MOINODDIN HASAN TOWER

By PARVIN GAMIR SHAIKH

RG-MH-39022 · RERA P51600076687 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 65%
21 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

MOINODDIN HASAN TOWER is a Others project by PARVIN GAMIR SHAIKH in Nashik, Maharashtra, registered with MahaRERA as P51600076687 on 20 Jun 2024. Possession is promised by 31 Aug 2027. 16 of the 37 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameMOINODDIN HASAN TOWER
  • TypeOthers
  • Location
    • WADALA ROAD
    • NEAR JMCT COLLAGE
    • Nashik (M Corp.)
    • Nashik
    • 422006
  • Pincode422006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600076687
  • ReraGenie IDRG-MH-39022

Builder

  • NamePARVIN GAMIR SHAIKH
  • Entity typeIndividual
  • Other registrations5 more →
  • Completed4 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredJun 2024PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2024
  • Promised completion31 Aug 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed63 files

Current status

43%16 of 37 units booked
86.4%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MOINODDIN HASAN TOWERNA9733437

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 65%.

MOINODDIN HASAN TOWER: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered1
Open Space7

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Mar 2026
LandownerVillageDistrict
HAJRABE GAMIR SHAIKHNashik (M Corp.)Nashik
PARVIN GAMIR SHAIKHNashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI3925.56
Proposed, not sanctioned3,696 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 8 GROUND FLOOR SUYOJIT ARCADE NASHIK PUNE ROAD NASHIK 422011
Estimated costRs 5.75 cr
Cost incurredRs 4.97 cr
Work done86.44%
BuildingWingEstimatedIncurred
MOINODDIN HASAN TOWERNARs 5.75 crRs 4.97 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAVI AMRUTKAR
EngineerASHISH DNYANESHWAR KALE
EngineerZakir Firoz Shaikh
Chartered AccountantS F YEOLAWALA and CO
Chartered AccountantR S P H & Associates
Chartered AccountantPratik D. Jain & Associates
PartnerRole in project
PARVIN GAMIR SHAIKH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2027

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AR - Hasan tower _smallpdf.pdf11 Jun 2026
Withdrawal Update Form 2File: ER - Hasan tower - March 26.pdf11 Jun 2026
Withdrawal Update Form 3File: CA - hasan tower - March 26.pdf11 Jun 2026
Form 2A (FY 2024-2025)File: Updated Form 2A - March 25.pdf17 Mar 2026
Form 5 (FY 2024-2025)File: RERA AUDIT - 24-25.pdf21 Feb 2026
Form 1File: AR - June 24 .pdf20 Feb 2026
Form 2File: ER - June 24 .pdf20 Feb 2026
Form 3File: CA - June 24.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - June 24 .pdf20 Feb 2026
Form 1File: AR - Sept 24.pdf20 Feb 2026
Form 2File: ER - sept 24 .pdf20 Feb 2026
Form 3File: CA - sept 24.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Sept 24 .pdf20 Feb 2026
Form 1File: AR - Dec 24.pdf20 Feb 2026
Form 2File: ER - Dec 24 .pdf20 Feb 2026
Form 3File: CA - Dec 24.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 24 .pdf20 Feb 2026
Form 1File: AR - March 25.pdf20 Feb 2026
Form 2File: ER - March 25 .pdf20 Feb 2026
Form 3File: CA - March 25.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - March 25 .pdf20 Feb 2026
Form 1File: AR - June 25.pdf20 Feb 2026
Form 2File: ER - June 25 .pdf20 Feb 2026
Form 3File: CA - June 25.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - June 25 .pdf20 Feb 2026
Form 1File: AR - Dec 25.pdf20 Feb 2026
Form 2File: ER - Dec 25 .pdf20 Feb 2026
Form 3File: CA - Dec 25.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 25 .pdf20 Feb 2026
Form 1File: AR - Sept 25.pdf20 Feb 2026
Form 2File: ER - Sept 25.pdf20 Feb 2026
Form 3File: CA - Sept 25.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Sept 25 .pdf20 Feb 2026
PAN CardFile: Hajrabe Shaikh PAN Card.pdf13 Jun 2024
Details of encumbrances concerned to FinanceFile: Moinoddin Hasan Tower SPOA 12062024.pdf13 Jun 2024
Details of encumbrances concerned to LegalFile: Moinoddin Hasan Tower SPOA 12062024.pdf13 Jun 2024
Other - FinanceFile: Moinoddin Hasan Tower Self Declairation Corrected 1.pdf27 May 2024
Other - FinanceFile: Moinoddin Hasan Tower Self Declairation 02052024.pdf2 May 2024
Copy of the legal title reportFile: Moinoddin Hasan Tower Title 29042024.pdf29 Apr 2024
Other - TechnicalFile: Moinoddin Hasan Tower Undertaking 26042024.pdf29 Apr 2024
Layout approvalFile: Moinoddin Hasan Tower Layout Final 29112023.pdf30 Nov 2023
Copy of Layout Approval (in case of layout)File: Moinoddin Hasan Tower Layout Final 29112023.pdf30 Nov 2023
Declaration about Commencement CertificateFile: Moinoddin Hasan Tower Format D 30112023 Final.pdf30 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Moinoddin Hasan Tower Other Parvin Shaikh 28102023.pdf30 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Moinoddin Hasan Tower Other Hajrabe Shaikh 28102023.pdf30 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Moinoddin Hasan Tower Bank 26042024.pdf30 Nov 2023
Building plan approvalFile: Moinoddin Hasan Tower IOD 1_2.pdf28 Nov 2023
Building plan approvalFile: Moinoddin Hasan Tower IOD 2_2.pdf28 Nov 2023
PAN CardFile: Parvin Shaikh PAN Card.pdf28 Nov 2023
Details of encumbrances concerned to FinanceFile: Moinoddin Hasan Tower Encumbrance Finance 26042024.pdf28 Nov 2023
Details of encumbrances concerned to FinanceFile: Moinoddin Hasan Tower No Encumbrance Legal 28102023.pdf28 Nov 2023
Details of encumbrances concerned to LegalFile: Moinoddin Hasan Tower Encumbrance Finance 26042024.pdf28 Nov 2023
Details of encumbrances concerned to LegalFile: Moinoddin Hasan Tower No Encumbrance Legal 28102023.pdf28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Moinoddin Hasan Tower IOD 1_2.pdf28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Moinoddin Hasan Tower IOD 2_2.pdf28 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Moinoddin Hasan Tower Commencement Certificate 28102023.pdf28 Nov 2023
Declaration in FORM BFile: Moinoddin Hasan Tower Form B Final 24112023.pdf28 Nov 2023
CERSAI detailsFile: Moinoddin Hasan Tower CERSAI_Search_Report_200284747364_For_Asset_Based_Search_26_10_2023_28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Moinoddin Hasan Tower Form 3 26042024.pdf28 Nov 2023
Proforma of Agreement for saleFile: Moinooddin Hasan Tower Agreement Draft 10102023.pdf28 Nov 2023
Proforma of Allotment letterFile: Moinoddin Hasan Tower Allotment Letter 28102023.pdf28 Nov 2023
Deviation Report with respect to Allotment letterFile: Moinoddin Hasan Tower Deviation For Allottment Letter 28102023.pdf28 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Moinoddin Hasan Tower Deviation For Agreement For Sell 28102023.pdf28 Nov 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 not delivered by the promised date
ProjectLocationRegisteredStatusPromisedDelivered
REHMAT APARTMENTP51600031833MAUJE NASHIK - 4 SHIWAR, NashikNov 2021OngoingSep 2024Not delivered
NEW SAHARA APARTMENTP51600021896KHODE NAGAR, NashikAug 2019CompletedJul 2023Oct 2020
KINARA APARTMENTP51600020771KHODE NAGAR, NashikMay 2019CompletedMay 2022Feb 2020
KAABIL APARTMENTP51600014779MAUJE WADALA SHIVAR, NashikJan 2018CompletedDec 2018Nov 2018

How this compares with Nashik

43%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MOINODDIN HASAN TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR JMCT COLLAGE4,100+ in Nashik

2 kmMOINODDIN HASAN TOWERCompleted 180Lapsed / revoked 47Other 112Dot size: filed unitsN

Filed coordinates, straight-line distance. 339 registered projects within 2 km.

Builder: PARVIN GAMIR SHAIKH

PARVIN GAMIR SHAIKH has 6 registrations on MahaRERA, including KAABIL APARTMENT and KINARA APARTMENT. Its filings disclose 9 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if MOINODDIN HASAN TOWER is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MOINODDIN HASAN TOWER?

The registered promoter entity is PARVIN GAMIR SHAIKH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MOINODDIN HASAN TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MOINODDIN HASAN TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MOINODDIN HASAN TOWER?

The professionals named in the filing: Architect: RAVI AMRUTKAR; Engineer: ASHISH DNYANESHWAR KALE; Engineer: Zakir Firoz Shaikh; Chartered Accountant: S F YEOLAWALA and CO; Chartered Accountant: R S P H & Associates; Chartered Accountant: Pratik D. Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MOINODDIN HASAN TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MOINODDIN HASAN TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MOINODDIN HASAN TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.