Home / Browse projects / Mumbai Suburban, Maharashtra / Marina Enclave Wings Q and R with Kindergarten Phase - IV
Marina Enclave Wings Q and R with Kindergarten Phase - IV
By GURUKRUPA DEVELOPERS D N NAGR PROJECT
RG-MH-45839 · RERA P51800032847 · Last updated on MahaRERA portal: 18 Apr 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 4 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Marina Enclave Wings Q and R with Kindergarten Phase - IV is a Others project by GURUKRUPA DEVELOPERS D N NAGR PROJECT in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032847 on 2 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.
At a glance
Project
- NameMarina Enclave Wings Q and R with Kindergarten Phase - IV
- TypeOthers
- Location
- 90 ft road
- Malvani Malad West
- Borivali
- Mumbai Suburban
- 400095
- Pincode400095
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800032847
- ReraGenie IDRG-MH-45839
Builder
- NameGURUKRUPA DEVELOPERS D N NAGR PROJECT
- Entity typePartnership
- GSTIN27AAFFG7859Q1ZF
- PartnersMansukh Arjanbhai Sureja, CHETAN NAVINCHANDRA PATEL, CHETAN MANSUKHLAL KOTHARI, HITESH HANSRAJ PATEL, SKC TRADING PRIVATE LIMITED DIRECTOR SHRI SAMIR M SUREJA DIRECTOR SHRI SAMIR M SUREJA, GURUASHISH BUILDCON LLP DIRECTOR SHRI MANSUKH A SUREJA DIRECTOR SHRI MANSUKH A SUREJA
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Feb 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed186 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing Q | NA | 40 | 0 | 0 | 0 | 0 |
| Wing R with Kindergarten | NA | 39 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 91%.
Wing Q74%
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 91% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
Wing R with Kindergarten69%
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
Progress on shared amenities15
As on 18 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed444
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing Q | 215 | 215 |
| Wing R with Kindergarten | 229 | 229 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Space Moulders |
| Engineer | Sura & Associates |
| Chartered Accountant | BH Kishnadwala & Associates |
| Partner | Role in project |
|---|---|
| GURUKRUPA DEVELOPERS D N NAGR PROJECT | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 9 Apr 2025
Documents filed186
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 186 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032025.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032025.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31032025.pdf | 18 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf | 9 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 digi signed GDDN QR.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GDDNQR31122024.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QR for 311224.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 digi signed GDDN QR.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GDDNQR31122024.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QR for 311224.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 digi signed GDDN QR.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QR for 311224.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GDDNQR31122024.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q R with Kindergarten 30092024.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2GDDNQR 30092024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Marina Enclave QR30092024.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q R with Kindergarten 30092024.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2GDDNQR 30092024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Marina Enclave QR30092024.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q R with Kindergarten 30092024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Marina Enclave QR30092024.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2GDDNQR 30092024.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 QR FY 23 2.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 QR FY 23 2.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 QR FY 23 2.pdf | 7 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2AFY202324.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 QR 30thJune24.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 QR 30thJune24.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QR 30thJune24.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 QR 310324.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 QR 310324.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 QR 310324.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QR For 2A22-23uploadedON 25THAPR23.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 23-24.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QR 310324.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122023.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31122023.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122023.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: soldusold1 Wing Q.pdf | 19 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: soldusold2 Wing R.pdf | 19 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: soldusold3 kindergartern.pdf | 19 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Sept23 qtr.pdf | 21 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 QR 30092023.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 QR 30092023.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GDDNQR 300923.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23 QR.pdf | 5 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jun'23.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun'23.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun'23.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 310323.pdf | 25 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QR For 2A310323.pdf | 25 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032023.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 310323.pdf | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 QR 31032023.pdf | 19 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31122022.pdf | 3 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122022.pdf | 31 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 QR31122022.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM130092022.pdf | 28 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30092022.pdf | 24 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092022.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 31032022.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A RERA 2022QR.pdf | 22 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 RERA 2022QR.pdf | 22 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 RERA 2022QR.pdf | 22 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3QRwithkindergarten30062022.pdf | 6 Oct 2022 |
| Other - TechnicalFile: FORM 2A RERA 2022QR.pdf | 6 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04052022Form1Architect Certificate.pdf | 7 May 2022 |
| Layout approvalFile: Total Layout area Development certificate by Architect.pdf | 24 Jan 2022 |
| Layout approvalFile: Total area Layout Certificate by GDDN.pdf | 24 Jan 2022 |
| Layout approvalFile: Total Layout 507 PHASE PLAN PDF.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 1.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 2.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 3.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 4.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 5.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 6.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 7.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 8.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 9.pdf | 24 Jan 2022 |
| Building plan approvalFile: 31032021Marina Enclave 10.pdf | 24 Jan 2022 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Marina Enclave Wings OP Phase IIIp51800032311 | CTS No 507 Survey No. 44/1Villge Malvani Malad ( W) Mumbai 400095 | 175 | Completed | Jun 2023 | Jan 1970 |
| Marina Enclave Wings MN Phase Ii | CTS 507 Survey 44 1 Village Malvani Malad W Mumbai 400095 | 172 | Completed | Dec 2020 | Mar 2020 |
| Marina Enclave Wings JKL Phase I | CTS 507 Survey 44 1 Village Malvani Malad W Mumbai 400095 | 258 | Completed | Dec 2019 | Jun 2019 |
| Marina Enclave A to I | CTS 507 Survey No 44 1 Village Malvani Malad West Mumbai 400095 | 708 | Completed | Dec 2016 | Aug 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 186 filed documents as one ZIP, foldered, with a manifest
Keep Marina Enclave Wings Q and R with Kindergart on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Malvani Malad West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 83 registered projects within 2 km.
Gauri Elegance
M/S Gauri Land Developers LLP
Galaxy Heights Tower 1
Maharashtra Police Cooperative Housing Fed
Galaxy Heights, Tower-III, Wing L to P
Maharashtra Police Co-Operative Housing Fe
Galaxy Heights, Tower-II, Wing A to B
Maharashtra Police Co-Operative Housing Fe
95 WEST COMPOSITE
STANS BUILDTECH REALTY
95WEST
STANS BUILDTECH REALTY
See every Mumbai Suburban project, with the district possession charts
Builder: GURUKRUPA DEVELOPERS D N NAGR PROJECT
GURUKRUPA DEVELOPERS D N NAGR PROJECT has 1 registration on MahaRERA, including Marina Enclave Wings Q and R with Kindergarten Phase - IV. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Marina Enclave Wings Q and R with Kindergarten Phase - IV is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Marina Enclave Wings Q and R with Kindergarten Phase - IV?
The registered promoter entity is GURUKRUPA DEVELOPERS D N NAGR PROJECT, a partnership as per the filing. Its GSTIN 27AAFFG7859Q1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Marina Enclave Wings Q and R with Kindergarten Phase - IV?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Marina Enclave Wings Q and R with Kindergarten Phase - IV?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Marina Enclave Wings Q and R with Kindergarten Phase - IV?
The professionals named in the filing: Architect: Space Moulders; Engineer: Sura & Associates; Chartered Accountant: BH Kishnadwala & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Marina Enclave Wings Q and R with Kindergarten Phase - IV?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.