for FY 2024-25.pdf20 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 for FY 2024-25.pdf17 Dec 2025
Layout approvalFile: Plan 22 May 25_rotated.pdf11 Nov 2025
Building plan approvalFile: Plan 22 May 25.pdf11 Nov 2025
Building plan approvalFile: Plan22 May 25_rotated.pdf11 Nov 2025
Building plan approvalFile: Plan 22 May 25 rotated.pdf11 Nov 2025
Layout approvalFile: Final Plan Copy no-01.pdf11 Nov 2025
Building plan approvalFile: Final Plan Copy no-02.pdf11 Nov 2025
Building plan approvalFile: Final Plan Copy no-03.pdf11 Nov 2025
Building plan approvalFile: Final Plan Copy No-04.pdf11 Nov 2025
Withdrawal Update Form 1File: Form 1 FY 2025-26 for Q2.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2 FY 2025-26 for Q2.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3 FY 2025-26 for Q2 Moraya Properties.pdf7 Nov 2025
Withdrawal Update Form 1File: Form 1 Sign.pdf9 Sep 2025
Withdrawal Update Form 2File: Form 02 Sign.pdf9 Sep 2025
Withdrawal Update Form 3File: Final Form 3.pdf9 Sep 2025
Building plan approvalFile: Final Plan Copy no-01.pdf26 Aug 2025
Building plan approvalFile: Final Plan Copy no-02.pdf26 Aug 2025
Building plan approvalFile: Final Plan Copy no-03.pdf26 Aug 2025
Building plan approvalFile: Final Plan Copy No-04.pdf26 Aug 2025
Declaration and undertaking (Annexure A)File: Declaration For Plan Update_0001.pdf26 Aug 2025
Withdrawal Update Form 1File: Form 1 Sign.pdf12 Aug 2025
Withdrawal Update Form 2File: Form 02 Sign.pdf12 Aug 2025
Withdrawal Update Form 3File: Final Form 3.pdf12 Aug 2025
Form 1File: FORM 1 Sign.pdf6 Aug 2025
Form 2File: FORM 2 Sign .pdf6 Aug 2025
Form 3File: FORM 3 Sign.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Promoters Disclosure Q4 FY 2024-25.pdf6 Aug 2025
Layout approvalFile: Plan 1 May 25.pdf19 Jun 2025
Building plan approvalFile: Plan 2 May 25.pdf19 Jun 2025
Building plan approvalFile: Plan 3 May 25.pdf19 Jun 2025
Building plan approvalFile: Plan 4 May 25.pdf19 Jun 2025
Declaration and undertaking (Annexure A)File: Annexure-A - Morya.pdf19 Jun 2025
Form 1File: Form 1 Q3 FY 24-25.pdf19 Jun 2025
Form 2File: Form 2 Q3 FY 24-25.pdf19 Jun 2025
Form 3File: Form 3 Q3 FY 2024-25.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Promoters disclosure Q3 Morya.pdf19 Jun 2025
Other - LegalFile: Screen Shot of PCMC 03-2025.pdf8 May 2025
Declaration about Commencement CertificateFile: Declaration About Comencement Certificate.pdf7 May 2025
Building plan approvalFile: Plan-1.pdf6 May 2025
Building plan approvalFile: Plan 2.pdf6 May 2025
Building plan approvalFile: Plan-3.pdf6 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate.pdf6 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan-1.pdf6 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf6 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan-3.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Q3 FY 2024-25.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Q3 FY 2024-25.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Certificate 4 11 24.pdf4 Nov 2024
Copy of the legal title reportFile: Legal title report pdf18 f.pdf18 Oct 2024
Details of encumbrances concerned to FinanceFile: 14 Encumberance - Legal Done.pdf17 Oct 2024
Details of encumbrances concerned to LegalFile: 14 Encumberance - Legal Done.pdf17 Oct 2024
Details of encumbrances concerned to FinanceFile: Financial encumbrance.pdf15 Oct 2024
Declaration in FORM BFile: Form B Declaration.pdf15 Oct 2024
CERSAI detailsFile: Cersai (1).pdf15 Oct 2024
Details of encumbrances concerned to LegalFile: Financial encumbrance.pdf15 Oct 2024
Other - TechnicalFile: Annexure A Order -50.pdf15 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure for sec unsec.pdf15 Oct 2024
PAN CardFile: Moraya Prop PAN CARD Firm.pdf9 Oct 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01 Signed.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 SIGNED.pdf9 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order Boradewadi.pdf9 Oct 2024
Other - LegalFile: PCMC Mail done.pdf9 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf9 Oct 2024
Deviation Report with respect to Allotment letterFile: 28 No Deviation Report - Allottment Letter Done.pdf9 Oct 2024
Deviation Report with respect to model copy of AgreementFile: 27 No Deviation Report - Agreement to Sale Done.pdf9 Oct 2024
Proforma of Agreement for saleFile: Agreement to sale.pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: IMG Disclosure of Sameer.pdf9 Oct 2024

How this compares with Pune

21%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MORAYA MAJESTIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi13,700+ in Pune

Builder: Moraya Properties

Moraya Properties has 1 registration on MahaRERA, including MORAYA MAJESTIC. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MORAYA MAJESTIC is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MORAYA MAJESTIC?

The registered promoter entity is Moraya Properties, a partnership as per the filing. Its GSTIN 27ABVFM6596P1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MORAYA MAJESTIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MORAYA MAJESTIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MORAYA MAJESTIC?

The professionals named in the filing: Architect: Kamlesh Kadu; Engineer: Amol LAXMAN NIRMAL; Engineer: Akshay Shivaji Gaikwad; Chartered Accountant: VIJAY; Chartered Accountant: V S A P AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MORAYA MAJESTIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MORAYA MAJESTIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MORAYA MAJESTIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.