Home / Browse projects / Nashik, Maharashtra / MAYURESHWAR PARK AND ROW HOUSES

Completed No litigation declared Residential / Group Housing project

MAYURESHWAR PARK AND ROW HOUSES

By ASHTVINAYAK CONSTRUCTION

RG-MH-79527 · RERA P51600049753 · Last updated on MahaRERA portal: 3 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Aug 2025Possession promisedregistration recorded completed
38 of 55Construction stages doneacross 5 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

MAYURESHWAR PARK AND ROW HOUSES is a Residential / Group Housing project by ASHTVINAYAK CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600049753 on 24 Feb 2023. The registration is recorded completed; possession was promised by 31 Aug 2025.

At a glance

Project

  • NameMAYURESHWAR PARK AND ROW HOUSES
  • TypeResidential / Group Housing
  • Location
    • NASHIK PUNE ROAD
    • PALSE
    • Nashik
    • 422102
  • Pincode422102
  • RERA no.P51600049753
  • ReraGenie IDRG-MH-79527

Builder

  • NameASHTVINAYAK CONSTRUCTION
  • Entity typePartnership
  • PartnersPRAVIN DATTATRAY CHAUDHARI, KIRAN MADHUKAR NARVADE, SONALI KIRAN NARAVADE, USHA PRAVIN CHAUDHARI
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023PromisedAug 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Feb 2023
  • Promised completion31 Aug 2025
  • Revised completionNone
  • Buildings5 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAYURESHWAR PARKNA30000
MAYURESHWAR ROW HOUSE 1NA10000
MAYURESHWAR ROW HOUSE 2NA10000
MAYURESHWAR ROW HOUSE 3NA10000
MAYURESHWAR ROW HOUSE 4NA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 3 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

38 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 0%.

MAYURESHWAR PARK73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MAYURESHWAR ROW HOUSE 173%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MAYURESHWAR ROW HOUSE 264%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MAYURESHWAR ROW HOUSE 373%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MAYURESHWAR ROW HOUSE 464%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Open Space17
BuildingOpen SpaceTotal
MAYURESHWAR PARK1313
MAYURESHWAR ROW HOUSE 111
MAYURESHWAR ROW HOUSE 211
MAYURESHWAR ROW HOUSE 311
MAYURESHWAR ROW HOUSE 411

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area612 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI858.35
Proposed, not sanctioned858 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAT PALSE TAL AND DIST NASHIK

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAURAV BADWE
EngineerCHIMAN D PATEL
Chartered AccountantSANTOSH NAMDEV KASAR
PartnerRole in project
ASHTVINAYAK CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Jan 2025

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 MAYURESH.pdf3 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 MAYURESH.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 30062023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31032023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30062023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30062023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30092023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31032023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 31032023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 30092023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30062023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31032023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ENGINEER CERTIFICATE 30092023.pdf20 Oct 2023
Other - LegalFile: ARCHITECT CERTIFICATE 30062023.pdf20 Oct 2023
Other - FinanceFile: ENGINEER CERTIFICATE 30062023.pdf20 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPETION CERTICICATE MAYURESHWAR PARK.pdf5 Oct 2023
Other - TechnicalFile: INTIMATION CERTIFICATE.pdf20 Feb 2023
Other - TechnicalFile: LAYOUT PLAN.pdf15 Feb 2023
Other - TechnicalFile: PLINTH COMPLETION FORM1 FORM2 AND FORM D .pdf14 Feb 2023
Building plan approvalFile: BUILDING NO 1.pdf25 Jan 2023
Building plan approvalFile: BUILDING NO 2.pdf25 Jan 2023
Building plan approvalFile: LAYOUT PLAN.pdf25 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 1.pdf25 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 2.pdf25 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT PLAN.pdf25 Jan 2023
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE.pdf25 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECT CERTIFICATE.pdf25 Jan 2023
Other - TechnicalFile: AFIDAVIT.pdf25 Jan 2023
Other - TechnicalFile: DECLARATION.pdf25 Jan 2023
Other - TechnicalFile: RECONSILATION STATEMENT.pdf25 Jan 2023
Other - TechnicalFile: RECONSILATION STATEMENT.pdf25 Jan 2023
Details of encumbrances concerned to FinanceFile: Debtor Based Search.pdf18 Jan 2023
Details of encumbrances concerned to FinanceFile: Asset Based Search.pdf18 Jan 2023
Details of encumbrances concerned to LegalFile: Debtor Based Search.pdf18 Jan 2023
Details of encumbrances concerned to LegalFile: Asset Based Search.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A 19012023.pdf18 Jan 2023
Proforma of Agreement for saleFile: AGREMENT FOR SALE.pdf18 Jan 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TABLE C.pdf28 Dec 2022
Declaration about Commencement CertificateFile: FORM D.pdf15 Dec 2022
Declaration in FORM BFile: AFFIDAVIT.pdf15 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT.pdf15 Dec 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC COMPLETION.pdf23 Nov 2022
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CERTIFICATE.pdf22 Oct 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CERTIFICATE.pdf22 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC COMPLETION.pdf22 Oct 2022
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT.pdf17 Oct 2022
Building plan approvalFile: APPROVAL DECLARATION.pdf11 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: APPROVAL DECLARATION.pdf11 Oct 2022
CERSAI detailsFile: ENCUMBRANCES CERTIFICATE.pdf11 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf11 Oct 2022
Layout approvalFile: LAYOUT.pdf26 Aug 2022
Building plan approvalFile: APPROVAL PLAN BUILDING 1.pdf26 Aug 2022
Building plan approvalFile: APPROVAL PLAN BUILDING 2.pdf26 Aug 2022
PAN CardFile: ASHATAVINAYAK CONSTRUCTION PAN.pdf26 Aug 2022
Copy of the legal title reportFile: TITLE SEARCH REPORT.pdf26 Aug 2022
Details of encumbrances concerned to FinanceFile: CERSAI 1.pdf26 Aug 2022
Details of encumbrances concerned to LegalFile: CERSAI CERTIFICATE.pdf26 Aug 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf26 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: APPROVAL PLAN BUILDING 1.pdf26 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: APPROVAL PLAN BUILDING 2.pdf26 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf26 Aug 2022
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE.pdf26 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE NEW.pdf26 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf26 Aug 2022
CERSAI detailsFile: CERSAI 1.pdf26 Aug 2022
CERSAI detailsFile: CERSAI 2.pdf26 Aug 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf26 Aug 2022
Status of ConveyanceFile: PLOT AGREEMENT.pdf26 Aug 2022
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER.pdf26 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SIDDHIVINAYAK PARKGUT NO.125 PLOT NO.1 PALSE TAL AND DIST NASHIK16CompletedJan 2023Sep 2021

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAYURESHWAR PARK AND ROW HOUSES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALSE4,100+ in Nashik

Builder: ASHTVINAYAK CONSTRUCTION

ASHTVINAYAK CONSTRUCTION has 2 registrations on MahaRERA, including SIDDHIVINAYAK PARK and MAYURESHWAR PARK AND ROW HOUSES. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if MAYURESHWAR PARK AND ROW HOUSES is delayed beyond 31 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAYURESHWAR PARK AND ROW HOUSES?

The registered promoter entity is ASHTVINAYAK CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAYURESHWAR PARK AND ROW HOUSES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAYURESHWAR PARK AND ROW HOUSES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAYURESHWAR PARK AND ROW HOUSES?

The professionals named in the filing: Architect: GAURAV BADWE; Engineer: CHIMAN D PATEL; Chartered Accountant: SANTOSH NAMDEV KASAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAYURESHWAR PARK AND ROW HOUSES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAYURESHWAR PARK AND ROW HOUSES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAYURESHWAR PARK AND ROW HOUSES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.