ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / MAPLEWOODS PHASE II

Registered No litigation declared Residential / Group Housing project

MAPLEWOODS PHASE II

By M/S BKS Galaxy Realtors LLP

RG-MH-06162 · RERA P51700051868 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 70%
1Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

MAPLEWOODS PHASE II is a Residential / Group Housing project by M/S BKS Galaxy Realtors LLP in Thane, Maharashtra, registered with MahaRERA as P51700051868 on 7 Jul 2023. Possession is promised by 31 Dec 2029. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMAPLEWOODS PHASE II
  • TypeResidential / Group Housing
  • Location
    • Gut No. 51(2) 56 and 57(2)
    • Dighe
    • Thane (M Corp.)
    • Thane
    • 400708
  • Pincode400708
  • RERA no.P51700051868
  • ReraGenie IDRG-MH-06162

Builder

  • NameM/S BKS Galaxy Realtors LLP
  • Entity typePartnership
  • GSTIN27ABBFB0621Q1ZG
  • PartnersSiddhant Sanjay Gawande, Brij Achruram Gupta, Kashish Brij Gupta, Kulbir Dayal Singh Rekhi
  • Other registrations1 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jul 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed126 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building CNA440000
Building ENA440000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 70%.

Building C26%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building E27%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor60%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Society OfficeYes0%
Swimming PoolYes0%
GymnasiumYes0%

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered2
Open Space56
BuildingClosed/CoveredOpen SpaceTotal
Building C12829
Building E12829

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area20,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI32602.23
Proposed, not sanctioned32,602 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivaji Chowk Sector 17 Vashi Navi Mumbai

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThe Firm
EngineerPravin Kulkarni
EngineerSantosh Ramshiromani Singh
Chartered AccountantN G Darne & Co Vishal Kambare
Chartered AccountantJ.B.Lodha & Co.
PartnerRole in project
M/S BKS Galaxy Realtors LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502171Pooja NegiM/S BKS Galaxy Realtors LLP01/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 May 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1_Maplewoods Phase II.pdf11 Jul 2026
Form 2File: Form 2_Maplewoods Phase 2.pdf11 Jul 2026
Form 3File: Form 3-Maplewoods-Phase 2.pdf11 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29- Mapelwood Phase II as on June 2026.pdf11 Jul 2026
Form 1File: Form 1 - Maplewood Phase II as on Mar 2026.pdf10 Apr 2026
Form 2File: Form 2 - Maplewood Phase II as on Mar 2026.pdf10 Apr 2026
Form 3File: Form 3 - Maplewood Phase II as on Mar 2026.pdf10 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Maplewood Phase II as on Mar 2026.pdf10 Apr 2026
Form 1File: Form 1 - Maplewoods Phase 2 as on Dec 2025.pdf18 Jan 2026
Form 2File: Form 2 - Maplewoods Phase 2 as on Dec 2025.pdf18 Jan 2026
Form 3File: Form 3 - Maplewoods Phase 2 as on Dec 2025.pdf18 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Maplewoods Phase 2 as on Dec 2025.pdf18 Jan 2026
Form 1File: Form 1 - Maplewood Phase II as on Sep 2025.pdf6 Jan 2026
Form 2File: Form 2 - Maplewood Phase II as on Sep 2025.pdf6 Jan 2026
Form 3File: Form 3 - Maplewood Phase II as on Sep 2025.pdf6 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Maplewood Phase II as on Sep 2025.pdf6 Jan 2026
Form 1File: Form 1 - Maplewood Phase II as on June 2025.pdf16 Aug 2025
Form 2File: Form 2 - Maplewood Phase II as on June 2025.pdf16 Aug 2025
Form 3File: Form 3 - Maplewood Phase II as on June 2025.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Maplewood Phase II as on June 2025.pdf16 Aug 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance Phase II.pdf21 Jun 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER Litigations Phase 2.pdf21 Jun 2025
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance Phase II.pdf21 Jun 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER Litigations Phase 2.pdf21 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Phase 2.pdf9 Jun 2025
Copy of the legal title reportFile: RERA Title Report.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Maplewoods Phase 2.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase II.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II Phase 2.pdf6 May 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER Litigations Phase 2.pdf28 Apr 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER Litigations Phase 2.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Maplewood Phase 2.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Phase II.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II Phase II.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Phase 2.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Phase II.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Phase 2-Maplewoods.pdf9 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Finance_Phase II.pdf24 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Legal Phase II.pdf24 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance Finance_Phase II.pdf24 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance Legal Phase II.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3__pdf.pdf14 Aug 2024
Other - TechnicalFile: Declaration Cum Undertaking (1).pdf14 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf13 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II - Phase 2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Phase II-Maplewoods.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Phase 2.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1PHASE_2MAPLEWOODS.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II_Phase II.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Phase II (1).pdf20 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Letter Phase II.pdf18 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrances Letter Phase II.pdf18 Apr 2024
Proforma of Agreement for saleFile: MAPLEWOOD PHASE II DRAFT AGREEMENT.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_Sept'23.pdf19 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Phase_II.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III.pdf19 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate.pdf15 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbrances Certificate.pdf15 Jul 2023
Other - LegalFile: Declaration.pdf15 Jul 2023
CERSAI detailsFile: Registration Certificate.pdf1 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf27 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account deatils.pdf26 Jun 2023
Declaration in FORM BFile: Form B.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I_.pdf23 Jun 2023
Proforma of Agreement for saleFile: AFS Phase-2_with Deviation in other font.pdf23 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.pdf23 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS.pdf23 Jun 2023
Other - LegalFile: Declaration.pdf23 Jun 2023
Proforma of Allotment letterFile: Maplewood Allottment Leter.pdf22 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200272019355_For_Asset_Based_Search_20_06_2023_17_39_53_716.pdf20 Jun 2023
Building plan approvalFile: MYSCAN_20230413_0020.pdf19 Jun 2023
Building plan approvalFile: MYSCAN_20230413_0021.pdf19 Jun 2023
Building plan approvalFile: MYSCAN_20230413_0022.pdf19 Jun 2023
Building plan approvalFile: MYSCAN_20230413_0023.pdf19 Jun 2023
Building plan approvalFile: MYSCAN_20230413_0024.pdf19 Jun 2023

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GreenwoodsSector - 35E Kharghar196CompletedDec 2023Dec 2023
Sai Proviso CountyVillage Shirdhone Tal Panvel416CompletedJun 2023Jun 2023
Sai Proviso AashleshaSector 4A Koparkhairane104CompletedDec 2019Jun 2019
Galaxy CarinaSector 15 Kharghar89CompletedDec 2015May 2015
Galaxy OrionSector 35D Kharghar93CompletedDec 2013Jul 2013
Galaxy NebulaSector 10 Kharghar Navi Mumbai80CompletedJun 2013Jul 2012

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAPLEWOODS PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dighe7,600+ in Thane

Builder: M/S BKS Galaxy Realtors LLP

M/S BKS Galaxy Realtors LLP has 2 registrations on MahaRERA, including MAPLEWOODS PHASE 1 and MAPLEWOODS PHASE II. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MAPLEWOODS PHASE II is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAPLEWOODS PHASE II?

The registered promoter entity is M/S BKS Galaxy Realtors LLP, a partnership as per the filing. Its GSTIN 27ABBFB0621Q1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAPLEWOODS PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAPLEWOODS PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MAPLEWOODS PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAPLEWOODS PHASE II?

The professionals named in the filing: Architect: The Firm; Engineer: Pravin Kulkarni; Engineer: Santosh Ramshiromani Singh; Chartered Accountant: N G Darne & Co Vishal Kambare; Chartered Accountant: J.B.Lodha & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAPLEWOODS PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAPLEWOODS PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAPLEWOODS PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.