ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / MAPLE GREENS

Completed No litigation declared Others project

MAPLE GREENS

By THE SILWANT

RG-MH-63537 · RERA P52000013794 · Last updated on MahaRERA portal: 21 Oct 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 31 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Oct 2023Possession promisedregistration recorded completed
50 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 29 documents Report an error

MAPLE GREENS is a Others project by THE SILWANT in Raigarh, Maharashtra, registered with MahaRERA as P52000013794 on 25 Oct 2017. The registration is recorded completed; possession was promised by 31 Oct 2023. The completion date has moved by 31 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMAPLE GREENS
  • TypeOthers
  • Location
    • Ukrul
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000013794
  • ReraGenie IDRG-MH-63537

Builder

  • NameTHE SILWANT
  • Entity typePartnership
  • PartnersBHARAT NARSINGH PATEL, RASIK NARSINH CHAUHAN, ASHVIN SHANTILAL PATEL, DAHYABHAI MADHABHAI PATEL, SHAILESH GOVINDBHAI PATEL, MAHENDRAKUMAR VASHRAMBHAI PATEL, ASHISH KANTILAL BHATT

Key dates

this monthRegisteredOct 2017First promiseMar 2021Revised toOct 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Oct 2017
  • Promised completion31 Oct 2023
  • Revised completionRevised to 31 Oct 2023 (originally 30 Mar 2021)
  • Buildings5 building records
  • Documents filed29 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA60000
WING BNA60000
WING CNA60000
WING O AND PNA60000
WING QNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 21 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING O AND P91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING Q91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered5
Open Space9
BuildingClosed/CoveredOpen SpaceTotal
WING A101
WING B123
WING C101
WING O AND P101
WING Q178

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,185 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SANGITA MANOHAR PATILChinchawaliRaigarh
AJINKYA MANOHAR PATILChinchawaliRaigarh

Approvals and building plan

Permissible FSI5677.26
Proposed, not sanctioned5,677 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTIARA COMPLEX KHARGHAR 410210

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION ARCHITECTURE
EngineerS V PATEL AND ASSOCIATES
Chartered AccountantCA PRITESH GADA
PartnerRole in project
THE SILWANT-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017151Mar 2021 → Oct 2023

Reason as filed by the promoterI am writing in response to the show cause notice dated 29/05/2023 regarding the lapsed project under RERA No. P52000013794. We apologize for the delay in compliance and appreciate the opportunity to provide an explanation. During our meeting with RERA official and SRO representative on 19-jun-2023, at MAHARERA office it was adviced that we should submit the necessary documents for RERA extension. Our RERA Registraion certificate was valid till 30/03/2022. Our projct was completed before the expiry date. We had also applied for OC before expiry date. But we recived our Occupatiojn Certificate

EXT52000009371Mar 2021 → Sep 2021

Reason as filed by the promoterINSUFFICIENT SUPPLY OF LABOUR DUE TO PANDEMIC. WE HAVE COMPLETED 100 % WORK AND BUILDING IS READY FOR POSESSION BUT WE NEED TIME EXTENTION FOR RECEVING OC.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000198398CC006000000198398The Silvant20/09/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Oct 2023

Documents filed29

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 stamped.pdf21 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OC.pdf17 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 THE SILWANT.pdf17 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC copy.pdf3 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of Legal Entity.pdf3 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REG CERTIFICATE.pdf28 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf30 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PHOTO-2022-11-02-12-38-40 (1).pdf2 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PHOTO-2022-11-02-12-38-40.pdf2 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA FORM 5 2019-20.pdf27 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf20 Nov 2019
Certificates of CA (Form 5)File: The Silwant Form 5.pdf6 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 PDF.pdf23 Apr 2018
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf23 Apr 2018
Proforma of Allotment letterFile: Flat Agreement Draft Ukrul.pdf23 Apr 2018
Building plan approvalFile: MYSCAN_20171009_0001 (1).pdf9 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20171009_0001 (1).pdf9 Oct 2017
Proforma of Allotment letterFile: scan0002.pdf9 Oct 2017
Layout approvalFile: ilovepdf_jpg_to_pdf (1).pdf7 Oct 2017
Copy of the legal title reportFile: title report-ilovepdf-compressed.pdf7 Oct 2017
Details of encumbrancesFile: lettrhead.pdf7 Oct 2017
Copy of Layout Approval (in case of layout)File: ilovepdf_jpg_to_pdf (1).pdf7 Oct 2017
Commencement Certificates / NA Order for plotted developmentFile: C C-ilovepdf-compressed-ilovepdf-compressed.pdf7 Oct 2017
Declaration in FORM BFile: FORM B.pdf7 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1236- RERA Certificate.pdf7 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1236- RERA Certificate-03.pdf7 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1236- RERA Certificate-02.pdf7 Oct 2017
Certificates of CA (Form 3)File: FORM 3.pdf7 Oct 2017
PAN CardFile: ilovepdf_jpg_to_pdf.pdf6 Oct 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 31 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAPLE GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ukrul5,900+ in Raigarh

2 kmMAPLE GREENSCompleted 16Lapsed / revoked 17Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: THE SILWANT

THE SILWANT has 1 registration on MahaRERA, including MAPLE GREENS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if MAPLE GREENS is delayed beyond 31 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAPLE GREENS?

The registered promoter entity is THE SILWANT, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAPLE GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAPLE GREENS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MAPLE GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAPLE GREENS?

The professionals named in the filing: Architect: DESTINATION ARCHITECTURE; Engineer: S V PATEL AND ASSOCIATES; Chartered Accountant: CA PRITESH GADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAPLE GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAPLE GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAPLE GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.