Mapple Residency
RG-MH-51229 · RERA P50500017875 · Last updated on MahaRERA portal: 22 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mapple Residency is a Plotted project by Anita Rakesh Patni in Nagpur, Maharashtra, registered with MahaRERA as P50500017875 on 24 Sep 2018. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 48 months from the original filing. 19 of the 30 units on this registration are recorded sold or booked.
At a glance
Project
- NameMapple Residency
- TypePlotted
- Location
- KATOL ROAD
- FETRI
- Gonhi (535862)
- Nagpur (Rural)
- Nagpur
- 441501
- Pincode441501
- RERA no.P50500017875
- ReraGenie IDRG-MH-51229
Builder
- NameAnita Rakesh Patni
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Sep 2018
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Mar 2022)
- BuildingsNot stated in filing
- Documents filed83 files
Current status
Figures as on 22 Feb 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 22 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Anita Rakesh Patni | Nagpur (M Corp.) | Nagpur |
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sandeep Patni |
| Engineer | DIPAK KHADSE |
| Chartered Accountant | AGRAWAL SARAF & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Anita Rakesh Patni | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to less demand for plots than expected as the expected development of the area did not take place. Also there was tremendous increase in cost of development due to inflation. Now, again the demand for plots in that area is increasing and the project seams viable. For proper development of the project the extension is sought
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Sep 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Sep 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Sep 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Maple June 23.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Maple Sept 23.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Maple Dec 23.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Maple March 24.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Maple June 24.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Maple Sept 24.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Maple Dec24.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Maple March 23.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Mar 24.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Dec 24.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Sep24.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 June 24.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Dec 23.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Sep 23.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 June 23.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Mar 23.pdf | 22 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 March 23.pdf | 22 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 June 23.pdf | 22 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 Sept 23.pdf | 22 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 Des 23.pdf | 22 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 March 24.pdf | 22 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 June 24.pdf | 22 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 Sept 24.pdf | 22 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 Des 24.pdf | 22 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: new permission.pdf | 31 Aug 2022 |
| Declaration about Commencement CertificateFile: Dec abt comm.pdf | 31 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep 2021.pdf | 31 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 21.pdf | 31 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 22.pdf | 31 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Sep 2021.pdf | 31 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Dec 21.pdf | 31 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate March 22.pdf | 31 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate Quality March 22.pdf | 31 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Information of sold- booked inventory.pdf | 31 Aug 2022 |
| Certificates of CA (Form 3)File: FORM 3 SEP 21.pdf | 31 Aug 2022 |
| Certificates of CA (Form 3)File: FORM 3 DEC 21.pdf | 31 Aug 2022 |
| Certificates of CA (Form 3)File: FORM 3 MARCH 22.pdf | 31 Aug 2022 |
| Certificates of CA (Form 3)File: FORM 3 JUNE22.pdf | 31 Aug 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200244937603_For_Asset_Based_Search_18_08_2022_12_32_07_636.pdf | 18 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Declaration of details of encumbrances concerned to legal.pdf | 10 Aug 2022 |
| Declaration about Commencement CertificateFile: Declaration about commencment certificate.pdf | 10 Aug 2022 |
| Declaration in FORM BFile: Form B.pdf | 10 Aug 2022 |
| Proforma of Allotment letterFile: Allotment letter and agreement.pdf | 10 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf | 10 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: Declaration for deviation with respect to allotment letter.pdf | 10 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Declaration for deviation with respect to model copy of agreement.pdf | 10 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5.pdf | 5 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf | 5 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01.pdf | 14 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01.pdf | 14 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01.pdf | 14 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01 com.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 5 Nov 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 5 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 5 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 5 Nov 2019 |
| Certificates of CA (Form 3)File: Form 3.pdf | 5 Nov 2019 |
| Certificates of CA (Form 3)File: Form 3.pdf | 5 Nov 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf | 5 Nov 2019 |
| Details of encumbrancesFile: 16.pdf | 11 Sep 2018 |
| Declaration in FORM BFile: form B.pdf | 11 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 11 Sep 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 11 Sep 2018 |
| Proforma of Allotment letterFile: Agreement and laootment letter.pdf | 11 Sep 2018 |
| Layout approvalFile: sanction NIT agreement and layout plan final.pdf | 5 Sep 2018 |
| Building plan approval or NA orderFile: Not applicable.pdf | 5 Sep 2018 |
| PAN CardFile: Pan Card Anita Patni.pdf | 5 Sep 2018 |
| Copy of the legal title reportFile: Search compressed.pdf | 5 Sep 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Mapple Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near FETRI2,800+ in Nagpur
MAYA NAGARI PARK-1
PRAVIN WAMANRAO BHOYAR
DERA GREENS 3
NARAYAN CHANDIRAM DEMBLE
MADHAV NAGARI- 3
MIDAS PROPERTIES
NIRALA GREEN WOODS
Nirala Buildtech Private Limited
DERA GREENS 2
VIJAY KIMATRAI HUF
Nisarg Vihar
CRUSH-N-CUT STONES PRIVATE LIMITED
See every Nagpur project, with the district possession charts
Builder: Anita Rakesh Patni
Anita Rakesh Patni has 1 registration on MahaRERA, including Mapple Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that Mapple Residency shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Mapple Residency is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mapple Residency?
The registered promoter entity is Anita Rakesh Patni, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mapple Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mapple Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mapple Residency?
The professionals named in the filing: Architect: Sandeep Patni; Engineer: DIPAK KHADSE; Chartered Accountant: AGRAWAL SARAF & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mapple Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback