MISTY HILLS CONDOS

By RAJENDRA DARSHAN LAAD

RG-MH-18156 · RERA P52000076630 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 24 months from the original
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
84 of 88Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

MISTY HILLS CONDOS is a Residential / Group Housing project by RAJENDRA DARSHAN LAAD in Raigarh, Maharashtra, registered with MahaRERA as P52000076630 on 18 Jun 2024. Possession is promised by 31 Dec 2028. The completion date has moved by 24 months from the original filing. 4 of the 88 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameMISTY HILLS CONDOS
  • TypeResidential / Group Housing
  • Location
    • JAMBRUNG
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000076630
  • ReraGenie IDRG-MH-18156

Builder

  • NameRAJENDRA DARSHAN LAAD
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2024First promiseDec 2026Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jun 2024
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2026)
  • Buildings2 building records
  • Documents filed80 files

Current status

5%4 of 88 units booked
4.1%Work done, per cost certificate

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA5548048
BUILDING BNA6640040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

BUILDING A18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered88
BuildingClosed/CoveredTotal
BUILDING A4444
BUILDING B4444

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,489 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025
LandownerVillageDistrict
MADHURI RAJENDRA LAADMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityCOLLECTOR OF RAIGAD, ALIBAG
Permissible FSI2620.5
Proposed, not sanctioned2,620 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANTACRUZ EAST, MUMBAI BRANCH, MUMBAI SUB URBAN, 400029
Estimated costRs 6.61 cr
Cost incurredRs 26.85 lakh
Work done4.06%
BuildingWingEstimatedIncurred
BUILDING ANARs 3.36 crRs 26.85 lakh
BUILDING BNARs 2.59 cr-
-NARs 66.08 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA GROUP
EngineerTHE DESIGN INDIA GROUP
Chartered AccountantH V KATARIA & ASSOCIATES
PartnerRole in project
RAJENDRA DARSHAN LAAD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15122518671Dec 2026 → Dec 2028

Reason as filed by the promoterRespected Sir, We, Rajendra Laad and Madhuri laad, are the promoters of the real estate project known as "Misty hills Condos" bearing MahaRERA Registration No. P52000076630 We would like to respectfully bring to your attention that the project has encountered certain unforeseen technical challenges that have adversely impacted the originally proposed timelines for completion. We wish to place on record the following reasons for the delay: Delay in Sales launch of the project: Due to uncertainity in the market and delay in forming a sales team for the project, the launch of sales got delayed an

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5.pdf25 Jun 2026
Withdrawal Update Form 1File: Misty Hills condos form 1.pdf23 Jun 2026
Withdrawal Update Form 1File: Misty Hills condos form 1 Jan to march 2026.pdf23 Jun 2026
Withdrawal Update Form 2File: Misty Hills condos form 2.pdf23 Jun 2026
Withdrawal Update Form 2File: Misty Hills condos form 2 jan -26 to march - 26.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3 -signed.pdf23 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf23 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A_Ed (1).pdf23 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A_Ed_11zon.pdf23 Jun 2026
Withdrawal Update Form 1File: Misty Hills Condos form 1.pdf22 Nov 2025
Withdrawal Update Form 2File: Misty Hills Condos form 2.pdf22 Nov 2025
Withdrawal Update Form 3File: Form 3 Rajendra Lad Misty Hills Condons.pdf22 Nov 2025
Withdrawal Update Form 1File: Form_1.pdf11 Oct 2025
Withdrawal Update Form 2File: Form_2 .pdf11 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE - FORM 3.pdf11 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf11 Oct 2025
Form 1File: form 1 march 25.pdf26 Jun 2025
Form 2File: form 2 march 25.pdf26 Jun 2025
Form 3File: form 3 march 25.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory march 25.pdf26 Jun 2025
Disclosure of sold/ booked inventoryFile: Inventory (2).pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Inventory (2).pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (6).pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (4).pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_compressed.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rajendra Lad Auditors Bhvan Misty Hills.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: Unsold INVENTORY RAJENDRALAAD.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Rajendralaad mistyhills (1).pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Rajendralaad mistyhills (1).pdf2 Dec 2024
Other - LegalFile: DECLARATION CUM UNDERTAKING.pdf29 May 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Concern to Finance.pdf18 May 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Concern to LEGAL.pdf18 May 2024
Details of encumbrances concerned to LegalFile: No Encumbrances Concern to Finance.pdf18 May 2024
Details of encumbrances concerned to LegalFile: No Encumbrances Concern to LEGAL.pdf18 May 2024
Declaration about Commencement CertificateFile: DECLARATION_ABOUT_COMMENCEMNT_CERTIFICATE.pdf18 May 2024
Declaration in FORM BFile: FORM B final.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - FORM 3.pdf18 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK_ACCOUNT_DETAILS_NEW_FORMAT_-_FINAL.pdf18 May 2024
Other - LegalFile: MOU.pdf18 May 2024
Other - LegalFile: no objection certificate.pdf18 May 2024
Other - LegalFile: S NO CLEAR RERA LETTER.pdf18 May 2024
Other - FinanceFile: DECLARATION CUM UNDERTAKING.pdf18 May 2024
Other - FinanceFile: BUILT UP AREA CALCULATION.pdf18 May 2024
Other - FinanceFile: S NO CLEAR RERA LETTER.pdf18 May 2024
Details of encumbrances concerned to FinanceFile: ENCRUMBRANCES_CERTIFICATE_-_FOR_FINANCE.pdf10 May 2024
Details of encumbrances concerned to LegalFile: ENCRUMBRANCES_CERTIFICATE_-_FOR_FINANCE.pdf10 May 2024
CERSAI detailsFile: CERSAI_REPORT_-_RAJENDRA_LAAD_PLOT_3_4_7.pdf10 May 2024
Other - LegalFile: latest 712.pdf10 May 2024
Other - LegalFile: S NO CLEAR RERA LETTER.pdf10 May 2024
Other - LegalFile: sale deed.pdf9 May 2024
Other - LegalFile: POWER OF ATTORNY.pdf9 May 2024
Other - LegalFile: CC CONFIRMATION.pdf9 May 2024
Layout approvalFile: SANCTIONED PLAN - 1 FINAL 1_compressed (1).pdf8 May 2024
Building plan approvalFile: SANCTIONED PLAN- 2 FINAL 2_compressed (1).pdf8 May 2024
Building plan approvalFile: BUILT UP AREA MENTIONED.pdf8 May 2024
Details of encumbrances concerned to FinanceFile: ENCRUMBRANCES_CERTIFICATE_-_FOR_LEGAL.pdf8 May 2024
Details of encumbrances concerned to LegalFile: ENCRUMBRANCES_CERTIFICATE_-_FOR_LEGAL.pdf8 May 2024
Copy of Layout Approval (in case of layout)File: SANCTIONED PLAN - 1 FINAL 1_compressed (1).pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN- 2 FINAL 2_compressed (1).pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILT UP AREA MENTIONED.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Order_No_39_RAJENDRA_LAAD.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Order_No_39_MADHURI_LAAD.pdf8 May 2024
Other - FinanceFile: CC CONFIRMATION.pdf8 May 2024
Other - FinanceFile: DECLARATION_FOR_NON_FORMATION_OF_SEPARATE_ENTITY.pdf8 May 2024
Other - FinanceFile: DECLARATION_FOR_JOINT_OPERATION_OF_RERA_BANK_A.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_compressed.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_compressed.pdf27 Apr 2024
Proforma of Agreement for saleFile: AGREEMENT OF SALE_compressed.pdf27 Apr 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER_compressed.pdf27 Apr 2024
Deviation Report with respect to Allotment letterFile: NO_DEVIATION_IN_THE_ALLOTMENT_LETTER.pdf27 Apr 2024
Deviation Report with respect to model copy of AgreementFile: NO_DEVIATION_IN_THE_AGREEMENT_PLAN.pdf27 Apr 2024
Other - TechnicalFile: DECLARATION_CUM_UNDERTACKING.pdf27 Apr 2024
PAN CardFile: pan_card_copy Rajendra Laad.pdf13 Apr 2024
PAN CardFile: Madhuri laad pan copy.pdf13 Apr 2024
Copy of the legal title reportFile: Search And Title Report 1_final.pdf13 Apr 2024
Copy of the legal title reportFile: Legal Title Report final.pdf13 Apr 2024
Copy of the legal title reportFile: Flow of the title of the said Land final.pdf13 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Rajendra laad jamrung s no 259 oc final.pdf13 Apr 2024

How this compares with Raigarh

5%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 24 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MISTY HILLS CONDOS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAMBRUNG5,900+ in Raigarh

2 kmMISTY HILLS CONDOSLapsed / revoked 4Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: RAJENDRA DARSHAN LAAD

RAJENDRA DARSHAN LAAD has 2 registrations on MahaRERA, including MISTY HILLS APARTMENT PHASE 1 and MISTY HILLS CONDOS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if MISTY HILLS CONDOS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MISTY HILLS CONDOS?

The registered promoter entity is RAJENDRA DARSHAN LAAD, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MISTY HILLS CONDOS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MISTY HILLS CONDOS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MISTY HILLS CONDOS?

The professionals named in the filing: Architect: THE DESIGN INDIA GROUP; Engineer: THE DESIGN INDIA GROUP; Chartered Accountant: H V KATARIA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MISTY HILLS CONDOS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MISTY HILLS CONDOS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MISTY HILLS CONDOS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.