Midas Natures Nest
RG-MH-43549 · RERA P50400015692 · Last updated on MahaRERA portal: 22 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 45 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Wardha registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Midas Natures Nest is a Residential / Group Housing project by Midas Dream Built Pvt Ltd in Wardha, Maharashtra, registered with MahaRERA as P50400015692 on 16 Mar 2018. Possession is promised by 31 Mar 2027. The completion date has moved by 45 months from the original filing. 13 of the 24 units on this registration are recorded sold or booked, and 107 of 264 construction stages are filed complete.
At a glance
Project
- NameMidas Natures Nest
- TypeResidential / Group Housing
- Location
- Bori
- Seloo
- Wardha
- 442104
- Pincode442104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50400015692
- ReraGenie IDRG-MH-43549
Builder
- NameMidas Dream Built Pvt Ltd
- Entity typeCompany
- Managing DirectorManish Narayanrao Ballal
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Mar 2018
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 30 Jun 2023)
- Buildings24 building records
- Documents filed115 files
Current status
Figures as on 22 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing D Bungalow No 1 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing D Bungalow No 2 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing D Bungalow No 3 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing D Bungalow No 4 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing A Bungalow No 5 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing A Bungalow No 6 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing A Bungalow No 7 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing A Bungalow No 8 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing A Bungalow No 9 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing A Bungalow No 10 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing B Bungalow No 11 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing B Bungalow No 12 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing B Bungalow No 13 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing B Bungalow No 14 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing B Bungalow No 15 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing B Bungalow No 16 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing C Bungalow No 17 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing C Bungalow No 18 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing C Bungalow No 19 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing C Bungalow No 20 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing C Bungalow No 21 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing c bungalow No 22 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing C Bungalow No 23 | NA | 1 | 1 | 1 | 0 | 1 |
| Wing C Bungalow No 24 | NA | 1 | 1 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 22 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 24 buildings; the table lists the first 20.
107 of 264 construction stages are filed complete across 24 buildings. The stage furthest along is Staircases, at 70%.
Wing D Bungalow No 173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing D Bungalow No 29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing D Bungalow No 373%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing D Bungalow No 473%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing A Bungalow No 573%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing A Bungalow No 673%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing A Bungalow No 773%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing A Bungalow No 835%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing A Bungalow No 973%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing A Bungalow No 1073%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B Bungalow No 1173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing B Bungalow No 1245%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B Bungalow No 1327%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B Bungalow No 149%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B Bungalow No 159%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B Bungalow No 169%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C Bungalow No 179%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C Bungalow No 189%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C Bungalow No 1973%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C Bungalow No 2073%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Manoj M Mhaisgawali |
| Engineer | Manoj Madhukarrao Mhaisgawali |
| Chartered Accountant | Atul Bhaiyya |
| Partner | Role in project |
|---|---|
| Midas Dream Built Pvt Ltd | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCovid and Labour Issues
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Mar 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Mar 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 1 Form1.pdf | 22 Jul 2025 |
| Form 2File: 2 Form 2.pdf | 22 Jul 2025 |
| Form 3File: Form 3 31-12-2021.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Inventory.pdf | 22 Jul 2025 |
| Form 1File: Form 1_31-03-22.pdf | 22 Jul 2025 |
| Form 2File: Form 2_31-03-22.pdf | 22 Jul 2025 |
| Form 3File: Form 3 31-03-2022.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sales_31-03-22.pdf | 22 Jul 2025 |
| Form 1File: Form1_30-6-22.pdf | 22 Jul 2025 |
| Form 2File: Form2_30-6-22.pdf | 22 Jul 2025 |
| Form 3File: Form 3 30-06-2022.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sales_30-06-22.pdf | 22 Jul 2025 |
| Form 1File: Form 1_30-9-22.pdf | 22 Jul 2025 |
| Form 2File: Form 2_30-09-22.pdf | 22 Jul 2025 |
| Form 3File: Form 3 30-09-2022.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sales_30-09-22.pdf | 22 Jul 2025 |
| Form 1File: Form 1 31-12-22.pdf | 22 Jul 2025 |
| Form 2File: Form 2 31-12-22.pdf | 22 Jul 2025 |
| Form 3File: Form 3 31-12-22.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sales_31-12-22.pdf | 22 Jul 2025 |
| Form 1File: 1 Architect Certificate.pdf | 22 Jul 2025 |
| Form 2File: 2 Engineer Certificate.pdf | 22 Jul 2025 |
| Form 3File: 3 FORM 3.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Inventory 31-03-23.pdf | 22 Jul 2025 |
| Form 2File: Engg Certificate 30-06-23.pdf | 22 Jul 2025 |
| Form 3File: Form -3 30-06-2023 scan and sign.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY 30-6-23.pdf | 22 Jul 2025 |
| Form 1File: form 1 30-6-2023.pdf | 22 Jul 2025 |
| Form 2File: Enggi Certificate 30-9-23.pdf | 22 Jul 2025 |
| Form 3File: Form -3 30-09-2023 sign and scan.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY 30-9-23.pdf | 22 Jul 2025 |
| Form 1File: Arch Certi 30-9-23.pdf | 22 Jul 2025 |
| Form 1File: Archi Certificate-31-12-23.pdf | 22 Jul 2025 |
| Form 2File: Engg Certificate 31-12-23.pdf | 22 Jul 2025 |
| Form 3File: Form -3 31-12-2023 sign and scan.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY 31-12-23.pdf | 22 Jul 2025 |
| Form 1File: Arch Certificate-31-03-24.pdf | 22 Jul 2025 |
| Form 2File: Engg Certificate 31-3-24.pdf | 22 Jul 2025 |
| Form 3File: Form -3 31-03-2024 sign and scan.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY 31-3-24.pdf | 22 Jul 2025 |
| Form 1File: Arch Certificate 30-06-24.pdf | 22 Jul 2025 |
| Form 2File: Engg Certificate 30-6-24.pdf | 22 Jul 2025 |
| Form 3File: Form -3 30-06-2024 sign and scan.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY 30-6-24.pdf | 22 Jul 2025 |
| Form 1File: Arch Certi -30-09-24.pdf | 22 Jul 2025 |
| Form 2File: Engg Certificate 30-9-24.pdf | 22 Jul 2025 |
| Form 3File: form -3 30-09-2024 sign and scan.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY 30-9-24.pdf | 22 Jul 2025 |
| Form 1File: Arch Certificate 31-12-24.pdf | 22 Jul 2025 |
| Form 2File: Engg Certificate 31-12-24.pdf | 22 Jul 2025 |
| Form 3File: Form -3 31-12-2024 sign and scan.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY 31-12-24.pdf | 22 Jul 2025 |
| Form 1File: Arch Certificate 31-03-25.pdf | 22 Jul 2025 |
| Form 2File: Engg Certificate 31-3-25.pdf | 22 Jul 2025 |
| Form 3File: Form -3 31-03-2025 SCAN AND SIGN.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY 31-3-25.pdf | 22 Jul 2025 |
| Declaration in FORM BFile: FORM- B_.pdf | 23 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5 mar23.pdf | 17 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate.pdf | 27 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate.pdf | 27 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 4 Form 2A.pdf | 27 May 2023 |
| Disclosure of sold/ booked inventoryFile: 5 Inventory 31-03-23.pdf | 27 May 2023 |
| Certificates of CA (Form 3)File: Form 3 31-12-22.pdf | 27 May 2023 |
| Certificates of CA (Form 3)File: 3 FORM 3.pdf | 27 May 2023 |
| Certificates of CA (Form 3)File: Form 3 Scan.pdf | 29 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 Scan.pdf | 29 Mar 2023 |
| Certificates of CA (Form 3)File: form 3 Scan.pdf | 29 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 31-12-21.pdf | 29 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 31-03-22.pdf | 29 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 30-06-22.pdf | 29 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 30-09-22.pdf | 29 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19.pdf | 29 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.pdf | 29 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.pdf | 29 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 2021-2022.pdf | 29 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_31-12-21.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_31-03-22.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_30-6-22.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_30-9-22.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_31-12-22.pdf | 16 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Wardha
Computed across the 290+ Wardha projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Midas Natures Nest on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bori290+ in Wardha
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
KESARIYA NAGARI
RAKESH M. MADE
KINGS VILLAGE
VYANKATESH ASSETS MAXIMIZER ASSETS PRIVATE
DEHU AALANDI PARK
DAMOHAR MAHADEORAO MANKAR
SHREE KRISHNA NAGAR
ARTH LAND DEVELOPERS
GANESH NAGAR
Sanjay Tejmal Ostwal
KIRANGE NAGARI
VISHVANATH RAMA KIRANGE
See every Wardha project, with the district possession charts
Builder: Midas Dream Built Pvt Ltd
Midas Dream Built Pvt Ltd has 1 registration on MahaRERA, including Midas Natures Nest. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Wardha district page.
Frequently asked questions
What are my rights if Midas Natures Nest is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Midas Natures Nest?
The registered promoter entity is Midas Dream Built Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Midas Natures Nest?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Midas Natures Nest?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Midas Natures Nest?
The professionals named in the filing: Architect: Manoj M Mhaisgawali; Engineer: Manoj Madhukarrao Mhaisgawali; Chartered Accountant: Atul Bhaiyya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Midas Natures Nest?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback