ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Matoshri Enclave

Registered No litigation declared Residential / Group Housing project

Matoshri Enclave

By vishal gajanan kenjale

RG-MH-04727 · RERA P52100024001 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
9 of 14Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

Matoshri Enclave is a Residential / Group Housing project by vishal gajanan kenjale in Pune, Maharashtra, registered with MahaRERA as P52100024001 on 14 Jan 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 5 of the 14 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMatoshri Enclave
  • TypeResidential / Group Housing
  • Location
    • katraj
    • katraj kondhwa road
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024001
  • ReraGenie IDRG-MH-04727

Builder

  • Namevishal gajanan kenjale
  • Entity typeIndividual

Key dates

this monthRegisteredJan 2020First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jan 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed115 files

Current status

36%5 of 14 units booked
5.0%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
matoshri enclaveNA8814014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

matoshri enclave: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered5
Open Space3

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area777 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jan 2026
LandownerVillageDistrict
CHANDRAKANT YASHWANT LOKHANDEPune (M Corp.)Pune
ANURADHA CHANDRAKANT LOKHANDEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI601.91
Proposed, not sanctioned602 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKADAM PLAZA KATRAJ
Estimated costRs 2.38 cr
Cost incurredRs 11.90 lakh
Work done5.0%
BuildingWingEstimatedIncurred
matoshri enclaveNARs 1.98 crRs 9.90 lakh
-NARs 40.00 lakhRs 2.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectsumit anil nigade
EngineerKADU DIPAK
EngineerDipak kadu
Chartered Accountantbahirat patil & co
Chartered AccountantDCRK ASSOCIATES
Chartered AccountantSHANU AGARWAL
PartnerRole in project
vishal gajanan kenjale-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12012619413Dec 2024 → Dec 2026

Reason as filed by the promoter1. Unforeseen Accident: The primary cause of the accident was a mechanical failure within the heavy-duty hoisting system, classified as a Force Majeure event. This sudden structural collapse was beyond human control and happened inspite of regular maintenance foresight; resulting in critical injuries to personnel and immediate site stabilization requirements. 2. Labor Safety & Medical Compliance: Following the incident, all construction activities were suspended to prioritize worker welfare. It was legally and ethically mandatory to conduct comprehensive medical check-ups, provide emergency tr

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12605218Sunita Ramesh Bodhevishal gajanan kenjale16/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q4 2025-26.pdf13 Aug 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf13 Aug 2026
Withdrawal Update Form 3File: Kenjale Form 3 (2).pdf13 Aug 2026
Form 1File: Q4 2024-25.pdf18 Apr 2026
Form 2File: Q4 2024-25.pdf18 Apr 2026
Form 3File: Q4 2024- 25.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISLOSURE.pdf18 Apr 2026
Withdrawal Update Form 1File: Q1 2025-26.pdf18 Apr 2026
Withdrawal Update Form 1File: Q1 2025-26.pdf18 Apr 2026
Withdrawal Update Form 1File: Q3 2025-26.pdf18 Apr 2026
Withdrawal Update Form 1File: Q4 2025-26.pdf18 Apr 2026
Withdrawal Update Form 1File: Q4 2025-26.pdf18 Apr 2026
Withdrawal Update Form 2File: Q1 2025-26.pdf18 Apr 2026
Withdrawal Update Form 2File: Q2 2025-26.pdf18 Apr 2026
Withdrawal Update Form 2File: Q3 2025-26.pdf18 Apr 2026
Withdrawal Update Form 2File: Q4 2025-26.pdf18 Apr 2026
Withdrawal Update Form 2File: Q4 2025-26.pdf18 Apr 2026
Withdrawal Update Form 3File: Q1 2025-26.pdf18 Apr 2026
Withdrawal Update Form 3File: Q2 2025-26.pdf18 Apr 2026
Withdrawal Update Form 3File: Kenjale Form 3 (1).pdf18 Apr 2026
Withdrawal Update Form 3File: Kenjale Form 3 (2).pdf18 Apr 2026
Withdrawal Update Form 3File: Kenjale Form 3 (2).pdf18 Apr 2026
Form 1File: Form 1.pdf23 Dec 2025
Form 2File: form 2.pdf23 Dec 2025
Form 3File: FORM 3.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf23 Dec 2025
Form 1File: form 1.pdf23 Dec 2025
Form 2File: form 2.pdf23 Dec 2025
Form 3File: FORM 3.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf23 Dec 2025
Form 1File: Form 1 31 12 20.pdf23 Dec 2025
Form 2File: form 2 31 12 20.pdf23 Dec 2025
Form 3File: FORM 3 Q3 2020.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf23 Dec 2025
Form 1File: Form 1 Q1 JAN 20 TO MAR 20.pdf23 Dec 2025
Form 2File: Form 2.pdf23 Dec 2025
Form 3File: FORM 3.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf23 Dec 2025
Form 1File: F1 30-06-21.pdf23 Dec 2025
Form 2File: ENG june 21.pdf23 Dec 2025
Form 3File: Form 3.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: june 21.pdf23 Dec 2025
Form 1File: F1 30 09 21.pdf23 Dec 2025
Form 2File: ENG sep 21.pdf23 Dec 2025
Form 3File: Form 3.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: sep 21.pdf23 Dec 2025
Form 1File: F1 31 12 21.pdf23 Dec 2025
Form 2File: ENG dec 21.pdf23 Dec 2025
Form 3File: Form 3.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: dec 21.pdf23 Dec 2025
Form 1File: F1 31 03 22.pdf23 Dec 2025
Form 2File: ENG mar 22.pdf23 Dec 2025
Form 3File: Form 3.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: mar 22.pdf23 Dec 2025
Form 1File: Form 1 Q4 OCT 22 TO DEC 22.pdf23 Dec 2025
Form 2File: Form 2 2022.pdf23 Dec 2025
Form 3File: Form 3.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: dec 22.pdf23 Dec 2025
Form 1File: Form 1 Q2 OCT 24 TO DEC 24.pdf23 Dec 2025
Form 2File: form 2 2024 (1).pdf23 Dec 2025
Form 3File: dec 24 Form 3.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: dec 24.pdf23 Dec 2025
Form 1File: Form 1 Q1 JAN 21 TO MAR 21.pdf17 Dec 2025
Form 2File: ENG mar 21.pdf17 Dec 2025
Form 3File: Form 3.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: mar 21.pdf17 Dec 2025
Form 1File: Form 1 Q2 APR 22 TO JUN 22.pdf17 Dec 2025
Form 2File: ENG june 22.pdf17 Dec 2025
Form 3File: Form 3.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: june 22.pdf17 Dec 2025
Form 1File: Form 1 Q3 JULY 22 TO SEPT 22.pdf17 Dec 2025
Form 2File: ENG sep 22.pdf17 Dec 2025
Form 3File: Form 3.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: sep 22.pdf17 Dec 2025
Form 1File: Form 1 Q1 JAN 23 TO MAR 23.pdf17 Dec 2025
Form 2File: Engineers Certificate mar 23.pdf17 Dec 2025
Form 3File: Form 3.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: mar 23.pdf17 Dec 2025
Form 1File: Form 1 Q2 MAR 23 TO JUN 23.pdf17 Dec 2025
Form 2File: Engineers Certificate june 23.pdf17 Dec 2025

How this compares with Pune

36%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Matoshri Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near katraj kondhwa road13,700+ in Pune

2 kmMatoshri EnclaveCompleted 68Lapsed / revoked 33Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 151 registered projects within 2 km.

Builder: vishal gajanan kenjale

vishal gajanan kenjale has 1 registration on MahaRERA, including Matoshri Enclave. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Matoshri Enclave is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Matoshri Enclave?

The registered promoter entity is vishal gajanan kenjale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Matoshri Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Matoshri Enclave?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Matoshri Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Matoshri Enclave?

The professionals named in the filing: Architect: sumit anil nigade; Engineer: KADU DIPAK; Engineer: Dipak kadu; Chartered Accountant: bahirat patil & co; Chartered Accountant: DCRK ASSOCIATES; Chartered Accountant: SHANU AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Matoshri Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Matoshri Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Matoshri Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.