Home / Browse projects / Amravati, Maharashtra / MILLENIUM PARK
MILLENIUM PARK
RG-MH-12979 · RERA P50300054112 · Last updated on MahaRERA portal: 10 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MILLENIUM PARK is a Commercial project by CITY EMPIRE INFRA LLP in Amravati, Maharashtra, registered with MahaRERA as P50300054112 on 27 Dec 2023. Possession is promised by 30 Apr 2027.
At a glance
Project
- NameMILLENIUM PARK
- TypeCommercial
- Location
- KATHORA ROAD
- MOUJE SHEGAON
- Amravati (M Corp.)
- Amravati
- 444604
- Pincode444604
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50300054112
- ReraGenie IDRG-MH-12979
Builder
- NameCITY EMPIRE INFRA LLP
- Entity typePartnership
- PartnersSHIRISH SURESHPANT AGRAWAL, HARISH SURESH GOHOTRE, BHUSHAN LAXMANRAO THANGAN, MAYA GIRISH NAGPURE, AASHISH DILIPRAO POTE, SHEELA SURESH GOHOTRE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Dec 2023
- Promised completion30 Apr 2027
- Revised completionNone
- Buildings1 building record
- Documents filed89 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MILLENIUM PARK | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 20%.
MILLENIUM PARK: 13% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 20% |
| Podiums (if any) | 0% |
| Plinth | 20% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed250
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GIRISH NAGPURE |
| Engineer | YOGESH PRAKASHRAO SAURKAR |
| Chartered Accountant | CA DEEPAK ZAMBANI G A D AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| CITY EMPIRE INFRA LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2027
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: City EMpire_Form 1_311225.pdf | 10 Jul 2026 |
| Form 2File: City EMpire_Form 2_311225.pdf | 10 Jul 2026 |
| Form 3File: City EMpire_Form 3_311225.pdf | 10 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: City EMpire_Sold Unsold_311225.pdf | 10 Jul 2026 |
| Form 1File: Millenium_Form 1_310326.pdf | 9 Jul 2026 |
| Form 2File: Millenium_Form 2_310326.pdf | 9 Jul 2026 |
| Form 3File: Millenium_Form 3_310326.pdf | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Millenium_Sold Unsold_310326.pdf | 9 Jul 2026 |
| Form 1File: Millenium_Form 1_300925.pdf | 24 Nov 2025 |
| Form 2File: Millenium_Form 2_300925.pdf | 24 Nov 2025 |
| Form 3File: Millenium_Form 3_300925.pdf | 24 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Millenium_Sold Unsold_300925.pdf | 24 Nov 2025 |
| Form 1File: Form 1_300625.pdf | 9 Aug 2025 |
| Form 2File: Form 2_300625.pdf | 9 Aug 2025 |
| Form 3File: Form 3_300625_compressed.pdf | 9 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold_300625.pdf | 9 Aug 2025 |
| Form 1File: Form 1_300624.pdf | 9 Aug 2025 |
| Form 2File: Form 2_300624.pdf | 9 Aug 2025 |
| Form 3File: Form 3_300624_compressed.pdf | 9 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold_300624.pdf | 9 Aug 2025 |
| Form 1File: Form 1_310324.pdf | 9 Aug 2025 |
| Form 2File: Form 2_310324.pdf | 9 Aug 2025 |
| Form 3File: Form 3_310324_compressed.pdf | 9 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold_310324.pdf | 9 Aug 2025 |
| Form 1File: Architect Certificate - Millenium Park.pdf | 9 Aug 2025 |
| Form 2File: Engineer Certificate - Millenium Park.pdf | 9 Aug 2025 |
| Form 3File: Form 3_300924_compressed.pdf | 9 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_300924.pdf | 9 Aug 2025 |
| Form 1File: Millenium_Form 1.pdf | 5 Aug 2025 |
| Form 2File: Millenium_Form 2.pdf | 5 Aug 2025 |
| Form 3File: Millenium_Form 3.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Millenium_Sold Unsold.pdf | 5 Aug 2025 |
| Form 1File: Form 1_311223.pdf | 5 Aug 2025 |
| Form 2File: Form 2_311223.pdf | 5 Aug 2025 |
| Form 3File: Millenium_Form 3_311223.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SoldUnsold_311223.pdf | 5 Aug 2025 |
| Form 1File: Form 1_310325.pdf | 5 Aug 2025 |
| Form 2File: Form 2_310325.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SoldUnsold_310325.pdf | 5 Aug 2025 |
| Form 3File: Form 3_310325_compressed.pdf | 5 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Millenium_Form 1.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Millenium_Form 3_compressed.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Millenium_Form 2.pdf | 17 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Millenium_Sold Unsold.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Millenium Park.pdf | 27 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Millenium Park.pdf | 27 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Millenium 310324.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ScannerGo_1707810936707.pdf | 14 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ScannerGo_1707810814832.pdf | 14 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: CITY EMPIRE_SOLD AND UNSOLD FOR RERA_compressed.pdf | 14 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHEGAON_Form 3_311223.pdf | 8 Feb 2024 |
| Other - TechnicalFile: City_Mail.pdf | 12 Dec 2023 |
| Other - TechnicalFile: Declaration City.pdf | 12 Dec 2023 |
| CERSAI detailsFile: City_CERSAI 051223.pdf | 5 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: City_Form 3.pdf | 5 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: City_Bank Declaration 051223.pdf | 5 Dec 2023 |
| Other - FinanceFile: City_CC Mail.pdf | 5 Dec 2023 |
| Other - TechnicalFile: City_CC Mail.pdf | 5 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Shegaon_Encumberance.pdf | 11 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Shegaon_Encumberance.pdf | 11 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Shegaon_Commencement Certificate.pdf | 11 Nov 2023 |
| Declaration about Commencement CertificateFile: Shegaon_Format D Commencement.pdf | 11 Nov 2023 |
| Proforma of Allotment letterFile: Shegaon_Allotment Letter.pdf | 11 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: Shegaon_Deviation Allotment.pdf | 11 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: Shegaon_Deviation AFS.pdf | 11 Nov 2023 |
| Layout approvalFile: Shegaon_Layout Map.pdf | 10 Nov 2023 |
| Layout approvalFile: Shegaon_NA Order.pdf | 10 Nov 2023 |
| Layout approvalFile: Shegaon_Amalgamation order.pdf | 10 Nov 2023 |
| Layout approvalFile: Shegaon_Amalgamation order.pdf | 10 Nov 2023 |
| Building plan approvalFile: Millenium_Map 1.pdf | 10 Nov 2023 |
| Building plan approvalFile: Millenium_Map 2.pdf | 10 Nov 2023 |
| Building plan approvalFile: Millenium_Map 3.pdf | 10 Nov 2023 |
| PAN CardFile: Shegaon_Pan.pdf | 10 Nov 2023 |
| Copy of the legal title reportFile: Shegaon_Search_compressed.pdf | 10 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Shegaon_Layout Map.pdf | 10 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Shegaon_NA Order.pdf | 10 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Shegaon_Amalgamation order.pdf | 10 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Shegaon_Amalgamation order.pdf | 10 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Millenium_Map 1.pdf | 10 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Millenium_Map 2.pdf | 10 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Amravati
Computed across the 450+ Amravati projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MILLENIUM PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOUJE SHEGAON450+ in Amravati
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
VEDAH PHASE 1
TRENDBUILT LIFESPACES LLP
Madhavam Heights
Sky Line Infra Vision
JANNAT COMPLEX
MOHAMMAD AAMIR AHMAD
VIJAY FORTUNE
VIJAY PARANJAPE ESTATE LLP
Dream Imperia
Vilas Ramrao Gawai
SHREE GAJANAN ENCLAVE
AJAY NAMDEORAO DAMBALE
See every Amravati project, with the district possession charts
Builder: CITY EMPIRE INFRA LLP
CITY EMPIRE INFRA LLP has 1 registration on MahaRERA, including MILLENIUM PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.
Frequently asked questions
What are my rights if MILLENIUM PARK is delayed beyond 30 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MILLENIUM PARK?
The registered promoter entity is CITY EMPIRE INFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MILLENIUM PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MILLENIUM PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MILLENIUM PARK?
The professionals named in the filing: Architect: GIRISH NAGPURE; Engineer: YOGESH PRAKASHRAO SAURKAR; Chartered Accountant: CA DEEPAK ZAMBANI G A D AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MILLENIUM PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback