Home / Browse projects / Nashik, Maharashtra / RENUKA ESTATE PHASE 1

Registered No litigation declared Others project

RENUKA ESTATE PHASE 1

By RAJEE INFRASTRUCTURE

RG-MH-70104 · RERA P51600016228 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 91 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 91 months from the original
5 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
99 of 120Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

RENUKA ESTATE PHASE 1 is a Others project by RAJEE INFRASTRUCTURE in Nashik, Maharashtra, registered with MahaRERA as P51600016228 on 25 Apr 2018. Possession is promised by 31 Dec 2028. The completion date has moved by 91 months from the original filing. 21 of the 120 units on this registration are recorded sold or booked, and 5 of 33 construction stages are filed complete.

At a glance

Project

  • NameRENUKA ESTATE PHASE 1
  • TypeOthers
  • Location
    • Nasik Pune Higway
    • Shinde
    • Nashik
    • 422102
  • Pincode422102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600016228
  • ReraGenie IDRG-MH-70104

Builder

  • NameRAJEE INFRASTRUCTURE
  • Entity typePartnership
  • PartnersVINOD NATHABHAI MORI, KETANBHAI AMRUTLAL JOBALIA, DUSHYANT SHARAD SALVE, NIKET SATISH PARIKH

Key dates

this monthRegisteredApr 2018First promiseMay 2021Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Apr 2018
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 1 May 2021)
  • Buildings3 building records
  • Documents filed139 files

Current status

18%21 of 120 units booked
25.0%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA6532840
WING BNA6532840
WING CNA6532840

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered33
BuildingClosed/CoveredTotal
WING A1111
WING B1111
WING C1111

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area726 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Feb 2026
LandownerVillageDistrict
Yashoda Laxman Kakad & others 2ShindeNashik

Approvals and building plan

Sanctioning authorityNashik Metropolitan Region Development Authority, Nashik
Permissible FSI1222.31
Proposed, not sanctioned1,222 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch265,Ghanashyam Bhuvan, JSS Marg,Thakurdwar, Girgaum, Mumbai, Maharashtra
Estimated costRs 9.49 cr
Cost incurredRs 2.37 cr
Work done24.96%
BuildingWingEstimatedIncurred
WING ANARs 3.00 cr-
WING BNARs 3.00 cr-
WING CNARs 3.00 crRs 2.37 cr
-NARs 48.76 lakh-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnup Mishrikotkar
ArchitectAnup C Jain
EngineerPrashant Bachhav
EngineerSuyog pandey and associates
EngineerSuyog Sanjay Pande
Chartered AccountantHaresh Mehta
Chartered AccountantRSPH & Associates
Chartered AccountantP N Sabadra & Associates
Chartered AccountantPratik D. Jain & Associates
PartnerRole in project
RAJEE INFRASTRUCTURE-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600001752May 2021 → Apr 2022

Reason as filed by the promoterNo Unit / Property sold till date.

EXT51600017379May 2021 → Mar 2024

Reason as filed by the promoterDue to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis

EXT51600025547May 2021 → Dec 2028

Reason as filed by the promotera) As the entire country including Nashik District were under a total lock-down; and the Government of India as well as the Government of Maharashtra had announced a slew of measures including “work from home” and “social distancing” to curb the spread of the COVID-19. In view of the curbs and measures imposed by the Governments, we stopped work till such time as the said lockdowns, curbs and measures were relaxed by the respective Governments. b) Inspite of best efforts, the said project was adversely affected due to unprecedented COVID-19 Pandemic which lasted for more than 2 years and are s

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AR - March 26 _compressed.pdf15 May 2026
Withdrawal Update Form 2File: ER - March 26 .pdf15 May 2026
Withdrawal Update Form 3File: 1-CA Certificate-March-26 final.pdf15 May 2026
Withdrawal Update Form 1File: AR - June 25 merged .pdf23 Mar 2026
Withdrawal Update Form 1File: AR - June 25 merged .pdf23 Mar 2026
Withdrawal Update Form 1File: AR - Sept 25 - Merged .pdf23 Mar 2026
Withdrawal Update Form 1File: AR - Dec 25 merged .pdf23 Mar 2026
Withdrawal Update Form 2File: ER - June 25_11zon.pdf23 Mar 2026
Withdrawal Update Form 2File: ER - June 25_11zon.pdf23 Mar 2026
Withdrawal Update Form 2File: ER - September 25_compressed.pdf23 Mar 2026
Withdrawal Update Form 2File: ER - Dec 25_11zon.pdf23 Mar 2026
Withdrawal Update Form 3File: Rajee Infra CA Certificate Mar'23.pdf23 Mar 2026
Withdrawal Update Form 3File: CA - June 25 Final.pdf23 Mar 2026
Withdrawal Update Form 3File: CA - SEPTEMBER 25-Final.pdf23 Mar 2026
Withdrawal Update Form 3File: CA - DECEMBER 25_11zon_page-0001-final.pdf23 Mar 2026
Form 5 (FY 2023-2024)File: Form 5.pdf17 Mar 2026
Form 5 (FY 2022-2023)File: Rajee Infrastructure 22-23 Final.pdf17 Mar 2026
Form 5 (FY 2021-2022)File: Rajiee RERA Audit _21-22_signed.pdf17 Mar 2026
Form 1File: Architect Certificate-June-24.pdf16 Mar 2026
Form 2File: Engineer Certificate-June-24.pdf16 Mar 2026
Form 3File: CA Cert Sign copy June 24.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf16 Mar 2026
Form 1File: Architech Certificate.pdf16 Mar 2026
Form 2File: Engineer Certificate.pdf16 Mar 2026
Form 3File: CA Cert Sing Copy Sep 24.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: disclosure.pdf16 Mar 2026
Form 1File: AR March 24.pdf16 Mar 2026
Form 2File: ER March 24.pdf16 Mar 2026
Form 3File: CA Cert Mar 24.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajee Infrastructure_page-0001.pdf16 Mar 2026
Form 1File: AR Dec 23.pdf16 Mar 2026
Form 2File: ER Dec 23.pdf16 Mar 2026
Form 3File: CA Cert Dec 23.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: Dec 2023 final.pdf16 Mar 2026
Form 1File: AR Sept 23.pdf16 Mar 2026
Form 2File: ER Sept 23.pdf16 Mar 2026
Form 3File: CA Cert Sep 23.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sep 2023 final.pdf16 Mar 2026
Form 1File: AR June 23.pdf16 Mar 2026
Form 2File: ER June 23.pdf16 Mar 2026
Form 3File: CA Cert June 23.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: june 2023 final.pdf16 Mar 2026
Form 1File: Rajee Infra Ar March 23.pdf16 Mar 2026
Form 2File: Rajee Infra Er March 23.pdf16 Mar 2026
Form 3File: CA Certificate Mar23.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: march 2023 final.pdf16 Mar 2026
Form 5 (FY 2024-2025)File: RERA Audit Report 24-25.pdf27 Feb 2026
Form 1File: AR - March 25 .pdf18 Feb 2026
Form 2File: Engineer Certificate Mar 25.pdf18 Feb 2026
Form 3File: CA - March 25.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory March-25.pdf18 Feb 2026
Form 1File: Architect Cerificate Dec 2024.pdf17 Feb 2026
Form 2File: Engineer Certificate Dec 24.pdf17 Feb 2026
Form 3File: CA - Dec 24 final 1.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory December 2024.pdf17 Feb 2026
Declaration in FORM BFile: Form B_compressed.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR June 24.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR September 24.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-June-24.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf29 Nov 2024
Certificates of CA (Form 3)File: CA Cert Sign copy.pdf29 Nov 2024
Certificates of CA (Form 3)File: CA Cert Sing Copy Sep 24.pdf29 Nov 2024
Certificates of CA (Form 3)File: CA Cert Sign copy June 24.pdf29 Nov 2024
Certificates of CA (Form 3)File: CA Certificate June-24.pdf29 Nov 2024
Certificates of CA (Form 5)File: CA Certificate June-24.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-June-24.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: disclosure.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SKMBT_C28024111317030.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR June 23.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Sept 23.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dec 23.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR March 24.pdf26 Oct 2024
Certificates of CA (Form 3)File: CA Cert Mar 24.pdf26 Oct 2024
Certificates of CA (Form 3)File: CA Cert Dec 23.pdf26 Oct 2024
Certificates of CA (Form 3)File: CA Cert Sep 23.pdf26 Oct 2024
Certificates of CA (Form 3)File: CA Cert June 23.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER June 23.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Sept 23.pdf26 Oct 2024

How this compares with Nashik

18%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 91 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RENUKA ESTATE PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shinde4,100+ in Nashik

2 kmRENUKA ESTATE PHASE 1Completed 1Lapsed / revoked 1Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: RAJEE INFRASTRUCTURE

RAJEE INFRASTRUCTURE has 1 registration on MahaRERA, including RENUKA ESTATE PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if RENUKA ESTATE PHASE 1 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RENUKA ESTATE PHASE 1?

The registered promoter entity is RAJEE INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RENUKA ESTATE PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RENUKA ESTATE PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RENUKA ESTATE PHASE 1?

The professionals named in the filing: Architect: Anup Mishrikotkar; Architect: Anup C Jain; Engineer: Prashant Bachhav; Engineer: Suyog pandey and associates; Engineer: Suyog Sanjay Pande; Chartered Accountant: Haresh Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RENUKA ESTATE PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RENUKA ESTATE PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RENUKA ESTATE PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.