Home / Browse projects / Mumbai Suburban, Maharashtra / MASS ZAINAB HEIGHTS

Registered No litigation declared Residential / Group Housing project

MASS ZAINAB HEIGHTS

By MASS ZIA DEVELOPMENT CORPORATION

RG-MH-46428 · RERA P51800046413 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 19 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 19 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 98%
23 of 48Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

MASS ZAINAB HEIGHTS is a Residential / Group Housing project by MASS ZIA DEVELOPMENT CORPORATION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046413 on 22 Jun 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 19 months from the original filing. 25 of the 48 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMASS ZAINAB HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • BEHRAM BAUG ROAD
    • JOGESHWARI
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046413
  • ReraGenie IDRG-MH-46428

Builder

  • NameMASS ZIA DEVELOPMENT CORPORATION
  • Entity typePartnership
  • GSTIN27ABRFM3434E1Z5
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMOHD ATAULLAH HAJI KHALIL ANSARI, ZAID ZIKRUREHMAN JAGRALA, IRSHAD ABDUL SAMAD MAKNOJIA
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2022First promiseMay 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 May 2025)
  • Buildings1 building record
  • Documents filed102 files

Current status

52%25 of 48 units booked
97.1%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MASS FATIMANA201842648

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 98%.

MASS FATIMA: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes71%
Solid Waste Management And DisposalYes71%
Water conservation /Rain water harvestingYes71%
Energy managemcntYes71%
Fire protection and fire safety requirementsYes71%
Electrical meter room, sub-station, receiving stationYes71%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area525 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SALIMABAD CHS LTDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI1164.0
Proposed, not sanctioned1,164 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANDHERI OM NIKETAN CO-OPERATIVE HOUSING SOCIETY LTD, 314 PALI RAM ROAD, MUMBAI - 400058
Estimated costRs 13.29 cr
Cost incurredRs 12.91 cr
Work done97.1%
BuildingWingEstimatedIncurred
MASS FATIMANARs 9.31 crRs 9.12 cr
-NARs 3.99 crRs 3.79 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectZEESHAN ANSARI
EngineerSAMEER JADEJA
Chartered AccountantSarfaraz Khan
Chartered AccountantM N J & Associates
PartnerRole in project
MASS ZIA DEVELOPMENT CORPORATION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12082502364May 2025 → Dec 2026

Reason as filed by the promoterThe extension is being seeked solely due to an external delay concerning the Permanent Transit Camp (PTC) transfer process. While we have an executed agreement with another project for the PTC transfer, their delayed completion has prevented us from finalizing the sale of our units to buyers.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503695Misbah Farheen ShaikhMASS ZIA DEVELOPMENT CORPORATION17/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Mass Zia-architect-311225.pdf9 May 2026
Withdrawal Update Form 1File: Mass Zia-architect-311225.pdf9 May 2026
Withdrawal Update Form 2File: Mass Zia Form2 311225.pdf9 May 2026
Withdrawal Update Form 2File: mass zia engineer Form 2 certificate Dec 25.pdf9 May 2026
Withdrawal Update Form 3File: Mass Zia Form3 311225 Signed New.pdf9 May 2026
Withdrawal Update Form 3File: Mass Zia Form3 311225 Signed New.pdf9 May 2026
Withdrawal Update Form 1File: Mass zia-architect-300925.pdf8 May 2026
Withdrawal Update Form 2File: Mass Zia-Form 2-300925.pdf8 May 2026
Withdrawal Update Form 3File: Mass Zia-Form3-300925 Signed.pdf8 May 2026
Withdrawal Update Form 1File: Mass zia-Form1-300625 final.pdf29 Sep 2025
Withdrawal Update Form 1File: Mass zia-Form1-300625 final.pdf29 Sep 2025
Withdrawal Update Form 2File: Mass Zia-Form2-300625 final.pdf29 Sep 2025
Withdrawal Update Form 2File: Mass Zia-Form2-300625 final.pdf29 Sep 2025
Withdrawal Update Form 3File: Mass Zia Certificate -Form 3.pdf29 Sep 2025
Withdrawal Update Form 3File: Mass zia-Form 3-300625 final.pdf29 Sep 2025
Form 1File: 30062022 form 1 Mass zia Architect Certificate.pdf29 Aug 2025
Form 2File: Engineer Certificate 30062022 MZDC-condensed.pdf29 Aug 2025
Form 3File: mass zia form 3-300622.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30062022 Mass Zia -sold inventory disclosure.pdf29 Aug 2025
Form 1File: mass zia architect certificate 30092022.pdf29 Aug 2025
Form 2File: Engineer Certificate 30092022 MZDC-condensed.pdf29 Aug 2025
Form 3File: MASS ZIA form 3-300922.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 30092022 Mass Zia -sold inventory disclosure1.pdf29 Aug 2025
Form 1File: 10 RERA Architect Certificate 31032025.pdf1 Aug 2025
Form 2File: 10 Rera Engineer Certificate 31032025 MZDC.pdf1 Aug 2025
Form 3File: MASSS ZIA-FORM-3-310325-Final Signed.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: 9 31-03-2025 Mass Zia -sold inventory disclosure.pdf1 Aug 2025
Form 2A (FY 2022-2023)File: Form 2A_FY 22-23- Signed.pdf31 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A_FY 23-24- Signed.pdf31 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A_FY 24-25- Signed.pdf31 Jul 2025
Form 5 (FY 2023-2024)File: Mass Zia Form 5 - 310324 -Revised- Signed_compressed.pdf31 Jul 2025
Form 1File: 1 31122022 form 1 Mass zia Architect Certificate.pdf17 Jul 2025
Form 2File: 1 Engineer Certificate - Mass Zia 311222.pdf17 Jul 2025
Form 3File: Mass Zia-Form -3 - certificate_.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: 1 Sold Unsold - Mass Zia 08012023.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: 1 31-03-2023 Mass Zia -sold inventory disclosure.pdf17 Jul 2025
Form 1File: 2 31032023 MASS ZIA ARCHITECT CERTIFICATE.pdf17 Jul 2025
Form 2File: 2 Mass zia engineer certificate 31-03-23.pdf17 Jul 2025
Form 3File: Mass Zia-form 3-310323-signed-Compressed.pdf17 Jul 2025
Form 3File: Form 3-300623 signed.pdf17 Jul 2025
Form 1File: 3 30062023 MASS ZIA ARCHITECT CERTIFICATE.pdf17 Jul 2025
Form 2File: 3 mass zia engineer certificate 30-06-23 _1_ revised.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: 2 30-06-2023 Mass Zia -sold inventory disclosure1.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: 3 30-09-2023 Mass Zia -sold inventory disclosure.pdf17 Jul 2025
Form 3File: Form 3-300923 signed.pdf17 Jul 2025
Form 1File: 4 30092023 MASS ZIA ARCHITECT CERTIFICATE.pdf17 Jul 2025
Form 2File: 4 mass zia engineer certificate 30-09-23_2_ revised.pdf17 Jul 2025
Form 1File: 5 31122023 MASS ZIA ARCHITECT CERTIFICATE.pdf17 Jul 2025
Form 2File: 5 mass zia engineer certificate 31-12-23.pdf17 Jul 2025
Form 3File: Mass Zia Certificate As On 31-12-2023-Final Signed-Compressed.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: 4 31-12-2023 Mass Zia -sold inventory disclosure.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: 5 31-03-2024 Mass Zia -sold inventory disclosure.pdf17 Jul 2025
Form 1File: 6 31032024 MASS ZIA ARCHITECT CERTIFICATE.pdf17 Jul 2025
Form 2File: 5. mass zia engineer certificate 31-03-24..pdf17 Jul 2025
Form 3File: Mass Zia Certificate As On 31-03-2024-Final Signed-Compressed.pdf17 Jul 2025
Form 1File: 7 MZDC Salimabad RERA Architect Certificate 30062024.pdf17 Jul 2025
Form 2File: 7 MZDC RERA Engineer Certificate 30062024.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: 6 30-06-2024 Mass Zia -sold inventory disclosure.pdf17 Jul 2025
Form 3File: Mass Zia Form 3 300624 Signed.pdf17 Jul 2025
Form 1File: 8 MZDC Salimabad RERA Architect Certificate 30092024.pdf17 Jul 2025
Form 2File: 8 MZDC RERA Engineer Certificate 30092024.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: 7 30-09-2024 Mass Zia -sold inventory disclosure.pdf17 Jul 2025
Form 3File: Mass Zia Form 3 300924 Signed.pdf17 Jul 2025
Form 3File: Mass zia Form 3 Dec 24-Signed Client-Compressed.pdf17 Jul 2025
Form 1File: 9 MZDC Salimabad RERA Architect Certificate 31122024.pdf17 Jul 2025
Form 2File: 9 MZDC RERA Engineer Certificate 31122024.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: 8 31-12-2024 Mass Zia -sold inventory disclosure.pdf17 Jul 2025
Form 5 (FY 2022-2023)File: Mass Zia Form 5 - 310323-Signed.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31032023 MASS ZIA ARCHITECT CERTIFICATE.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 30062023 MASS ZIA ARCHITECT CERTIFICATE.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 30092023 MASS ZIA ARCHITECT CERTIFICATE.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122022 form 1 Mass zia Architect Certificate.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Mass Zia-Form -3 - certificate 311222.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Mass Zia-form 3-310323-signed.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3-300623 signed.pdf23 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3-300923 signed.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 30092023 MASS ZIA ARCHITECT CERTIFICATE.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 mass zia engineer certificate 30-09-23_2_ revised.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 mass zia engineer certificate 30-06-23 _1_ revised.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Mass zia engineer certificate 31-03-23.pdf23 May 2025

How this compares with Mumbai Suburban

52%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 19 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MASS ZAINAB HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI6,700+ in Mumbai Suburban

2 kmMASS ZAINAB HEIGHTSCompleted 106Lapsed / revoked 63Abeyance 1Other 130Dot size: filed unitsN

Filed coordinates, straight-line distance. 300 registered projects within 2 km.

Builder: MASS ZIA DEVELOPMENT CORPORATION

MASS ZIA DEVELOPMENT CORPORATION has 2 registrations on MahaRERA, including MASS ZAINAB HEIGHTS and Mass Zainab Sky. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MASS ZAINAB HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MASS ZAINAB HEIGHTS?

The registered promoter entity is MASS ZIA DEVELOPMENT CORPORATION, a partnership as per the filing. Its GSTIN 27ABRFM3434E1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MASS ZAINAB HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MASS ZAINAB HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MASS ZAINAB HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MASS ZAINAB HEIGHTS?

The professionals named in the filing: Architect: ZEESHAN ANSARI; Engineer: SAMEER JADEJA; Chartered Accountant: Sarfaraz Khan; Chartered Accountant: M N J & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MASS ZAINAB HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MASS ZAINAB HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MASS ZAINAB HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.