Home / Browse projects / Pune, Maharashtra / Meghsparsh D Wing
Meghsparsh D Wing
By Shri Venkatesh Sharada Alliance
RG-MH-31284 · RERA P52100079618 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 25.00 crore secured on the land, in favour of ICICI Home Finance Company Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Meghsparsh D Wing is a Others project by Shri Venkatesh Sharada Alliance in Pune, Maharashtra, registered with MahaRERA as P52100079618 on 17 Mar 2025. Possession is promised by 31 Dec 2029. 11 of the 40 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameMeghsparsh D Wing
- TypeOthers
- Location
- Pune Satara Highway
- Ambegaon khurd
- AMBEGAON KH
- Haveli
- Pune
- 411046
- Pincode411046
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100079618
- ReraGenie IDRG-MH-31284
Builder
- NameShri Venkatesh Sharada Alliance
- Entity typePartnership
- PartnersPriyanka Pramod Sathe, Vilas Rakhamaji Yadav, Rahul Balasaheb Karadge, Rajendra Shankarrao Kutte, Varsha Kiran Samant, Yash Sharad Rajbhoj, Ganesh Gopinath Mohite, Akash Pramod Sathe
- Other registrations1 more →
- Completed1 of 2
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Mar 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 13 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing D | NA | 12 | 8 | 34 | 6 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.
Wing D: 36% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed105
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing D | NA | Rs 29.49 cr | Rs 5.65 cr |
| - | NA | Rs 2.94 cr | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Cubix Architect Associates |
| Engineer | Shivaji Machindra Chavan Machindra Chavan |
| Chartered Accountant | Avinash Jeevan Utgikar Jeevan Utagikar |
| Partner | Role in project |
|---|---|
| Shri Venkatesh Sharada Alliance | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate Form 1 30062026.pdf | 13 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Form 2 30062026.pdf | 13 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 30062026.pdf | 13 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate Form-1 11042026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 29072025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate Form-3 17042026_compressed.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate form 1 17012026.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 29072025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 17012026.pdf | 4 Feb 2026 |
| Form 1File: Architect Certificate02042025.pdf | 4 Dec 2025 |
| Form 2File: Engineer Certificate02042025.pdf | 4 Dec 2025 |
| Form 3File: Form 3 dtd04042025.pdf | 4 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 20251204155328.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 29072025.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 29072025.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 30092025.pdf | 3 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf | 8 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form -5 26092025.pdf | 29 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 29072025.pdf | 29 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 29072025.pdf | 29 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 29072025.pdf | 29 Jul 2025 |
| Architect Certificate02042025 | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 29 Apr 2025 |
| Engineer Certificate02042025 | 29 Apr 2025 |
| Other - TechnicalFile: plot area application for d building rera.pdf | 26 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SVSA compressed.pdf | 7 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Self Declaration regarding Financial Encumbrances.pdf | 3 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Self Declaration regarding Financial Encumbrances.pdf | 3 Mar 2025 |
| Building plan approvalFile: Meghsparsh D BP Layout.pdf | 1 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Meghsparsh D BP Layout.pdf | 1 Mar 2025 |
| Other - TechnicalFile: Declaration about plot Area.pdf | 1 Mar 2025 |
| Other - TechnicalFile: Annexure A Declaration cum undertaking.pdf | 22 Feb 2025 |
| Other - TechnicalFile: CC confirmation.pdf | 21 Feb 2025 |
| Copy of the legal title reportFile: Declaration for plot area.pdf | 14 Feb 2025 |
| Proforma of Allotment letterFile: Allotment letter-14022025.pdf | 14 Feb 2025 |
| Other - LegalFile: Sale Deed 8193 04092012 compressed 11zon.pdf | 14 Feb 2025 |
| Other - LegalFile: Conveyance Deed 787 compressed compressed.pdf | 14 Feb 2025 |
| Other - LegalFile: 7-12 extract copy.pdf | 14 Feb 2025 |
| Other - LegalFile: Sale Deed 12011 28122012 compressed.pdf | 14 Feb 2025 |
| Proforma of Agreement for saleFile: Agreement sale format 14022025.pdf | 14 Feb 2025 |
| PAN CardFile: Partners pan card copy compressed.pdf | 4 Feb 2025 |
| Copy of the legal title reportFile: Legal search report compressed.pdf | 4 Feb 2025 |
| Layout approvalFile: layout plan 01compressed.pdf | 30 Jan 2025 |
| Building plan approvalFile: Meghsparsh D DP Layout.pdf | 30 Jan 2025 |
| Building plan approvalFile: plan 01-08 compressed.pdf | 30 Jan 2025 |
| Building plan approvalFile: plan 02-08 compressed.pdf | 30 Jan 2025 |
| Building plan approvalFile: plan 03-08 compressed.pdf | 30 Jan 2025 |
| Building plan approvalFile: plan 04-08 compressed.pdf | 30 Jan 2025 |
| Building plan approvalFile: plan 05-08 compressed.pdf | 30 Jan 2025 |
| Building plan approvalFile: plan 06-08 compressed.pdf | 30 Jan 2025 |
| Building plan approvalFile: plan 07-08 compressed.pdf | 30 Jan 2025 |
| Building plan approvalFile: plan 08-08 compressed.pdf | 30 Jan 2025 |
| PAN CardFile: Firm Pan Card.PDF | 30 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Legal Encumbrances.pdf | 30 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: layout plan 01compressed.pdf | 30 Jan 2025 |
| Declaration in FORM BFile: Form B Builder compressed.pdf | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 compressed.pdf | 30 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Meghsparsh D DP Layout.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 08-08 compressed.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 07-08 compressed.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 06-08 compressed.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 05-08 compressed.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 04-08 compressed.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 03-08 compressed.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 02-08 compressed.pdf | 30 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 01-08 compressed.pdf | 30 Jan 2025 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 30 Jan 2025 |
| CERSAI detailsFile: Self Declaration about No Security interest on immpovable property.pdf | 30 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Form A Declaration about Separate Bank account.pdf | 30 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: Self Declaration Regarding Deviation Alteration Allotment Letter.pdf | 30 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Self Declaration Regarding Legal Encumbrances.pdf | 30 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: Self Declaration about Deviation alteration of Agreement to sale.pdf | 30 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A APS.pdf | 30 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A GGM.pdf | 30 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A PPS.pdf | 30 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A RBK.pdf | 30 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A RSK.pdf | 30 Jan 2025 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Meghsparsh Building C | Ambegaon Khurd Tal Haveli Dist Pune Pune | 48 | Completed | Jul 2019 | Sep 2018 |
| Meghsparsh A B Wing | Ambegaon Khurd Pune Tal Haveli Dist Pune | 174 | Completed | Dec 2015 | Aug 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Meghsparsh D Wing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ambegaon khurd13,700+ in Pune
Filed coordinates, straight-line distance. 172 registered projects within 2 km.
Sai Nagari Phase I
Saikedareshwar Developers LLP
SAI NAGARI Phase V
Saikedareshwar Developers LLP
Sai Nagari Phase II
Saikedareshwar Developers LLP
Sai Nagari Phase IV
Saikedareshwar Developers LLP
Sai Nagari Phase III
Saikedareshwar Developers LLP
Bella Casa - Phase 1
Kakkad Infra LLP
Builder: Shri Venkatesh Sharada Alliance
Shri Venkatesh Sharada Alliance has 2 registrations on MahaRERA, including Meghsparsh Building C and Meghsparsh D Wing. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Meghsparsh D Wing is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Meghsparsh D Wing?
The registered promoter entity is Shri Venkatesh Sharada Alliance, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Meghsparsh D Wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Meghsparsh D Wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Meghsparsh D Wing?
The professionals named in the filing: Architect: Cubix Architect Associates; Engineer: Shivaji Machindra Chavan Machindra Chavan; Chartered Accountant: Avinash Jeevan Utgikar Jeevan Utagikar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Meghsparsh D Wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback