Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 6 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 92%
15 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

ML Tower is a Commercial project by BML Builders in Pune, Maharashtra, registered with MahaRERA as P52100053327 on 27 Oct 2023. Possession is promised by 13 Jan 2027. The completion date has moved by 6 months from the original filing. 38 of the 53 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameML Tower
  • TypeCommercial
  • Location
    • S. B. Patil Road
    • Pune
    • Ravet
    • Haveli
    • 421101
  • Pincode421101
  • RERA no.P52100053327
  • ReraGenie IDRG-MH-98459

Builder

  • NameBML Builders
  • Entity typePartnership
  • GSTIN27AAYFB0038K1Z4
  • PartnersKiran Mohan Landge, Siddarth Umesh Mane

Key dates

this monthRegisteredOct 2023First promiseJul 2026Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion13 Jan 2027
  • Revised completionRevised to 13 Jan 2027 (originally 13 Jul 2026)
  • Buildings1 building record
  • Documents filed108 files

Current status

72%38 of 53 units booked
90.0%Work done, per cost certificate

Figures as on 12 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ML TowerNA88203353

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 92%.

ML Tower: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises78%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 12 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Closed/Covered40
Open Space39

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2024
LandownerVillageDistrict
Mrs. Shakuntala Arjun Liman-Pune
Mr. Mahendra Arjun Liman-Pune
Mrs. Manini Ravindra Liman-Pune
Ms. Karuna Ravindra Liman-Pune
Ms. Prachi Ravindra Liman-Pune
Mr. Sanjay Arjun Liman-Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI1855.08
Proposed, not sanctioned1,855 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1102/10/11, Marne Heights, Budhwar Peth, Pune- 411 002
Estimated costRs 25.00 cr
Cost incurredRs 22.50 cr
Work done90.0%
BuildingWingEstimatedIncurred
ML TowerNARs 24.00 crRs 22.50 cr
-NARs 1.00 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIntegrity Arch and Associates
ArchitectShamal Kavatkar
EngineerGOVIND BHANUDAS NIMBALKAR
EngineerPawan Khengare
Chartered AccountantCA Bhushan S Chhajed
Chartered AccountantEshan Porwal
Chartered AccountantSiddhi Warik
Chartered AccountantHMA & Addociates
PartnerRole in project
BML Builders-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12072621731Jul 2026 → Jan 2027

Reason as filed by the promotera

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 13 Jan 2027

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf12 Jul 2026
Withdrawal Update Form 2File: form 2.pdf12 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf12 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf12 Jul 2026
Form 1File: June form 1.pdf10 Jul 2026
Form 2File: June form 2.pdf10 Jul 2026
Form 3File: June form 3.pdf10 Jul 2026
Disclosure of Sold and Booked InventoryFile: June sold booked inventory Data.pdf10 Jul 2026
Form 1File: June form 1.pdf10 Jul 2026
Form 2File: June form 2.pdf10 Jul 2026
Form 3File: June form 3.pdf10 Jul 2026
Disclosure of Sold and Booked InventoryFile: June form 3.pdf10 Jul 2026
Form 1File: Sept form 1.pdf10 Jul 2026
Form 2File: Sept form 2.pdf10 Jul 2026
Form 3File: Sept form 3.pdf10 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sept Sold Booked Inventory data.pdf10 Jul 2026
Form 1File: Dec form 1.pdf10 Jul 2026
Form 2File: Dec form 2.pdf10 Jul 2026
Form 3File: Dec form 3.pdf10 Jul 2026
Disclosure of Sold and Booked InventoryFile: Dec sold booked inventory Data.pdf10 Jul 2026
Form 1File: march form 1.pdf10 Jul 2026
Form 2File: March form 2.pdf10 Jul 2026
Form 3File: march form 3.pdf10 Jul 2026
Disclosure of Sold and Booked InventoryFile: March sold booked Inventory Data.pdf10 Jul 2026
Layout approvalFile: 1st Revised Sanction Plan_11zon.pdf31 Mar 2025
Copy of Layout Approval (in case of layout)File: 1st Revised Sanction Plan_11zon.pdf31 Mar 2025
Proforma of Agreement for saleFile: Final Draft - Narayani 31-03-2025 Submitted to RERA_compressed.pdf31 Mar 2025
Proforma of Agreement for saleFile: Final Draft for RERA BML BUILDERS 17-03-2025.pdf17 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4th Architect Certificate 10-02-2025-output.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4th CA Certificate 07-02-25_11zon.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf13 Feb 2025
Other - TechnicalFile: 4th Work Progress Certificate 10-02-2025.pdf13 Feb 2025
Layout approvalFile: HPSC0724_11zon.pdf21 Jan 2025
Layout approvalFile: HPSC0725_11zon.pdf21 Jan 2025
Layout approvalFile: HPSC0726_11zon.pdf21 Jan 2025
Layout approvalFile: HPSC0727_11zon.pdf21 Jan 2025
Layout approvalFile: HPSC0728_11zon.pdf21 Jan 2025
Layout approvalFile: HPSC0729_11zon.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: HPSC0725_11zon.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: HPSC0726_11zon.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: HPSC0727_11zon.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: HPSC0728_11zon.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: HPSC0729_11zon.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: HPSC0724_11zon.pdf21 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 20250120095555_11zon.pdf21 Jan 2025
Proforma of Agreement for saleFile: RERA AGREEMENT kiran.pdf30 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A ordern n0 34 2022.pdf21 Dec 2024
Proforma of Agreement for saleFile: rera bml.pdf16 Dec 2024
Layout approvalFile: 9-9-24 बांधकाम परवानगी 4th (1)-pages-compressed.pdf18 Nov 2024
Layout approvalFile: 9-9-24 बांधकाम परवानगी 4th (1)-pages-compressed.pdf18 Nov 2024
Copy of Layout Approval (in case of layout)File: 9-9-24 बांधकाम परवानगी 4th (1)-pages-compressed.pdf18 Nov 2024
Copy of Layout Approval (in case of layout)File: 9-9-24 बांधकाम परवानगी 4th (1)-pages-compressed.pdf18 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: new Separate Bank Account details including no encumbrances on the Bank Account or no escr21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 29-4-24 Architect Certificate_compressed.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12-9-24 Architect Certificate .pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (3).pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 16-5-24 CA Certificate-compressed.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15-5-24 Engineer Certificate.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12-9-24 Engineer Certificate .pdf11 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 9-9-24 बांधकाम परवानगी 4th-compressed.pdf11 Oct 2024
Other - TechnicalFile: 15-4-23 Plinth checking Certificate.pdf11 Oct 2024
Other - TechnicalFile: work in progress Certificate .pdf11 Oct 2024
Building plan approvalFile: Building Plan_Revised Sheet-1.pdf24 Mar 2024
Building plan approvalFile: Building Plan_Revised Sheet-2.pdf24 Mar 2024
Building plan approvalFile: Building Plan_Revised Sheet-3.pdf24 Mar 2024
Building plan approvalFile: Building Plan_Revised Sheet-4.pdf24 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Revised Sheet-1.pdf24 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Revised Sheet-2.pdf24 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Revised Sheet-3.pdf24 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Revised Sheet-4.pdf24 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised_CC.pdf24 Mar 2024
Proforma of Agreement for saleFile: RERA AGREEMENT kiran sir 03102023.pdf15 Dec 2023
Copy of the legal title reportFile: Title Report_1 (3 files merged).pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA-BML Buildernew (1).pdf20 Oct 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance - ML Tower.pdf9 Oct 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal - ML Tower.pdf9 Oct 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance - ML Tower.pdf9 Oct 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal - ML Tower.pdf9 Oct 2023
Proforma of Agreement for saleFile: Agreement for sale- BML Builders (Shailesh sir).pdf9 Oct 2023
Other - TechnicalFile: CC confirmation.pdf9 Oct 2023

How this compares with Pune

72%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ML Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: BML Builders

BML Builders has 1 registration on MahaRERA, including ML Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ML Tower is delayed beyond 13 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ML Tower?

The registered promoter entity is BML Builders, a partnership as per the filing. Its GSTIN 27AAYFB0038K1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ML Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ML Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ML Tower?

The professionals named in the filing: Architect: Integrity Arch and Associates; Architect: Shamal Kavatkar; Engineer: GOVIND BHANUDAS NIMBALKAR; Engineer: Pawan Khengare; Chartered Accountant: CA Bhushan S Chhajed; Chartered Accountant: Eshan Porwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ML Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ML Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ML Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.