Home / Browse projects / Bengaluru Urban, Karnataka / MILLIONAIRE TOWER
MILLIONAIRE TOWER
By ARTISMO
RG-KA-62092 · RERA PRM/KA/RERA/1251/472/PR/200224/006640 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MILLIONAIRE TOWER is a Mixed Development project by ARTISMO in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/200224/006640 on 20 Feb 2024. Possession is promised by 30 Sep 2029. 67 of the 283 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete.
At a glance
Project
- NameMILLIONAIRE TOWER
- TypeMixed Development
- Location
- Yelahanka
- Bengaluru Urban
- 562157
- Pincode562157
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/472/PR/200224/006640
- ReraGenie IDRG-KA-62092
Builder
- NameARTISMO
- Entity typePartnership Firm
- GSTIN29AAMFP0635N1ZP
- Authorized SignatoryMURALIDHAR M GURAPPA
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on20 Feb 2024
- Promised completion30 Sep 2029
- Revised completionNone
- Buildings3 building records
- Documents filed210 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MILLIONAIRE TOWER EAST | - | - | - | 80 | 0 | 80 |
| MILLIONAIRE TOWER WEST | - | - | - | 100 | 0 | 100 |
| MILLIONAIRE TOWER BUSINESS | - | - | - | - | - | 103 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 72%.
Building: 17% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 72% |
| Upto Plinth Level | 62% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 49% |
| Masonry Construction | 21% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities48
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| LIBRARY | Yes | 0% |
| DOCTOR’S ROOM | Yes | 0% |
| PANTRY / STORE | Yes | 0% |
| HEALTH CLUB | Yes | 0% |
| TOILETS / CHANGE | Yes | 0% |
| CRECHE | Yes | 0% |
| LOUNGE | Yes | 0% |
| CIRCULATION | Yes | 0% |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership7
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VIJAYALAKSHMI SRIDHARA | - | - |
| Suresh CR | - | - |
| C Rathnamma | - | - |
| P Gopalkrishna | - | - |
| Latha K | - | - |
| Artismo | - | - |
| Ramachandra M | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 123.74 cr | Rs 37.20 lakh |
| Architects, Engineer, Consultants Fees etc | Rs 2.00 cr | - |
| Administrative Costs | Rs 25.00 lakh | - |
| On-site expenditure-Salaries of workers | - | Rs 27.10 lakh |
| On-site expenditure-Consultants Fees | - | Rs 22.75 lakh |
| On-site expenditure-Site Overhead | - | Rs 53.54 lakh |
| Payment of fees | - | Rs 71.59 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANJULA SOMASHEKAR |
| Engineer | K PRAKASH |
| Chartered Accountant | NIDISH AGARWAL |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed210
As listed on the registration, under the names the promoter filed them with; the newest 80 of 210 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/200224/006640 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM - 4_Certificate_(Q2) SEP 2026.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: F5_Architect_Q2_Sep 2026.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: F6_Engineer_Q2_Sep 2026.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM - 4_Certificate_(Q1) JUNE 2026.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: F5_Architect_Q1_June 2026.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: F6_Engineer_Q1_June 2026.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM - 4_Certificate_(Q4) March 2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect_(Q4)_Jan to Mar 2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer_(Q3)_Jan to March 2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM - 4_Certificate_(Q3) December 2025.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect_(Q3)_Oct to Dec 2025.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer_(Q3)_Oct to Dec 2025.pdf | 12 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| Artismo - Borewell PicsFile: Artismo - Borewell Pics.pdf | 29 Jan 2024 |
| ARTISMO - BWSSB NOCFile: ARTISMO - BWSSB NOC.pdf | 29 Jan 2024 |
| BIAAPA CDP Master plan - Chikkajala copy - Demarcated for CLU 77-7File: BIAAPA CDP Master plan - Chikkajala copy - Demarcated for CLU 77-7.pdf | 29 Jan 2024 |
| BIAAPA CDP Master plan - Chikkajala for CLU 77-7File: BIAAPA CDP Master plan - Chikkajala for CLU 77-7.pdf | 29 Jan 2024 |
| Change of land use for 77 - 6,9,15,16,17File: Change of land use for 77 - 6,9,15,16,17.pdf | 29 Jan 2024 |
| Change of land use Sy no77_3A,3B,4,5 and 78_8,10A1,10BFile: Change of land use Sy no77_3A,3B,4,5 and 78_8,10A1,10B.pdf | 29 Jan 2024 |
| CARPET AREA DETAILS AS PER RERA - UNITWISE (R20-19 01 24)File: CARPET AREA DETAILS AS PER RERA - UNITWISE (R20-19 01 24).xlsx | 29 Jan 2024 |
| EC - 77_7(2A8G) 2007-2015File: EC - 77_7(2A8G) 2007-2015.pdf | 29 Jan 2024 |
| EC - 77_15 2015-2023File: EC - 77_15 2015-2023.pdf | 29 Jan 2024 |
| Millionaire Tower - Business Carpet AreaFile: Millionaire Tower - Business Carpet Area.pdf | 29 Jan 2024 |
| Millionaire Tower - East Carpet AreaFile: Millionaire Tower - East Carpet Area.pdf | 29 Jan 2024 |
| Millionaire Tower - West Carpet AreaFile: Millionaire Tower - West Carpet Area.pdf | 29 Jan 2024 |
| MR Copies Clear CopyFile: MR Copies Clear Copy.pdf | 29 Jan 2024 |
| PLAN APPROVAL LETTERFile: PLAN APPROVAL LETTER.pdf | 29 Jan 2024 |
| Proforma RERA -AFS -V3_Artisomo - FINALFile: Proforma RERA -AFS -V3_Artisomo - FINAL.pdf | 29 Jan 2024 |
| REGARDING FAR PHASE - I DEVELOPMENTFile: REGARDING FAR PHASE - I DEVELOPMENT.pdf | 29 Jan 2024 |
| REGARDING NO OF UNITS IN PHASE - IFile: REGARDING NO OF UNITS IN PHASE - I.pdf | 29 Jan 2024 |
| REGARDING PHASE I DEVELOPMENTFile: REGARDING PHASE I DEVELOPMENT.pdf | 29 Jan 2024 |
| Relinquishment DeedFile: Relinquishment Deed.pdf | 29 Jan 2024 |
| SCFSCS Loan Clearance - 77_6File: SCFSCS Loan Clearance - 77_6.pdf | 29 Jan 2024 |
| SCFSCS NOC - 77_7File: SCFSCS NOC - 77_7.pdf | 29 Jan 2024 |
| SITE AREA - Phase 1 & 2File: SITE AREA - Phase 1 & 2.pdf | 29 Jan 2024 |
| Site Plan - Demarking for Phase 1File: Site Plan - Demarking for Phase 1.pdf | 29 Jan 2024 |
| UNIT TYPES TOWER WISE signed by ArchitectFile: UNIT TYPES TOWER WISE signed by Architect.pdf | 29 Jan 2024 |
| ZR-BIAAPA-2021 - Artismo for CA & PARKSFile: ZR-BIAAPA-2021 - Artismo for CA & PARKS.pdf | 29 Jan 2024 |
| 77-6 Gift Deed 1File: 77-6 Gift Deed 1.pdf | 6 Jan 2024 |
| 77-6 Gift Deed 2File: 77-6 Gift Deed 2.pdf | 6 Jan 2024 |
| 77-6 Release deed - CR SureshFile: 77-6 Release deed - CR Suresh.pdf | 6 Jan 2024 |
| AFFIDAVIT BANKFile: AFFIDAVIT BANK.pdf | 6 Jan 2024 |
| AFFIDAVIT SECTION 3File: AFFIDAVIT SECTION 3.pdf | 6 Jan 2024 |
| AMENITIES & COMMON AREAS SIGNED BY ArchitectFile: AMENITIES & COMMON AREAS SIGNED BY Architect.pdf | 6 Jan 2024 |
| ARTISMO - BESCOM NOCFile: ARTISMO - BESCOM NOC.pdf | 6 Jan 2024 |
| Artismo - Borewell PicsFile: Artismo - Borewell Pics.pdf | 6 Jan 2024 |
| ARTISMO - BWSSB NOCFile: ARTISMO - BWSSB NOC.pdf | 6 Jan 2024 |
| ARTISMO - FIRE NOCFile: ARTISMO - FIRE NOC.pdf | 6 Jan 2024 |
| ARTISMO ITR BS PL - A Y 21-22File: ARTISMO ITR BS PL - A Y 21-22.pdf | 6 Jan 2024 |
| ARTISMO ITR BS PL - A Y 22-23File: ARTISMO ITR BS PL - A Y 22-23.pdf | 6 Jan 2024 |
| ARTISMO ITR BS PL - A Y 23-24File: ARTISMO ITR BS PL - A Y 23-24.pdf | 6 Jan 2024 |
| Bbmp Engr regn certificate - Prakash K - Self AttestedFile: Bbmp Engr regn certificate - Prakash K - Self Attested.pdf | 6 Jan 2024 |
| Change of land use for 77 - 6,9,15,16,17File: Change of land use for 77 - 6,9,15,16,17.pdf | 6 Jan 2024 |
| EAST_WEST_BUSINESS_CARPET AREA SIGNED BY ArchitectFile: EAST_WEST_BUSINESS_CARPET AREA SIGNED BY Architect.pdf | 6 Jan 2024 |
| KSPCB SANCTION DRAWING signed copyFile: KSPCB SANCTION DRAWING signed copy.pdf | 6 Jan 2024 |
| Land Cost Calculation reference by SRFile: Land Cost Calculation reference by SR.pdf | 6 Jan 2024 |
| LETTER REGARDING PHASE I DEVELOPMENTFile: LETTER REGARDING PHASE I DEVELOPMENT.pdf | 6 Jan 2024 |
| Proforma RERA -AFS - V2_ArtismoFile: Proforma RERA -AFS - V2_Artismo.pdf | 6 Jan 2024 |
| Relinquishment DeedFile: Relinquishment Deed.pdf | 6 Jan 2024 |
| RERA LAND COST self attested copyFile: RERA LAND COST self attested copy.pdf | 6 Jan 2024 |
| SITE AREA - Phase 1 & 2 DemarcationsFile: SITE AREA - Phase 1 & 2 Demarcations.pdf | 6 Jan 2024 |
| STP Feasibility Report signed copyFile: STP Feasibility Report signed copy.pdf | 6 Jan 2024 |
| UNIT TYPES TOWER WISE signed by ArchitectFile: UNIT TYPES TOWER WISE signed by Architect.pdf | 6 Jan 2024 |
| Updated Form 1 CA CertificateFile: Updated Form 1 CA Certificate.pdf | 6 Jan 2024 |
| EC - 77_6 2007-2023File: EC - 77_6 2007-2023.pdf | 6 Jan 2024 |
| EC - 77_7(2A8G) 2007-2015File: EC - 77_7(2A8G) 2007-2015.pdf | 6 Jan 2024 |
| EC - 77_7(22G) 2015-2023File: EC - 77_7(22G) 2015-2023.pdf | 6 Jan 2024 |
| EC - 77_9 2007-2023File: EC - 77_9 2007-2023.pdf | 6 Jan 2024 |
| EC - 77_9 2015-2023File: EC - 77_9 2015-2023.pdf | 6 Jan 2024 |
| EC - 77_16 2015-2023File: EC - 77_16 2015-2023.pdf | 6 Jan 2024 |
| EC - 77_17 2015-2023File: EC - 77_17 2015-2023.pdf | 6 Jan 2024 |
| RTC - 77_6File: RTC - 77_6.pdf | 6 Jan 2024 |
| RTC - 77_7File: RTC - 77_7.pdf | 6 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MILLIONAIRE TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 7 registered projects within 2 km.
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
EMBASSY VERDE
EMBASSY DEVELOPMENTS LIMITED
Aeropolis, a project of Sattva Group
TRINAYANI REALTOR PRIVATE LIMITED
DS MAX SKY SHLOKAM
DS Max Properties Private Limited
EMBASSY SOUTH RESERVE
SUMMIT DEVELOPMENTS LIMITED
Bhartiya Garden Estate Phase-1
Bhartiya Urban Pvt Ltd
See every Bengaluru Urban project, with the district possession charts
Builder: ARTISMO
ARTISMO has 1 registration on RERA Karnataka, including MILLIONAIRE TOWER. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MILLIONAIRE TOWER is delayed beyond 30 Sep 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MILLIONAIRE TOWER?
The registered promoter entity is ARTISMO, a partnership firm as per the filing. Its GSTIN 29AAMFP0635N1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MILLIONAIRE TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MILLIONAIRE TOWER?
The professionals named in the filing: Architect: MANJULA SOMASHEKAR; Engineer: K PRAKASH; Chartered Accountant: NIDISH AGARWAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MILLIONAIRE TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.