Home / Browse projects / Raigarh, Maharashtra / MONTAG GREENS

Registered No litigation declared Residential / Group Housing project

MONTAG GREENS

By MONTAG INFRASTRUCTURE PRIVATE LIMITED

RG-MH-45265 · RERA P52000011050 · Last updated on MahaRERA portal: 27 Jul 2026

Source: official MahaRERA filing

Red flags

  • 11 complaints at MahaRERA
  • Completion date moved by 120 months
  • 6 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 120 months from the original
54 of 99Construction stages doneacross 9 buildings; furthest along: Internal walls, 90%
85 of 154Units unsoldnot recorded sold or booked
11Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

MONTAG GREENS is a Residential / Group Housing project by MONTAG INFRASTRUCTURE PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000011050 on 31 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 120 months from the original filing. 69 of the 154 units on this registration are recorded sold or booked, and 54 of 99 construction stages are filed complete. 11 complaints are on record with the regulator.

At a glance

Project

  • NameMONTAG GREENS
  • TypeResidential / Group Housing
  • Location
    • Survey No. 37 (19)
    • Pokharkarwadi
    • Kashele
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000011050
  • ReraGenie IDRG-MH-45265

Builder

  • NameMONTAG INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorAhmed Ali
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 1 Dec 2018)
  • Buildings9 building records
  • Documents filed112 files

Current status

45%69 of 154 units booked

Figures as on 27 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HILL VIEWS TYPE FNA6669069
STUDIO APPT TYPE GNA6616016
STUDIO APPT TYPE GNA5518018
TYPE ENA66606
ITALIAN VILLA TYPE BNA1515505
ITALIAN VILLA TYPE ANA131318018
BRITISH AND SPANISH ROW HOUSES TYPE HNA44808
SPANISH VILLA TYPE CNA77606
BRITISH/SPANISH VILLA TYPE DNA77808

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

54 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Internal walls, at 90%.

HILL VIEWS TYPE F95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
STUDIO APPT TYPE G95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
STUDIO APPT TYPE G95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TYPE E95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ITALIAN VILLA TYPE B95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ITALIAN VILLA TYPE A95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BRITISH AND SPANISH ROW HOUSES TYPE H95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SPANISH VILLA TYPE C95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BRITISH/SPANISH VILLA TYPE D95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered40
Open Space42
BuildingClosed/CoveredOpen SpaceTotal
HILL VIEWS TYPE F40040
ITALIAN VILLA TYPE B01010
ITALIAN VILLA TYPE A088
BRITISH AND SPANISH ROW HOUSES TYPE H01616
SPANISH VILLA TYPE C044
BRITISH/SPANISH VILLA TYPE D044

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,900 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityOffice of the District Collector and District Magistrate, Raigad - Alibag
Permissible FSI11171.98
Proposed, not sanctioned8,895 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSEC 17 VASHI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN AND DIMENTIONS
ArchitectVASUNDHARA ENTERPRISES
EngineerNAUSHAD ALI
Chartered AccountantK hemant & co
PartnerRole in project
MONTAG INFRASTRUCTURE PRIVATE LIMITED-

Extensions applied for6

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000001532Dec 2018 → Dec 2019

Reason as filed by the promoterAs we could not complete the project we request you to extend the completion date of our Project to 1st Dec 2019

EXT52000006107Dec 2018 → Dec 2021

Reason as filed by the promoterDUE TO UNCERTAIN REASON AND COVID 19

EXT52000012056Dec 2018 → Jun 2023

Reason as filed by the promoterDUE TO COVID 19 PANDAMIC WE COULD NOT COMPLETE OUR PROJECT BUT NOW OUR PROJECT IS ALMOST COMPLETE AND WE ARE UNDER PROCESSING OF GETTING OCCUPANCY CERTIFICATE. WE HAVE UPDATED OUR PROJECT PHOTOS FOR YOUR REFERENCE. WE JUST NEED ONE YEAR EXTENSION SO KINDLY DO NEEDFUL.

EXT52000016897Dec 2018 → Jun 2024

Reason as filed by the promoterWe are in process of getting occupancy certificate we just need extension till 29-06-2024

EXT52000024354Dec 2018 → Jun 2026

Reason as filed by the promoterWe are under process of getting occupancy certificate we need extension till 30-06-2026

EA13072621738Dec 2018 → Dec 2028

Reason as filed by the promoter1) Poor booking response from customer. 2) Because of poor reponse our work was very slow.

Complaints filed with MahaRERA11

Case no.ComplainantRespondentFiled
CC006000000078220Ashwin Joseph ManappattyM/s Montag Infrastructure Pvt Ltd26/02/2019
CC006000000303450Sureshchandra parmanand depalaM/s Montag Infrastructure Pvt. Ltd28/11/2022
CC006000000408515Aniket Avinash BapatMontag Infrastructure Pvt. Ltd.16/12/2023
CC006000000591287Ajay Ashok BhosaleMontag Infrastructure24/07/2024
CC006000000591597Bidyut Kumar RoyMontag Infrastructure Pvt Ltd19/08/2024
CC12401257JUDE MELVIN RODRIGUESMONTAG INFRASTRUCTURE PRIVATE LIMITED28/12/2024
CC12502240Jesmine ShahMontag Infrastructure Private Limited05/07/2025
CC12503860TRISHA JITAL MEHTAMONTAG INFRASTRUCTURE PRIVATE LIMITED03/11/2025
CC12503866TRISHA JITAL MEHTAMONTAG INFRASTRUCTURE PRIVATE LIMITED04/11/2025
CC12504002Malti ShahMONTAG INFRASTRUCTURE PRIVATE LIMITED13/11/2025
CC12600811Purnita KaurMONTAG INFRASTRUCTURE PRIVATE LIMITED13/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf27 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf27 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf27 Jul 2026
Form 5 (FY 2023-2024)File: Form - 5 Montag 2023-24 sign.pdf15 Jul 2026
Form 5 (FY 2024-2025)File: Form-5 Montag 2024-25 sign.pdf15 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf13 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf13 Jul 2026
Form 1File: Form 1.pdf22 Jun 2026
Form 2File: Form 2.pdf22 Jun 2026
Form 3File: Form 3.pdf22 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked.pdf22 Jun 2026
Form 1File: Form 1.pdf22 Jun 2026
Form 2File: Form 2.pdf22 Jun 2026
Form 3File: Form 3.pdf22 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked.pdf22 Jun 2026
Form 1File: Form 1.pdf22 Jun 2026
Form 2File: Form 2.pdf22 Jun 2026
Form 3File: Form 3.pdf22 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked.pdf22 Jun 2026
Form 1File: Form 1.pdf22 Jun 2026
Form 2File: Form 2.pdf22 Jun 2026
Form 3File: Form 3.pdf22 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked.pdf22 Jun 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf24 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf24 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3.pdf24 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf24 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf24 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf24 Feb 2025
Declaration in FORM BFile: FORM B.pdf16 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD INV.pdf16 Jul 2024
Certificates of CA (Form 3)File: MONTAG FORM 3.pdf16 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf14 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 signed.pdf29 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - converted.pdf29 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf29 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 31-12-2023.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-2023.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 F Y 2020 - 21 (1).pdf16 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 F Y 2021 - 22 (1).pdf16 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A F Y 2020-21.pdf16 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A F Y 2021 -22.pdf16 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Montag.pdf6 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Montag.pdf6 Dec 2023
Declaration in FORM BFile: Fom B Decleration Montag.pdf26 Jun 2023
Disclosure of sold/ booked inventoryFile: sold unsold montag green new.pdf26 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT NEW.pdf24 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf24 Jun 2023
Disclosure of sold/ booked inventoryFile: sold unsold 31-03-2023.pdf24 Jun 2023
Certificates of CA (Form 3)File: FORM 3 NEW.pdf24 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest in other real estate organization.pdf24 Jun 2023
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter (1).pdf24 Jun 2023
Proforma of Allotment letterFile: allotment letter.pdf24 Jun 2023
Details of encumbrances concerned to FinanceFile: No encumbrances Certificate FINANCE and LEGAL.pdf22 Jun 2023
Details of encumbrances concerned to LegalFile: No encumbrances Certificate FINANCE and LEGAL.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf22 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A bank account decla (14).pdf22 Jun 2023
Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf22 Jun 2023
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf22 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Montag Form 5 (2).pdf15 Apr 2023
Layout approvalFile: NEW PLAN MONTAG.pdf16 Mar 2023
Building plan approvalFile: NEW PLAN MONTAG.pdf16 Mar 2023
Copy of Layout Approval (in case of layout)File: NEW PLAN MONTAG.pdf16 Mar 2023
Building Plan Approval (IOD)File: NEW PLAN MONTAG.pdf16 Mar 2023
Declaration about Commencement CertificateFile: CC Declaration.pdf17 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MONTAG NEW FORM 2A 2020.pdf17 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MONTAG NEW FORM 2A 2021.pdf17 Jun 2022
CERSAI detailsFile: CERSAI Search Report.pdf17 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 MARCH 19.pdf17 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 MARCH 20.pdf17 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 MARCH 21.pdf17 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT.pdf19 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate.pdf19 May 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DWARKADHEESH CITYSURVEY NO 91-P2 BARDIYA VILLAGE DWARKA GUJARAT30CompletedAug 2016Aug 2016
MONTAG VILLASSURVEY NO 196 GANTAVALLEY VILLAGE HYDERABAD50CompletedMar 2014Late, Sep 2014

How this compares with Raigarh

45%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 120 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MONTAG GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pokharkarwadi5,900+ in Raigarh

2 kmMONTAG GREENSCompleted 4Lapsed / revoked 1Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: MONTAG INFRASTRUCTURE PRIVATE LIMITED

MONTAG INFRASTRUCTURE PRIVATE LIMITED has 1 registration on MahaRERA, including MONTAG GREENS. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if MONTAG GREENS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MONTAG GREENS?

The registered promoter entity is MONTAG INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MONTAG GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MONTAG GREENS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MONTAG GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MONTAG GREENS?

The professionals named in the filing: Architect: DESIGN AND DIMENTIONS; Architect: VASUNDHARA ENTERPRISES; Engineer: NAUSHAD ALI; Chartered Accountant: K hemant & co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MONTAG GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MONTAG GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MONTAG GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.