ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Monte Verita North Annexe

Completed No litigation declared Others project

Monte Verita North Annexe

By M/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.)

RG-MH-29423 · RERA P51800028561 · Last updated on MahaRERA portal: 7 Oct 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Internal walls, 80%
2Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

Monte Verita North Annexe is a Others project by M/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028561 on 19 Mar 2021. The registration is recorded completed; possession was promised by 30 Sep 2025. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMonte Verita North Annexe
  • TypeOthers
  • Location
    • Gulmohar City
    • Gulmohar City
    • Magathane
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800028561
  • ReraGenie IDRG-MH-29423

Builder

  • NameM/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.)
  • Entity typeCompany
  • CINU11100PN2013PTC148582
  • GSTIN27AAFCB8781K2Z2
  • Managing DirectorVijay B Shirke

Key dates

this monthRegisteredMar 2021PromisedSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Mar 2021
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Monte Verita North AnnexeNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

Monte Verita North Annexe: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)1%
Podiums (if any)0%
Plinth1%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,767 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
B G Shirke Redevelopment and Gas pvt. Ltd.Keshavnagar-MundwaPune

Approvals and building plan

Permissible FSI6314.28
Proposed, not sanctioned6,314 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG 004 Ground Floor, Atlanta Building, 209, Nariman Point, Mumbai 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeeksha City Scape
EngineerJayprakash Halse
Chartered AccountantSunderji Gosar and Co
PartnerRole in project
M/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.)-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12400043Ajay Mansingh PawarBharat Atmaram Botle (purchaser)05/09/2024
CC12400060Ajay PawarBhushan M Golatkar09/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Feb 2024

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RIDDHISIDDHI_FORM_5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RIDDHISIDDHI_FORM_5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RIDDHISIDDHI_FORM_5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RIDDHISIDDHI_FORM_5.pdf7 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 -RERA-RiddhiSiddhi.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 North Annexe.pdf26 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OCC of Riddhi Siddhi CHS Magathane dt 29-01-2024 (1).pdf5 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Draft Monte Verita North AFS.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Monte Verita North Annexe - Riddhi Siddhi-Form 2.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Monte Verita North Annexe - Riddhi Siddhi-Form 2.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Monte Verita North Annexe - Riddhi Siddhi-Form 2.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 North_compressed (1).pdf19 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Riddhi Siddhi Form 5 yr 2000 23.pdf22 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riddhi SIddhi Form 3 March 2023.pdf2 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: riddhi siddhi form 3 JUne 2023 MVNA.pdf2 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate 31 March 2022.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Monte Verita North Annexe Form 31 March 2022 compressed.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Riddhi Siddhi 31 december 2022 compressed.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Monte Verita North Annexe Form 5 31 March 2022.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Monte Verita North Annexe Form 5 31 March 2022.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Riddhi SIddhi Page 1 to 5 Part 1.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Riddhi Siddhi Page 6 to 10 Part 2.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riddhi Siddhi Letter for RERA.pdf14 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 Engineers Certificate Dec 2022.pdf8 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Certificate_.pdf20 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Riddhi Siddhi CC RERA Upload .pdf7 Jan 2022
Proforma of Allotment letterFile: MVNA Agreement for Sale Draft.pdf26 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: CC Plan.pdf5 Mar 2021
Declaration in FORM BFile: Affidavite Cum Undertaking from Promoter.pdf5 Mar 2021
Declaration in FORM BFile: Affidavite Cum Undertaking from Owner.pdf5 Mar 2021
Layout approvalFile: Demarcation of Riddhi Siddhi layout.pdf15 Feb 2021
Building plan approvalFile: IOA 1.pdf15 Feb 2021
Building plan approvalFile: IOA page 2.pdf15 Feb 2021
Building plan approvalFile: IOA Page 3.pdf15 Feb 2021
Building plan approvalFile: IOA Page 4.pdf15 Feb 2021
Copy of the legal title reportFile: Title Certificate.pdf15 Feb 2021
Details of encumbrancesFile: Incumbarance Certificate.pdf15 Feb 2021
Copy of Layout Approval (in case of layout)File: Demarcation of Riddhi Siddhi layout.pdf15 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: IOA 1.pdf15 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: IOA page 2.pdf15 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: IOA Page 3.pdf15 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: IOA Page 4.pdf15 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: CC for Plinth.pdf15 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Riddhi SIddhi.pdf15 Feb 2021
Proforma of Allotment letterFile: Riddhi Siddhi Provisional Allotment Letter.pdf15 Feb 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Monte Verita North Annexe on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gulmohar City, Magathane6,700+ in Mumbai Suburban

2 kmMonte Verita North AnnexCompleted 85Lapsed / revoked 48Other 130Dot size: filed unitsN

Filed coordinates, straight-line distance. 263 registered projects within 2 km.

Builder: M/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.)

M/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.) has 1 registration on MahaRERA, including Monte Verita North Annexe. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Monte Verita North Annexe is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Monte Verita North Annexe?

The registered promoter entity is M/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.), a company as per the filing. Its CIN U11100PN2013PTC148582 and GSTIN 27AAFCB8781K2Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Monte Verita North Annexe?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Monte Verita North Annexe?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Monte Verita North Annexe?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Monte Verita North Annexe?

The professionals named in the filing: Architect: Deeksha City Scape; Engineer: Jayprakash Halse; Chartered Accountant: Sunderji Gosar and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Monte Verita North Annexe?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Monte Verita North Annexe. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Monte Verita North Annexe to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.