MONARCH SOLITAIRE
RG-MH-87743 · RERA P51700012008 · Last updated on MahaRERA portal: 7 May 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 26 complaints at MahaRERA
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MONARCH SOLITAIRE is a Others project by MONARCH SOLITAIRE LLP in Thane, Maharashtra, registered with MahaRERA as P51700012008 on 1 Sep 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing. 1 of the 1 unit on this registration is recorded sold or booked, and 61 of 176 construction stages are filed complete. 26 complaints are on record with the regulator.
At a glance
Project
- NameMONARCH SOLITAIRE
- TypeOthers
- Location
- Shanti Nagar
- Ulhasnagar-421003
- Ulhasnagar (M Corp.)
- Ulhasnagar
- Thane
- 421003
- Pincode421003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700012008
- ReraGenie IDRG-MH-87743
Builder
- NameMONARCH SOLITAIRE LLP
- Entity typeOthers
- Named personsDHIRAJ KUMAR AILANI, HASMUKH AMARLAL THAKUR, MONARCH UNIVERSAL LIFESCAPES PRIVATE LIMITED
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Sep 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2022)
- Buildings16 building records
- Documents filed49 files
Current status
Figures as on 7 May 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 11 | 7 | 1 | 0 | 1 |
| WING B | NA | 11 | 0 | 0 | 0 | 0 |
| WING C | NA | 11 | 0 | 0 | 0 | 0 |
| WING D | NA | 11 | 0 | 0 | 0 | 0 |
| WING E | NA | 11 | 0 | 0 | 0 | 0 |
| WING F | NA | 11 | 0 | 0 | 0 | 0 |
| WING G | NA | 11 | 0 | 0 | 0 | 0 |
| WING H | NA | 11 | 0 | 0 | 0 | 0 |
| WING I | NA | 11 | 0 | 0 | 0 | 0 |
| WING J | NA | 11 | 0 | 0 | 0 | 0 |
| WING K | NA | 11 | 0 | 0 | 0 | 0 |
| WING L | NA | 11 | 0 | 0 | 0 | 0 |
| WING M | NA | 11 | 0 | 0 | 0 | 0 |
| WING N | NA | 11 | 0 | 0 | 0 | 0 |
| WING O | NA | 11 | 0 | 0 | 0 | 0 |
| WING P | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building16
As on 7 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
61 of 176 construction stages are filed complete across 16 buildings. The stage furthest along is Installation of Lifts, at 95%.
WING A90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
WING B90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
WING C90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
WING D90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
WING E90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
WING F0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING G0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING H0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING I67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 75% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING J68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING K67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 75% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING L48%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 85% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING M0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING N0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING O0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING P0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 45% |
| Water Supply | Yes | 25% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 25% |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | Yes | 25% |
| Community Buildings | Yes | 15% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 20% |
| Solid Waste Management And Disposal | Yes | 20% |
| Water conservation /Rain water harvesting | Yes | 30% |
| Energy managemcnt | Yes | 20% |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | Yes | 35% |
| Open Parking | Yes | 40% |
Parking filed1420
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A | 60 | 29 | 89 |
| WING B | 60 | 29 | 89 |
| WING C | 60 | 29 | 89 |
| WING D | 60 | 29 | 89 |
| WING E | 60 | 29 | 89 |
| WING F | 60 | 29 | 89 |
| WING G | 60 | 29 | 89 |
| WING H | 60 | 29 | 89 |
| WING I | 60 | 29 | 89 |
| WING J | 60 | 29 | 89 |
| WING K | 60 | 29 | 89 |
| WING L | 60 | 29 | 89 |
| WING M | 60 | 29 | 89 |
| WING N | 60 | 29 | 89 |
| WING O | 60 | 29 | 89 |
| WING P | 60 | 25 | 85 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARMANAND HASHMATRAI HOTWANI |
| Engineer | RAVINDRA G. PAWAR |
| Chartered Accountant | TALREJA & CO |
| Partner | Role in project |
|---|---|
| MONARCH SOLITAIRE LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project faced many circumstances which are out of the hands of promoter, our situation is explained in detail in Sr. No. 5 (uploaded in others category). We are also in reciept of regulatory order dt. 23/05/2023 for the grant of extension uptil 31/12/2026. We request you to kindly grant us extension. Please find attached documents in the sequence of Index (Uploaded in Sr. No. 2 under others category)
Complaints filed with MahaRERA26
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000078654 | Shyam Sunder Kedia | M/s Monarch Solitaire LLP | 13/06/2019 |
| CC006000000078655 | Inter Globe Cart Air Ltd | M/s Monarch Solitaire LLP | 13/06/2019 |
| CC006000000000789 | MAHESH JIWATRAM PARIANI | MR HASMUKH AMAR THAKUR | 22/09/2017 |
| CC006000000012050 | Meenu Sanjay Kapoor | Dhiraj Kumar Ailani | 28/11/2017 |
| CC006000000012353 | Meenu Sanjay Kapoor | Dhiraj Kumar Ailani | 09/12/2017 |
| CC006000000012363 | Manohar Sohal | Dhiraj Kumar Ailani | 09/12/2017 |
| CC006000000012415 | Kiran Bhatia | Dhiraj Kumar Ailani | 14/12/2017 |
| CC006000000012432 | Pooja Bhatia | Dhiraj Kumar Ailani | 14/12/2017 |
| CC006000000012438 | Sagar Shailendra Bhatia | Dhiraj Kumar Ailani | 15/12/2017 |
| CC006000000012449 | SagarShailendra Bhatia | Dhiraj Kumar Ailani | 15/12/2017 |
| CC006000000044521 | Inderjeet Singh Pabla | M/s Monarch Solitaire | 04/06/2018 |
| CC006000000198222 | NIRANJAN M TEKCHANDANI | Monarch Solitaire LLP | 06/09/2021 |
| CC006000000198264 | Dema N. Teckchandani | Monarch Solitare LLP | 06/09/2021 |
| CC006000000196412 | Dharmu B Dodeja | DHIRAJ KUMAR AILANI | 20/03/2021 |
| CC006000000209678 | INDERJEET SINGH PABLA | MONARCH SOLITARE LLP | 17/01/2022 |
| CC006000000209710 | Manohar Sohal | Monarch Solitaire LLP | 17/01/2022 |
| CC006000000333814 | Mr Abhishek Lakhwani | Monarch Solitaire LLP | 28/12/2022 |
| CC006000000375332 | Sandeep Makhija | M/s. Monarch Solitaire LLP | 19/04/2023 |
| CC006000000375334 | Sunil Makhija | M/s. Monarch Solitaire LLP | 19/04/2023 |
| CC006000000398051 | Surendra Trithdas Ludhani | Monarch Solitaire LLP | 03/11/2023 |
| CC006000000429497 | Reena K Harchandani and Girdharilal Phagunmal Mewani | Monarch Solitaire LLP | 01/03/2024 |
| CC006000000429501 | Girdharilal Phagunmal Mewani | Monarch Solitaire LLP | 02/03/2024 |
| CC006000000429502 | Girdharilal Phagunmal Mewani | Monarch Solitaire LLP | 02/03/2024 |
| CC12502828 | Surendra Ludhani | MONARCH SOLITAIRE LLP | 13/08/2025 |
| CC12503554 | Prakash Lalwani | MONARCH SOLITAIRE LLP | 06/10/2025 |
| CC12504268 | Suman Surendra Ludhani | MONARCH SOLITAIRE LLP | 03/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 May 2023
Documents filed49
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| OtherFile: OC-A-E-Monarch.pdf | 7 May 2024 |
| Other - TechnicalFile: Uploading-other technical.pdf | 26 Jun 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part-OC-A-E-Monarch.pdf | 22 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A-2019-20_compressed.pdf | 11 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter MONARCH.pdf | 11 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: Draft Sale Agreement MONARCH.pdf | 11 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 MS 31-03-2018.PDF | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 MS 31-03-2019.PDF | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 MS 31-03-2020.PDF | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 MS 31-03-2021.PDF | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 MS 31-03-2021.PDF | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 MS 31-03-2022.PDF | 10 Feb 2023 |
| Proforma of Agreement for saleFile: Draft Sale Agreement MONARCH.pdf | 10 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GetUserDocumentFileContent.pdf | 11 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200257232517_For_Asset_Based_Search_10_01_2023_17_30_21_937.pdf | 11 Jan 2023 |
| CERSAI detailsFile: CERSAI.PDF | 11 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format-A.PDF | 11 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: No-Encumbrance.pdf | 4 Jan 2023 |
| Details of encumbrancesFile: No-Encumbrance.pdf | 4 Jan 2023 |
| Details of encumbrances concerned to LegalFile: No-Encumbrance.pdf | 4 Jan 2023 |
| Certificates of CA (Form 3)File: Monarch form 3 CA cert _compressed.pdf | 4 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure-Sold-Unsold-Inventory-Monarch-Solitaire-LLP (1).pdf | 2 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration-Format-D.pdf | 28 Dec 2022 |
| Declaration in FORM BFile: DECLARATION FORM B MONARCH_compressed.pdf | 28 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Monarch form 1 Ar cert _compressed.pdf | 28 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Monarch form 2 Engg cert .pdf | 28 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A.pdf | 28 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-211.pdf | 28 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CER FOR DEC-compressed.pdf | 17 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE FOR DEC.pdf | 17 Apr 2018 |
| Certificates of CA (Form 3)File: CA CERTIFICATE FOR 311218-compressed.pdf | 17 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE (2).pdf | 27 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE (2).pdf | 27 Mar 2018 |
| OtherFile: INJUNCTION ORDER.pdf | 27 Mar 2018 |
| OtherFile: WRIT PETITION HIGH COURT (2).pdf | 27 Mar 2018 |
| Details of encumbrancesFile: New Doc 2017-08-16 (1).pdf | 16 Aug 2017 |
| Declaration in FORM BFile: New Doc 2017-08-16 (1).pdf | 16 Aug 2017 |
| Certificates of CA (Form 3)File: FINAL UPLOAD.pdf | 16 Aug 2017 |
| Proforma of Allotment letterFile: PROVISIONAL ALLOTMENT LETTER-1.pdf | 16 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.PDF | 15 Aug 2017 |
| Layout approvalFile: LAYOUT PLAN.pdf | 14 Aug 2017 |
| Building plan approvalFile: BUILDING PLAN-UPLOAD.pdf | 14 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 14 Aug 2017 |
| Building Plan Approval (IOD)File: BUILDING PLAN-UPLOAD.pdf | 14 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HOTWANI AC-UPLOAD.pdf | 14 Aug 2017 |
| PAN CardFile: PANCARD MONARCH SOLITARE LLP.PDF | 12 Aug 2017 |
| Copy of the legal title reportFile: TITLE-UPLOAD.pdf | 12 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: NA.PDF | 12 Aug 2017 |
| Proforma of Allotment letterFile: draft agreement.pdf | 12 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 49 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MONARCH SOLITAIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ulhasnagar-4210037,600+ in Thane
Filed coordinates, straight-line distance. 224 registered projects within 2 km.
PUSHPRAJ PRIME
MOONSTONE PROPERTIES
SHARDA ROYCE
SHARDA HOMES
Elite Orchid
M/s Elite Orchid
GLOBAL HEIGHTS
GLOBAL BUILDERS AND DEVELOPERS
ATLANTA CROWN
ATLANTA CONSTRUCTION
BRAMHA PREMSAGAR
BRAMHA LIFESPACES
See every Thane project, with the district possession charts
Builder: MONARCH SOLITAIRE LLP
MONARCH SOLITAIRE LLP has 1 registration on MahaRERA, including MONARCH SOLITAIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if MONARCH SOLITAIRE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MONARCH SOLITAIRE?
The registered promoter entity is MONARCH SOLITAIRE LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MONARCH SOLITAIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MONARCH SOLITAIRE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MONARCH SOLITAIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MONARCH SOLITAIRE?
The professionals named in the filing: Architect: PARMANAND HASHMATRAI HOTWANI; Engineer: RAVINDRA G. PAWAR; Chartered Accountant: TALREJA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MONARCH SOLITAIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback