Home / Browse projects / Pune, Maharashtra / MAYURESHWAR ICON

Completed No litigation declared Residential / Group Housing project

MAYURESHWAR ICON

By MAYURESHWAR REALITY AND DEVELOPERS

RG-MH-71003 · RERA P52100048801 · Last updated on MahaRERA portal: 21 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2026Possession promisedregistration recorded completed
17 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

MAYURESHWAR ICON is a Residential / Group Housing project by MAYURESHWAR REALITY AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100048801 on 17 Jan 2023. The registration is recorded completed; possession was promised by 1 Sep 2026.

At a glance

Project

  • NameMAYURESHWAR ICON
  • TypeResidential / Group Housing
  • Location
    • JALOCHI ROAD
    • BARAMATI
    • Baramati (M Cl)
    • Pune
    • 413102
  • Pincode413102
  • RERA no.P52100048801
  • ReraGenie IDRG-MH-71003

Builder

  • NameMAYURESHWAR REALITY AND DEVELOPERS
  • Entity typePartnership
  • PartnerURMILA MIRGANE

Key dates

this monthRegisteredJan 2023PromisedSep 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Jan 2023
  • Promised completion1 Sep 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAYURESHWAR ICON ANA60000
MAYURESHWAR ICON BNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

MAYURESHWAR ICON A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MAYURESHWAR ICON B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered77
BuildingClosed/CoveredTotal
MAYURESHWAR ICON A4848
MAYURESHWAR ICON B2929

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,250 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
BABAN SHANKAR BODAKEAkluj (CT)Solapur
MAYURESHWAR REALITY AND DEVELOPERSBaramati (M Cl)Pune
HARIPRASAD JANARDHAN THORATAkluj (CT)Solapur

Approvals and building plan

Permissible FSI2807.21
Proposed, not sanctioned2,807 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBARAMATI MIDC

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANDAR SHRIKANT SIKACHI
EngineerSHASHIKANT CHANDRAKANT CHOUDHAR
Chartered AccountantCA GAUTAM D SHARMA
PartnerRole in project
MAYURESHWAR REALITY AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Mar 2025

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineers Certificate March 2024.pdf21 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Certificate BCC Mayureshwar Icon A.pdf17 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Mar 24 Signed.pdf17 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Mar 24.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Dec 24.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA March 2024 signed.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA June 2024 Signed.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA September 2024 Signed.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA December 2024 Signed.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer March 2024.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer June 2024.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Sept 2024.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Dec 2024.pdf15 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold unsold disclosure Icon Dec 2024 new_signed.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate May Icon Dec 2024.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold unsold disclosure Icon Dec 2024.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 23_signed.pdf27 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 23_signed.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 23_signed.pdf23 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Form 3 Dec 23_signed.pdf23 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mayureshwar Icon.pdf5 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Mayureshwar Icon.pdf5 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Jul 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (1).pdf6 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf6 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf6 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf6 Jan 2023
Other - TechnicalFile: 1 Other - Technical.pdf6 Jan 2023
Other - LegalFile: Dec regarding address.pdf1 Dec 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf27 Nov 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Lega.pdf27 Nov 2022
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf27 Nov 2022
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Lega.pdf27 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seperate Bank.pdf27 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf27 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to agreement to sale.pdf27 Nov 2022
Other - LegalFile: Power Of Attorny.pdf27 Nov 2022
Other - LegalFile: DA PA 1.pdf27 Nov 2022
Other - LegalFile: DA PA 2.pdf27 Nov 2022
Other - LegalFile: DA PA 3.pdf27 Nov 2022
Other - LegalFile: DA PA 4.pdf27 Nov 2022
Other - LegalFile: DA PA 5.pdf27 Nov 2022
Other - LegalFile: DA PA 6.pdf27 Nov 2022
Layout approvalFile: Copy of Layout Approval -Mayureshwar Icon A.pdf26 Nov 2022
Layout approvalFile: Copy of Layout Approval-Mayureshwar Icon B.pdf26 Nov 2022
Building plan approvalFile: Building plan Approval -Mayureshwar Icon A.pdf26 Nov 2022
Building plan approvalFile: Building plan Approval-Mayureshwar Icon B.pdf26 Nov 2022
PAN CardFile: Pan Card.pdf26 Nov 2022
Copy of the legal title reportFile: Legal Title Report.pdf26 Nov 2022
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval -Mayureshwar Icon A.pdf26 Nov 2022
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval-Mayureshwar Icon B.pdf26 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Building plan Approval -Mayureshwar Icon A.pdf26 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Building plan Approval-Mayureshwar Icon B.pdf26 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate-Mayureshwar ICON A.pdf26 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate- Mayureshwar ICON B.pdf26 Nov 2022
Declaration in FORM BFile: Declaration in Form B Promotors.pdf26 Nov 2022
Declaration in FORM BFile: Declaration in Form B Co- Promotors.pdf26 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf26 Nov 2022
CERSAI detailsFile: CERSAI.pdf26 Nov 2022
Proforma of Allotment letterFile: Proforma of Allotment letter 1.pdf26 Nov 2022
Proforma of Allotment letterFile: Proforma of Allotment letter 2.pdf26 Nov 2022
Proforma of Allotment letterFile: Proforma of Allotment letter 3.pdf26 Nov 2022
Proforma of Agreement for saleFile: Agreement For Sale.pdf26 Nov 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAYURESHWAR ICON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BARAMATI13,700+ in Pune

Builder: MAYURESHWAR REALITY AND DEVELOPERS

MAYURESHWAR REALITY AND DEVELOPERS has 1 registration on MahaRERA, including MAYURESHWAR ICON. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MAYURESHWAR ICON is delayed beyond 1 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAYURESHWAR ICON?

The registered promoter entity is MAYURESHWAR REALITY AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAYURESHWAR ICON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAYURESHWAR ICON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAYURESHWAR ICON?

The professionals named in the filing: Architect: MANDAR SHRIKANT SIKACHI; Engineer: SHASHIKANT CHANDRAKANT CHOUDHAR; Chartered Accountant: CA GAUTAM D SHARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAYURESHWAR ICON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAYURESHWAR ICON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAYURESHWAR ICON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.