Home / Browse projects / Mumbai Suburban, Maharashtra / MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED
MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED
By YOGIRAJ BUILDERS AND DEVELOPERS
RG-MH-31743 · RERA P51800080078 · Last updated on MahaRERA portal: 27 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED is a Residential / Group Housing project by YOGIRAJ BUILDERS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080078 on 23 Apr 2025. Possession is promised by 31 Dec 2027. 0 of the 38 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameMEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED
- TypeResidential / Group Housing
- Location
- Main Carter Road
- Borivali East
- Kanheri
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- RERA no.P51800080078
- ReraGenie IDRG-MH-31743
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Apr 2025
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed51 files
Current status
Figures as on 27 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MEERA UPVAN CHS LIMITED | NA | 14 | 11 | 23 | 15 | 38 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.
MEERA UPVAN CHS LIMITED: 51% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 11% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed45
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED | Kanheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MEERA UPVAN CHS LIMITED | NA | Rs 22.89 cr | Rs 10.99 cr |
| - | NA | Rs 1.20 cr | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAULI ENTERPRISES |
| Engineer | Technogem Consultantancy Services |
| Chartered Accountant | H P Jadeja & Associates |
| Partner | Role in project |
|---|---|
| YOGIRAJ BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed51
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 Q3 25-26 Meera Upvan.pdf | 27 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 Q4 25-26 Meera Upvan.pdf | 27 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 Q3 25-26 Meera Upvan.pdf | 27 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 Q4 25-26 Meera Upvan.pdf | 27 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 Q3 25-26 Meera Upvan.pdf | 27 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 Q4 25-26 Meera Upvan.pdf | 27 Jun 2026 |
| Withdrawal Update Form 1File: Form-1 Q1 25-26.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Q2 25-26.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 Q1-FY-2526.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Q2 25-26.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Q1 25-26.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Q2 25-26.pdf | 4 Feb 2026 |
| Other - LegalFile: Meera Upvan-Rectified Declaration of Land Onwers.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA FNL -REVISED With Table G New Notes.pdf | 7 Apr 2025 |
| Other - LegalFile: Power of Attorney-MU.pdf | 28 Mar 2025 |
| Other - FinanceFile: Power of Attorney-MU.pdf | 28 Mar 2025 |
| Other - FinanceFile: Landowner Declaration for No Bank Account-MU.pdf | 28 Mar 2025 |
| Other - LegalFile: Suppliment Agreement -Meeraupvan_11zon (2)-181-245.pdf | 25 Mar 2025 |
| Other - LegalFile: Suppliment Agreement -Meeraupvan_11zon (2)-61-120.pdf | 25 Mar 2025 |
| Other - LegalFile: Suppliment Agreement -Meeraupvan_11zon (2)-1-60.pdf | 25 Mar 2025 |
| Other - LegalFile: 1 Other - Legal.pdf | 25 Mar 2025 |
| Other - LegalFile: Suppliment Agreement -Meeraupvan_11zon (2)-121-180.pdf | 25 Mar 2025 |
| Other - FinanceFile: 1 Other - Legal.pdf | 25 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (1).pdf | 15 Mar 2025 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (2).pdf | 4 Mar 2025 |
| Layout approvalFile: PLAN-FINAL.pdf | 27 Feb 2025 |
| PAN CardFile: YOGIRAJ PAN CARD.pdf | 27 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN-FINAL.pdf | 27 Feb 2025 |
| Proforma of Allotment letterFile: 1 Proforma Allotment Letter-Parking-Amenities-REA-Bank MU.pdf | 27 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Appendix-F Architect-Plint Certi-Meera Upvan.pdf | 27 Feb 2025 |
| CERSAI detailsFile: CERSAI Undertaking with Report-FINAL.pdf | 27 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format-B Bank Meera Upvan-Revised.pdf | 27 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format-B Bank Meera Upvan-Revised.pdf | 27 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC up to 9th Floor 23 11 2023.pdf | 22 Feb 2025 |
| Declaration in FORM BFile: Latest Form-B-Promoter-Meera Upvan.pdf | 18 Feb 2025 |
| Copy of the legal title reportFile: Legal Title Certificate.pdf | 17 Feb 2025 |
| Copy of the legal title reportFile: 1 Copy of the legal title report (3).pdf | 17 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance (1).pdf | 13 Feb 2025 |
| Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance (1).pdf | 13 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 1 Disclosure for secured_unsecured finance availed for the project (1).pdf | 13 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation AFS.pdf | 6 Feb 2025 |
| Proforma of Agreement for saleFile: 2 Proforma AFS-Parking-Amenities-REA-MU.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect - Reg.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer.pdf | 21 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter.pdf | 4 Nov 2024 |
| Other - TechnicalFile: Annexure-A Standalone Building.pdf | 4 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf | 28 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf | 28 Oct 2024 |
| Building plan approvalFile: IOD.pdf | 20 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf | 20 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other organisation.pdf | 20 Apr 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Swayambhu Residency CHS Ltd | CTS No 226 A 2 Village Kanheri Taluka Borivali Chinchpada Carter Road No 02 Borivali East Mumbai 400066 | 74 | Completed | Nov 2022 | Nov 2022 |
| Swayambhu Gaondevi SRA CHS Ltd | CTS No. 226 A 2 Village Kanheri Taluka Borivali Chinchpada Carter Road No. 02 Borivali East Mumbai 400066 | 213 | Completed | Jul 2017 | Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 51 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali East6,700+ in Mumbai Suburban
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: YOGIRAJ BUILDERS AND DEVELOPERS
Yogiraj Builders and Developers has 3 registrations on MahaRERA, including Swayambhu Residency and MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED?
The registered promoter entity is YOGIRAJ BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED?
The professionals named in the filing: Architect: MAULI ENTERPRISES; Engineer: Technogem Consultantancy Services; Chartered Accountant: H P Jadeja & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback