Home / Browse projects / Nashik, Maharashtra / RENUKA ESTATE PHASE 1
RENUKA ESTATE PHASE 1
RG-MH-70104 · RERA P51600016228 · Last updated on MahaRERA portal: 15 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 91 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RENUKA ESTATE PHASE 1 is a Others project by RAJEE INFRASTRUCTURE in Nashik, Maharashtra, registered with MahaRERA as P51600016228 on 25 Apr 2018. Possession is promised by 31 Dec 2028. The completion date has moved by 91 months from the original filing. 21 of the 120 units on this registration are recorded sold or booked, and 5 of 33 construction stages are filed complete.
At a glance
Project
- NameRENUKA ESTATE PHASE 1
- TypeOthers
- Location
- Nasik Pune Higway
- Shinde
- Nashik
- 422102
- Pincode422102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600016228
- ReraGenie IDRG-MH-70104
Builder
- NameRAJEE INFRASTRUCTURE
- Entity typePartnership
- PartnersVINOD NATHABHAI MORI, KETANBHAI AMRUTLAL JOBALIA, DUSHYANT SHARAD SALVE, NIKET SATISH PARIKH
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Apr 2018
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 1 May 2021)
- Buildings3 building records
- Documents filed139 files
Current status
Figures as on 15 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 6 | 5 | 32 | 8 | 40 |
| WING B | NA | 6 | 5 | 32 | 8 | 40 |
| WING C | NA | 6 | 5 | 32 | 8 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.
WING A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING C77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed33
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 11 | 11 |
| WING B | 11 | 11 |
| WING C | 11 | 11 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Yashoda Laxman Kakad & others 2 | Shinde | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 3.00 cr | - |
| WING B | NA | Rs 3.00 cr | - |
| WING C | NA | Rs 3.00 cr | Rs 2.37 cr |
| - | NA | Rs 48.76 lakh | - |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anup Mishrikotkar |
| Architect | Anup C Jain |
| Engineer | Prashant Bachhav |
| Engineer | Suyog pandey and associates |
| Engineer | Suyog Sanjay Pande |
| Chartered Accountant | Haresh Mehta |
| Chartered Accountant | RSPH & Associates |
| Chartered Accountant | P N Sabadra & Associates |
| Chartered Accountant | Pratik D. Jain & Associates |
| Partner | Role in project |
|---|---|
| RAJEE INFRASTRUCTURE | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNo Unit / Property sold till date.
Reason as filed by the promoterDue to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis
Reason as filed by the promotera) As the entire country including Nashik District were under a total lock-down; and the Government of India as well as the Government of Maharashtra had announced a slew of measures including “work from home” and “social distancing” to curb the spread of the COVID-19. In view of the curbs and measures imposed by the Governments, we stopped work till such time as the said lockdowns, curbs and measures were relaxed by the respective Governments. b) Inspite of best efforts, the said project was adversely affected due to unprecedented COVID-19 Pandemic which lasted for more than 2 years and are s
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed139
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AR - March 26 _compressed.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: ER - March 26 .pdf | 15 May 2026 |
| Withdrawal Update Form 3File: 1-CA Certificate-March-26 final.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: AR - June 25 merged .pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: AR - June 25 merged .pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: AR - Sept 25 - Merged .pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: AR - Dec 25 merged .pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: ER - June 25_11zon.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: ER - June 25_11zon.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: ER - September 25_compressed.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: ER - Dec 25_11zon.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: Rajee Infra CA Certificate Mar'23.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: CA - June 25 Final.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: CA - SEPTEMBER 25-Final.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: CA - DECEMBER 25_11zon_page-0001-final.pdf | 23 Mar 2026 |
| Form 5 (FY 2023-2024)File: Form 5.pdf | 17 Mar 2026 |
| Form 5 (FY 2022-2023)File: Rajee Infrastructure 22-23 Final.pdf | 17 Mar 2026 |
| Form 5 (FY 2021-2022)File: Rajiee RERA Audit _21-22_signed.pdf | 17 Mar 2026 |
| Form 1File: Architect Certificate-June-24.pdf | 16 Mar 2026 |
| Form 2File: Engineer Certificate-June-24.pdf | 16 Mar 2026 |
| Form 3File: CA Cert Sign copy June 24.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 16 Mar 2026 |
| Form 1File: Architech Certificate.pdf | 16 Mar 2026 |
| Form 2File: Engineer Certificate.pdf | 16 Mar 2026 |
| Form 3File: CA Cert Sing Copy Sep 24.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: disclosure.pdf | 16 Mar 2026 |
| Form 1File: AR March 24.pdf | 16 Mar 2026 |
| Form 2File: ER March 24.pdf | 16 Mar 2026 |
| Form 3File: CA Cert Mar 24.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajee Infrastructure_page-0001.pdf | 16 Mar 2026 |
| Form 1File: AR Dec 23.pdf | 16 Mar 2026 |
| Form 2File: ER Dec 23.pdf | 16 Mar 2026 |
| Form 3File: CA Cert Dec 23.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Dec 2023 final.pdf | 16 Mar 2026 |
| Form 1File: AR Sept 23.pdf | 16 Mar 2026 |
| Form 2File: ER Sept 23.pdf | 16 Mar 2026 |
| Form 3File: CA Cert Sep 23.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sep 2023 final.pdf | 16 Mar 2026 |
| Form 1File: AR June 23.pdf | 16 Mar 2026 |
| Form 2File: ER June 23.pdf | 16 Mar 2026 |
| Form 3File: CA Cert June 23.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: june 2023 final.pdf | 16 Mar 2026 |
| Form 1File: Rajee Infra Ar March 23.pdf | 16 Mar 2026 |
| Form 2File: Rajee Infra Er March 23.pdf | 16 Mar 2026 |
| Form 3File: CA Certificate Mar23.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: march 2023 final.pdf | 16 Mar 2026 |
| Form 5 (FY 2024-2025)File: RERA Audit Report 24-25.pdf | 27 Feb 2026 |
| Form 1File: AR - March 25 .pdf | 18 Feb 2026 |
| Form 2File: Engineer Certificate Mar 25.pdf | 18 Feb 2026 |
| Form 3File: CA - March 25.pdf | 18 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory March-25.pdf | 18 Feb 2026 |
| Form 1File: Architect Cerificate Dec 2024.pdf | 17 Feb 2026 |
| Form 2File: Engineer Certificate Dec 24.pdf | 17 Feb 2026 |
| Form 3File: CA - Dec 24 final 1.pdf | 17 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory December 2024.pdf | 17 Feb 2026 |
| Declaration in FORM BFile: Form B_compressed.pdf | 17 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR June 24.pdf | 16 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR September 24.pdf | 16 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-June-24.pdf | 29 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: CA Cert Sign copy.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: CA Cert Sing Copy Sep 24.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: CA Cert Sign copy June 24.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: CA Certificate June-24.pdf | 29 Nov 2024 |
| Certificates of CA (Form 5)File: CA Certificate June-24.pdf | 29 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-June-24.pdf | 29 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 29 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 29 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure.pdf | 29 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SKMBT_C28024111317030.pdf | 15 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR June 23.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Sept 23.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dec 23.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR March 24.pdf | 26 Oct 2024 |
| Certificates of CA (Form 3)File: CA Cert Mar 24.pdf | 26 Oct 2024 |
| Certificates of CA (Form 3)File: CA Cert Dec 23.pdf | 26 Oct 2024 |
| Certificates of CA (Form 3)File: CA Cert Sep 23.pdf | 26 Oct 2024 |
| Certificates of CA (Form 3)File: CA Cert June 23.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER June 23.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Sept 23.pdf | 26 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 139 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RENUKA ESTATE PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shinde4,100+ in Nashik
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
THE NEXON CITY
RAJENDRA MADHAV SHELAR
Shree Gajanan Industrial Layout
Girish Sudhakar Thakur
Crystal Court Commercial Complex
SHREEKAR CONSTRUCTION
MAULI PRIDE
DEEPAK BABAN CHAUDHARI
SHIVNEEL HEIGHTS
KRUPASINDHU CONSTRUCTIONS
Vrindavan Park
Sahara Buildcon
See every Nashik project, with the district possession charts
Builder: RAJEE INFRASTRUCTURE
RAJEE INFRASTRUCTURE has 1 registration on MahaRERA, including RENUKA ESTATE PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if RENUKA ESTATE PHASE 1 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RENUKA ESTATE PHASE 1?
The registered promoter entity is RAJEE INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RENUKA ESTATE PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RENUKA ESTATE PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RENUKA ESTATE PHASE 1?
The professionals named in the filing: Architect: Anup Mishrikotkar; Architect: Anup C Jain; Engineer: Prashant Bachhav; Engineer: Suyog pandey and associates; Engineer: Suyog Sanjay Pande; Chartered Accountant: Haresh Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RENUKA ESTATE PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback