Home / Browse projects / Gandhinagar, Gujarat / Maruti Flora 2

Valid until 30 Jun 2025 Residential/Group Housing project

Maruti Flora 2

By Rachana Infrastructure

RG-GJ-97608 · RERA PR/GJ/GANDHINAGAR/DEHGAM/AUDA/RAA09089/240921 · Last updated on GujRERA portal: 5 Jun 2025

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jun 2025Possession promisedno revision filed
72 of 72Construction stages doneacross 8 buildings; every applicable stage filed complete
1 of 80Units unsoldnot recorded sold or booked
Jump to the 48 documents Report an error

Maruti Flora 2 is a Residential/Group Housing project by Rachana Infrastructure in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/DEHGAM/AUDA/RAA09089/240921 on 24 Sep 2021. Possession is promised by 30 Jun 2025. 79 of the 80 units on this registration are recorded sold or booked, and 72 of 72 construction stages are filed complete.

At a glance

Project

  • NameMaruti Flora 2
  • TypeResidential/Group Housing
  • Location
    • TP 2
    • Dehgam
    • New S No 2132
    • FP No. 142
    • Nr. Triveni Farm
    • Opp. Umiya Mata Mandir
    • Dehgam
    • Dehgam
    • Gandhinagar
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/DEHGAM/AUDA/RAA09089/240921
  • ReraGenie IDRG-GJ-97608

Builder

  • NameRachana Infrastructure
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredSep 2021PromisedJun 2025

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2025
  • Registered on24 Sep 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings8 building records
  • Documents filed48 files

Current status

99%79 of 80 units booked
100.0%Of the estimated cost spent so far

Figures as on 5 Jun 2025, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1 BUNGLOW NO 01 TO 07---707
B1 BUNGLOW NO 08 TO 18---11011
C1 BUNGLOW NO 19 TO 24---606
D1 BUNGLOW NO 25 TO 30---606
E1 BUNGLOW NO 31 TO 40---10010
F1 BUNGLOW NO 41 TO 53---13013
G1 BUNGLOW NO 54 TO 63---10010
H1 BUNGLOW NO 64 TO 80---17017

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building8

As on 5 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

72 of 72 construction stages are filed complete across 8 buildings.

A1 BUNGLOW NO 01 TO 07100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B1 BUNGLOW NO 08 TO 18100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C1 BUNGLOW NO 19 TO 24100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D1 BUNGLOW NO 25 TO 30100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
E1 BUNGLOW NO 31 TO 40100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
F1 BUNGLOW NO 41 TO 53100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
G1 BUNGLOW NO 54 TO 63100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
H1 BUNGLOW NO 64 TO 80100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 5 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area23,431 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 15.35 cr
Cost incurredRs 15.35 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
H1 BUNGLOW NO 64 TO 80NARs 4.02 crRs 4.02 cr
F1 BUNGLOW NO 41 TO 53NARs 2.31 crRs 2.31 cr
B1 BUNGLOW NO 08 TO 18NARs 2.02 crRs 2.02 cr
E1 BUNGLOW NO 31 TO 40NARs 1.79 crRs 1.79 cr
G1 BUNGLOW NO 54 TO 63NARs 1.79 crRs 1.79 cr
A1 BUNGLOW NO 01 TO 07NARs 1.27 crRs 1.27 cr
C1 BUNGLOW NO 19 TO 24NARs 1.08 crRs 1.08 cr
D1 BUNGLOW NO 25 TO 30NARs 1.08 crRs 1.08 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHAUMIKKUMAR C DONGA
EngineerPARESHKUMAR MOHANLAL CHAVADA

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/DEHGAM/AUDA/RAA09089/240921 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)5 Jun 2025
Accountant's certificate (Form 3)5 Jun 2025
Site photograph, A1 BUNGLOW NO 01 TO 074 Jun 2025
Site photograph, B1 BUNGLOW NO 08 TO 184 Jun 2025
Site photograph, C1 BUNGLOW NO 19 TO 244 Jun 2025
Site photograph, D1 BUNGLOW NO 25 TO 304 Jun 2025
Site photograph, E1 BUNGLOW NO 31 TO 404 Jun 2025
Site photograph, F1 BUNGLOW NO 41 TO 534 Jun 2025
Site photograph, G1 BUNGLOW NO 54 TO 634 Jun 2025
Site photograph, H1 BUNGLOW NO 64 TO 804 Jun 2025
Engineer's certificate (Form 2)8 Oct 2024
Engineer's certificate annexure8 Oct 2024
RERA registration certificate24 Sep 2021
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

99%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one has not

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep Maruti Flora 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gandhinagar1,600+ in Gandhinagar

2 kmMaruti Flora 2Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: Rachana Infrastructure

Rachana Infrastructure has 1 registration on GujRERA, including Maruti Flora 2. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if Maruti Flora 2 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Maruti Flora 2?

The registered promoter entity is Rachana Infrastructure, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Maruti Flora 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Maruti Flora 2?

The professionals named in the filing: Architect: BHAUMIKKUMAR C DONGA; Engineer: PARESHKUMAR MOHANLAL CHAVADA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Maruti Flora 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Maruti Flora 2. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Maruti Flora 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.