MOINODDIN HASAN TOWER
RG-MH-39022 · RERA P51600076687 · Last updated on MahaRERA portal: 11 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MOINODDIN HASAN TOWER is a Others project by PARVIN GAMIR SHAIKH in Nashik, Maharashtra, registered with MahaRERA as P51600076687 on 20 Jun 2024. Possession is promised by 31 Aug 2027. 16 of the 37 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameMOINODDIN HASAN TOWER
- TypeOthers
- Location
- WADALA ROAD
- NEAR JMCT COLLAGE
- Nashik (M Corp.)
- Nashik
- 422006
- Pincode422006
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600076687
- ReraGenie IDRG-MH-39022
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Jun 2024
- Promised completion31 Aug 2027
- Revised completionNone
- Buildings1 building record
- Documents filed63 files
Current status
Figures as on 11 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MOINODDIN HASAN TOWER | NA | 9 | 7 | 33 | 4 | 37 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 65%.
MOINODDIN HASAN TOWER: 67% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| HAJRABE GAMIR SHAIKH | Nashik (M Corp.) | Nashik |
| PARVIN GAMIR SHAIKH | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MOINODDIN HASAN TOWER | NA | Rs 5.75 cr | Rs 4.97 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAVI AMRUTKAR |
| Engineer | ASHISH DNYANESHWAR KALE |
| Engineer | Zakir Firoz Shaikh |
| Chartered Accountant | S F YEOLAWALA and CO |
| Chartered Accountant | R S P H & Associates |
| Chartered Accountant | Pratik D. Jain & Associates |
| Partner | Role in project |
|---|---|
| PARVIN GAMIR SHAIKH | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Aug 2027
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AR - Hasan tower _smallpdf.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: ER - Hasan tower - March 26.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: CA - hasan tower - March 26.pdf | 11 Jun 2026 |
| Form 2A (FY 2024-2025)File: Updated Form 2A - March 25.pdf | 17 Mar 2026 |
| Form 5 (FY 2024-2025)File: RERA AUDIT - 24-25.pdf | 21 Feb 2026 |
| Form 1File: AR - June 24 .pdf | 20 Feb 2026 |
| Form 2File: ER - June 24 .pdf | 20 Feb 2026 |
| Form 3File: CA - June 24.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - June 24 .pdf | 20 Feb 2026 |
| Form 1File: AR - Sept 24.pdf | 20 Feb 2026 |
| Form 2File: ER - sept 24 .pdf | 20 Feb 2026 |
| Form 3File: CA - sept 24.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sept 24 .pdf | 20 Feb 2026 |
| Form 1File: AR - Dec 24.pdf | 20 Feb 2026 |
| Form 2File: ER - Dec 24 .pdf | 20 Feb 2026 |
| Form 3File: CA - Dec 24.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 24 .pdf | 20 Feb 2026 |
| Form 1File: AR - March 25.pdf | 20 Feb 2026 |
| Form 2File: ER - March 25 .pdf | 20 Feb 2026 |
| Form 3File: CA - March 25.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 25 .pdf | 20 Feb 2026 |
| Form 1File: AR - June 25.pdf | 20 Feb 2026 |
| Form 2File: ER - June 25 .pdf | 20 Feb 2026 |
| Form 3File: CA - June 25.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - June 25 .pdf | 20 Feb 2026 |
| Form 1File: AR - Dec 25.pdf | 20 Feb 2026 |
| Form 2File: ER - Dec 25 .pdf | 20 Feb 2026 |
| Form 3File: CA - Dec 25.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 25 .pdf | 20 Feb 2026 |
| Form 1File: AR - Sept 25.pdf | 20 Feb 2026 |
| Form 2File: ER - Sept 25.pdf | 20 Feb 2026 |
| Form 3File: CA - Sept 25.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sept 25 .pdf | 20 Feb 2026 |
| PAN CardFile: Hajrabe Shaikh PAN Card.pdf | 13 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: Moinoddin Hasan Tower SPOA 12062024.pdf | 13 Jun 2024 |
| Details of encumbrances concerned to LegalFile: Moinoddin Hasan Tower SPOA 12062024.pdf | 13 Jun 2024 |
| Other - FinanceFile: Moinoddin Hasan Tower Self Declairation Corrected 1.pdf | 27 May 2024 |
| Other - FinanceFile: Moinoddin Hasan Tower Self Declairation 02052024.pdf | 2 May 2024 |
| Copy of the legal title reportFile: Moinoddin Hasan Tower Title 29042024.pdf | 29 Apr 2024 |
| Other - TechnicalFile: Moinoddin Hasan Tower Undertaking 26042024.pdf | 29 Apr 2024 |
| Layout approvalFile: Moinoddin Hasan Tower Layout Final 29112023.pdf | 30 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Moinoddin Hasan Tower Layout Final 29112023.pdf | 30 Nov 2023 |
| Declaration about Commencement CertificateFile: Moinoddin Hasan Tower Format D 30112023 Final.pdf | 30 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Moinoddin Hasan Tower Other Parvin Shaikh 28102023.pdf | 30 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Moinoddin Hasan Tower Other Hajrabe Shaikh 28102023.pdf | 30 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Moinoddin Hasan Tower Bank 26042024.pdf | 30 Nov 2023 |
| Building plan approvalFile: Moinoddin Hasan Tower IOD 1_2.pdf | 28 Nov 2023 |
| Building plan approvalFile: Moinoddin Hasan Tower IOD 2_2.pdf | 28 Nov 2023 |
| PAN CardFile: Parvin Shaikh PAN Card.pdf | 28 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Moinoddin Hasan Tower Encumbrance Finance 26042024.pdf | 28 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Moinoddin Hasan Tower No Encumbrance Legal 28102023.pdf | 28 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Moinoddin Hasan Tower Encumbrance Finance 26042024.pdf | 28 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Moinoddin Hasan Tower No Encumbrance Legal 28102023.pdf | 28 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Moinoddin Hasan Tower IOD 1_2.pdf | 28 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Moinoddin Hasan Tower IOD 2_2.pdf | 28 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Moinoddin Hasan Tower Commencement Certificate 28102023.pdf | 28 Nov 2023 |
| Declaration in FORM BFile: Moinoddin Hasan Tower Form B Final 24112023.pdf | 28 Nov 2023 |
| CERSAI detailsFile: Moinoddin Hasan Tower CERSAI_Search_Report_200284747364_For_Asset_Based_Search_26_10_2023_ | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Moinoddin Hasan Tower Form 3 26042024.pdf | 28 Nov 2023 |
| Proforma of Agreement for saleFile: Moinooddin Hasan Tower Agreement Draft 10102023.pdf | 28 Nov 2023 |
| Proforma of Allotment letterFile: Moinoddin Hasan Tower Allotment Letter 28102023.pdf | 28 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: Moinoddin Hasan Tower Deviation For Allottment Letter 28102023.pdf | 28 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: Moinoddin Hasan Tower Deviation For Agreement For Sell 28102023.pdf | 28 Nov 2023 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| REHMAT APARTMENTP51600031833 | MAUJE NASHIK - 4 SHIWAR, Nashik | Nov 2021 | Ongoing | Sep 2024 | Not delivered |
| NEW SAHARA APARTMENTP51600021896 | KHODE NAGAR, Nashik | Aug 2019 | Completed | Jul 2023 | Oct 2020 |
| KINARA APARTMENTP51600020771 | KHODE NAGAR, Nashik | May 2019 | Completed | May 2022 | Feb 2020 |
| KAABIL APARTMENTP51600014779 | MAUJE WADALA SHIVAR, Nashik | Jan 2018 | Completed | Dec 2018 | Nov 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MOINODDIN HASAN TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR JMCT COLLAGE4,100+ in Nashik
Filed coordinates, straight-line distance. 339 registered projects within 2 km.
SIGNIFICANT
IND DEVELOPERS
Shree Parshwanath
Darshan Anil Lodha
Anandsagar Annex Phase 1 ( L and M Wing )
Ravi Mahajan Builders & Developers Pvt. Lt
SHREEJI INSPERIA
Shreeji Landmarks LLP
Pawa Blossom
Pawa Construction
Bait E Muhammad Phase 1
Onyx Constructions
See every Nashik project, with the district possession charts
Builder: PARVIN GAMIR SHAIKH
PARVIN GAMIR SHAIKH has 6 registrations on MahaRERA, including KAABIL APARTMENT and KINARA APARTMENT. Its filings disclose 9 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if MOINODDIN HASAN TOWER is delayed beyond 31 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MOINODDIN HASAN TOWER?
The registered promoter entity is PARVIN GAMIR SHAIKH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MOINODDIN HASAN TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MOINODDIN HASAN TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MOINODDIN HASAN TOWER?
The professionals named in the filing: Architect: RAVI AMRUTKAR; Engineer: ASHISH DNYANESHWAR KALE; Engineer: Zakir Firoz Shaikh; Chartered Accountant: S F YEOLAWALA and CO; Chartered Accountant: R S P H & Associates; Chartered Accountant: Pratik D. Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MOINODDIN HASAN TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback