ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / MILLIONAIRE TOWER

Registration approved No litigation declared Mixed Development project

MILLIONAIRE TOWER

By ARTISMO

RG-KA-62092 · RERA PRM/KA/RERA/1251/472/PR/200224/006640 · Last updated on RERA Karnataka portal: 14 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2029Possession promisedno revision filed
1 of 18Construction stages donefurthest along: Foundation footing work, 72%
216 of 283Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 210 documents Report an error

MILLIONAIRE TOWER is a Mixed Development project by ARTISMO in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/200224/006640 on 20 Feb 2024. Possession is promised by 30 Sep 2029. 67 of the 283 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete.

At a glance

Project

  • NameMILLIONAIRE TOWER
  • TypeMixed Development
  • Location
    • Yelahanka
    • Bengaluru Urban
    • 562157
  • Pincode562157
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/472/PR/200224/006640
  • ReraGenie IDRG-KA-62092

Builder

  • NameARTISMO
  • Entity typePartnership Firm
  • GSTIN29AAMFP0635N1ZP
  • Authorized SignatoryMURALIDHAR M GURAPPA

Key dates

this monthRegisteredFeb 2024PromisedSep 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Feb 2024
  • Promised completion30 Sep 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed210 files

Current status

24%67 of 283 units booked
1.7%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MILLIONAIRE TOWER EAST---80080
MILLIONAIRE TOWER WEST---1000100
MILLIONAIRE TOWER BUSINESS-----103

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 72%.

Building: 17% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work72%
Upto Plinth Level62%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure49%
Masonry Construction21%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities48

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
LIBRARYYes0%
DOCTOR’S ROOMYes0%
PANTRY / STOREYes0%
HEALTH CLUBYes0%
TOILETS / CHANGEYes0%
CRECHEYes0%
LOUNGEYes0%
CIRCULATIONYes0%
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership7

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,288 sq m
Named landowners7
LandownerVillageDistrict
VIJAYALAKSHMI SRIDHARA--
Suresh CR--
C Rathnamma--
P Gopalkrishna--
Latha K--
Artismo--
Ramachandra M--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 125.99 cr
Cost incurredRs 2.12 cr
Spent of the estimate1.68%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 123.74 crRs 37.20 lakh
Architects, Engineer, Consultants Fees etcRs 2.00 cr-
Administrative CostsRs 25.00 lakh-
On-site expenditure-Salaries of workers-Rs 27.10 lakh
On-site expenditure-Consultants Fees-Rs 22.75 lakh
On-site expenditure-Site Overhead-Rs 53.54 lakh
Payment of fees-Rs 71.59 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANJULA SOMASHEKAR
EngineerK PRAKASH
Chartered AccountantNIDISH AGARWAL

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed210

As listed on the registration, under the names the promoter filed them with; the newest 80 of 210 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/200224/006640 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM - 4_Certificate_(Q2) SEP 2026.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: F5_Architect_Q2_Sep 2026.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: F6_Engineer_Q2_Sep 2026.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM - 4_Certificate_(Q1) JUNE 2026.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: F5_Architect_Q1_June 2026.pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: F6_Engineer_Q1_June 2026.pdf14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q1 2026-27 KPTCL- BESCOM14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM - 4_Certificate_(Q4) March 2026.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect_(Q4)_Jan to Mar 2026.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer_(Q3)_Jan to March 2026.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM - 4_Certificate_(Q3) December 2025.pdf12 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect_(Q3)_Oct to Dec 2025.pdf12 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer_(Q3)_Oct to Dec 2025.pdf12 Jan 2026
Q3 2025-26 Water supply and sewage board12 Jan 2026
Q3 2025-26 KPTCL- BESCOM12 Jan 2026
Artismo - Borewell PicsFile: Artismo - Borewell Pics.pdf29 Jan 2024
ARTISMO - BWSSB NOCFile: ARTISMO - BWSSB NOC.pdf29 Jan 2024
BIAAPA CDP Master plan - Chikkajala copy - Demarcated for CLU 77-7File: BIAAPA CDP Master plan - Chikkajala copy - Demarcated for CLU 77-7.pdf29 Jan 2024
BIAAPA CDP Master plan - Chikkajala for CLU 77-7File: BIAAPA CDP Master plan - Chikkajala for CLU 77-7.pdf29 Jan 2024
Change of land use for 77 - 6,9,15,16,17File: Change of land use for 77 - 6,9,15,16,17.pdf29 Jan 2024
Change of land use Sy no77_3A,3B,4,5 and 78_8,10A1,10BFile: Change of land use Sy no77_3A,3B,4,5 and 78_8,10A1,10B.pdf29 Jan 2024
CARPET AREA DETAILS AS PER RERA - UNITWISE (R20-19 01 24)File: CARPET AREA DETAILS AS PER RERA - UNITWISE (R20-19 01 24).xlsx29 Jan 2024
EC - 77_7(2A8G) 2007-2015File: EC - 77_7(2A8G) 2007-2015.pdf29 Jan 2024
EC - 77_15 2015-2023File: EC - 77_15 2015-2023.pdf29 Jan 2024
Millionaire Tower - Business Carpet AreaFile: Millionaire Tower - Business Carpet Area.pdf29 Jan 2024
Millionaire Tower - East Carpet AreaFile: Millionaire Tower - East Carpet Area.pdf29 Jan 2024
Millionaire Tower - West Carpet AreaFile: Millionaire Tower - West Carpet Area.pdf29 Jan 2024
MR Copies Clear CopyFile: MR Copies Clear Copy.pdf29 Jan 2024
PLAN APPROVAL LETTERFile: PLAN APPROVAL LETTER.pdf29 Jan 2024
Proforma RERA -AFS -V3_Artisomo - FINALFile: Proforma RERA -AFS -V3_Artisomo - FINAL.pdf29 Jan 2024
REGARDING FAR PHASE - I DEVELOPMENTFile: REGARDING FAR PHASE - I DEVELOPMENT.pdf29 Jan 2024
REGARDING NO OF UNITS IN PHASE - IFile: REGARDING NO OF UNITS IN PHASE - I.pdf29 Jan 2024
REGARDING PHASE I DEVELOPMENTFile: REGARDING PHASE I DEVELOPMENT.pdf29 Jan 2024
Relinquishment DeedFile: Relinquishment Deed.pdf29 Jan 2024
SCFSCS Loan Clearance - 77_6File: SCFSCS Loan Clearance - 77_6.pdf29 Jan 2024
SCFSCS NOC - 77_7File: SCFSCS NOC - 77_7.pdf29 Jan 2024
SITE AREA - Phase 1 & 2File: SITE AREA - Phase 1 & 2.pdf29 Jan 2024
Site Plan - Demarking for Phase 1File: Site Plan - Demarking for Phase 1.pdf29 Jan 2024
UNIT TYPES TOWER WISE signed by ArchitectFile: UNIT TYPES TOWER WISE signed by Architect.pdf29 Jan 2024
ZR-BIAAPA-2021 - Artismo for CA & PARKSFile: ZR-BIAAPA-2021 - Artismo for CA & PARKS.pdf29 Jan 2024
77-6 Gift Deed 1File: 77-6 Gift Deed 1.pdf6 Jan 2024
77-6 Gift Deed 2File: 77-6 Gift Deed 2.pdf6 Jan 2024
77-6 Release deed - CR SureshFile: 77-6 Release deed - CR Suresh.pdf6 Jan 2024
AFFIDAVIT BANKFile: AFFIDAVIT BANK.pdf6 Jan 2024
AFFIDAVIT SECTION 3File: AFFIDAVIT SECTION 3.pdf6 Jan 2024
AMENITIES & COMMON AREAS SIGNED BY ArchitectFile: AMENITIES & COMMON AREAS SIGNED BY Architect.pdf6 Jan 2024
ARTISMO - BESCOM NOCFile: ARTISMO - BESCOM NOC.pdf6 Jan 2024
Artismo - Borewell PicsFile: Artismo - Borewell Pics.pdf6 Jan 2024
ARTISMO - BWSSB NOCFile: ARTISMO - BWSSB NOC.pdf6 Jan 2024
ARTISMO - FIRE NOCFile: ARTISMO - FIRE NOC.pdf6 Jan 2024
ARTISMO ITR BS PL - A Y 21-22File: ARTISMO ITR BS PL - A Y 21-22.pdf6 Jan 2024
ARTISMO ITR BS PL - A Y 22-23File: ARTISMO ITR BS PL - A Y 22-23.pdf6 Jan 2024
ARTISMO ITR BS PL - A Y 23-24File: ARTISMO ITR BS PL - A Y 23-24.pdf6 Jan 2024
Bbmp Engr regn certificate - Prakash K - Self AttestedFile: Bbmp Engr regn certificate - Prakash K - Self Attested.pdf6 Jan 2024
Change of land use for 77 - 6,9,15,16,17File: Change of land use for 77 - 6,9,15,16,17.pdf6 Jan 2024
EAST_WEST_BUSINESS_CARPET AREA SIGNED BY ArchitectFile: EAST_WEST_BUSINESS_CARPET AREA SIGNED BY Architect.pdf6 Jan 2024
KSPCB SANCTION DRAWING signed copyFile: KSPCB SANCTION DRAWING signed copy.pdf6 Jan 2024
Land Cost Calculation reference by SRFile: Land Cost Calculation reference by SR.pdf6 Jan 2024
LETTER REGARDING PHASE I DEVELOPMENTFile: LETTER REGARDING PHASE I DEVELOPMENT.pdf6 Jan 2024
Proforma RERA -AFS - V2_ArtismoFile: Proforma RERA -AFS - V2_Artismo.pdf6 Jan 2024
Relinquishment DeedFile: Relinquishment Deed.pdf6 Jan 2024
RERA LAND COST self attested copyFile: RERA LAND COST self attested copy.pdf6 Jan 2024
SITE AREA - Phase 1 & 2 DemarcationsFile: SITE AREA - Phase 1 & 2 Demarcations.pdf6 Jan 2024
STP Feasibility Report signed copyFile: STP Feasibility Report signed copy.pdf6 Jan 2024
UNIT TYPES TOWER WISE signed by ArchitectFile: UNIT TYPES TOWER WISE signed by Architect.pdf6 Jan 2024
Updated Form 1 CA CertificateFile: Updated Form 1 CA Certificate.pdf6 Jan 2024
EC - 77_6 2007-2023File: EC - 77_6 2007-2023.pdf6 Jan 2024
EC - 77_7(2A8G) 2007-2015File: EC - 77_7(2A8G) 2007-2015.pdf6 Jan 2024
EC - 77_7(22G) 2015-2023File: EC - 77_7(22G) 2015-2023.pdf6 Jan 2024
EC - 77_9 2007-2023File: EC - 77_9 2007-2023.pdf6 Jan 2024
EC - 77_9 2015-2023File: EC - 77_9 2015-2023.pdf6 Jan 2024
EC - 77_16 2015-2023File: EC - 77_16 2015-2023.pdf6 Jan 2024
EC - 77_17 2015-2023File: EC - 77_17 2015-2023.pdf6 Jan 2024
RTC - 77_6File: RTC - 77_6.pdf6 Jan 2024
RTC - 77_7File: RTC - 77_7.pdf6 Jan 2024

How this compares with Bengaluru Urban

24%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MILLIONAIRE TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMILLIONAIRE TOWEROther 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: ARTISMO

ARTISMO has 1 registration on RERA Karnataka, including MILLIONAIRE TOWER. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MILLIONAIRE TOWER is delayed beyond 30 Sep 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MILLIONAIRE TOWER?

The registered promoter entity is ARTISMO, a partnership firm as per the filing. Its GSTIN 29AAMFP0635N1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MILLIONAIRE TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MILLIONAIRE TOWER?

The professionals named in the filing: Architect: MANJULA SOMASHEKAR; Engineer: K PRAKASH; Chartered Accountant: NIDISH AGARWAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MILLIONAIRE TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MILLIONAIRE TOWER. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MILLIONAIRE TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.