ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MANTRA MOMENTS PHASE 2

Completed No litigation declared Residential / Group Housing project

MANTRA MOMENTS PHASE 2

By MANTRA PROPERTIES

RG-MH-01674 · RERA P52100000094 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

MANTRA MOMENTS PHASE 2 is a Residential / Group Housing project by MANTRA PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100000094 on 30 Jun 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMANTRA MOMENTS PHASE 2
  • TypeResidential / Group Housing
  • Location
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000094
  • ReraGenie IDRG-MH-01674

Builder

  • NameMANTRA PROPERTIES
  • Entity typePartnership
  • PartnerASHISH SATISH GUPTA
  • Other registrations7 more →
  • Completed6 of 8
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredJun 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Jun 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings3 building records
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING DNA150000
BUILDING ENA150000
Building FNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

BUILDING D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
WATER BODYYes100%
CHILDREN PLAY AREAYes100%

Parking filed123

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots123
Closed/Covered123
BuildingClosed/CoveredTotal
BUILDING D2626
BUILDING E6363
Building F3434

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,999 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13177.01
Proposed, not sanctioned13,177 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSADASHIV PETH PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEEPESH BHURAT
EngineerPARAG CHOPADA
Chartered AccountantCA Avtarsingh H Saini
PartnerRole in project
MANTRA PROPERTIES-

Litigation declared2

CaseCourtStatus
98/2013In the Court of Tahsildar AkurdiStayed
495/2014SDO Haveli PuneFINAL ORDER PASSED

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000106468Rajan Gupta For Mantra MomentsShrishail Vitthal Gurav18/01/2022
CC005000000340790Mantra mements Building A CHSMantra Properties Pvt. Ltd Through Mr. Viren Shah17/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Aug 2020

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Moments Ph 2.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Mantra Properties_Phase 2_19-20 to 22-23.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Mantra Properties_Phase 2_19-20 to 22-23.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Mantra Properties_Phase 2_19-20 to 22-23.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mantra Properties_Phase 2_19-20 to 22-23.pdf25 Sep 2023
Certificates of Architect (Form 4)File: Form 4 Ph 2.pdf25 Feb 2023
Status of ConveyanceFile: Conveyance Deed Letter Moments Ph 2.pdf25 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: D building-Society Certificate.pdf20 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: E building-Society Certificate.pdf20 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: F building-Society Certificate.pdf20 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DEF MERGED.pdf3 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Mantra Moments Phase 2.pdf17 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Mantra Moments Phase 2 17-18.pdf17 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Mantra Moments Phase 2.pdf17 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architects Certificate Moments D E F Bldg.pdf6 Nov 2019
Certificates of Architect (Form 4)File: Form_4.pdf30 Jan 2019
OtherFile: E Building Completion.pdf30 Jan 2019
OtherFile: Moments site_ D AND F Completion.pdf30 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 132-RERA-DEF-17-ilovepdf-compressed.pdf21 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC CERTIFICATE PHASE 2.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: moments phase 2 engineering certificate.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: moments phase 2 engineering certificate.pdf30 Mar 2018
Certificates of CA (Form 3)File: moments 2.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Moments Phase 2 - DEF.pdf31 Oct 2017
Layout approvalFile: PROPOSED LAYOUT FINAL MOMENTS-Model.pdf27 Jun 2017
Building plan approvalFile: F FLOOR PLAN 2.pdf27 Jun 2017
Details of encumbrancesFile: Moments Encumberance.pdf27 Jun 2017
Copy of Layout Approval (in case of layout)File: PROPOSED LAYOUT FINAL MOMENTS-Model.pdf27 Jun 2017
Building Plan Approval (IOD)File: F FLOOR PLAN 2.pdf27 Jun 2017
Declaration in FORM BFile: Form b Moments Phase 2.pdf27 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate Moments D E F.pdf27 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate DEF.pdf27 Jun 2017
Certificates of CA (Form 3)File: CA Certificate Moments Phase 2.pdf27 Jun 2017
Proforma of Allotment letterFile: D-E-F- Agreement Draft Copy.pdf27 Jun 2017
Layout approvalFile: Sanction layout moments.PDF26 Jun 2017
Building plan approvalFile: D FLOOR PLAN.PDF26 Jun 2017
Building plan approvalFile: D FLOOR PLAN 2.PDF26 Jun 2017
Building plan approvalFile: E FLOOR PLAN.PDF26 Jun 2017
Building plan approvalFile: E FLOOR PLAN 2.PDF26 Jun 2017
Building plan approvalFile: F FLOOR PLAN 1.PDF26 Jun 2017
Copy of Layout Approval (in case of layout)File: Sanction layout moments.PDF26 Jun 2017
Building Plan Approval (IOD)File: D FLOOR PLAN.PDF26 Jun 2017
Building Plan Approval (IOD)File: D FLOOR PLAN 2.PDF26 Jun 2017
Building Plan Approval (IOD)File: E FLOOR PLAN.PDF26 Jun 2017
Building Plan Approval (IOD)File: E FLOOR PLAN 2.PDF26 Jun 2017
Building Plan Approval (IOD)File: F FLOOR PLAN 1.PDF26 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE MOSHI LATEST.pdf26 Jun 2017
PAN CardFile: Mantra properties pan card.pdf14 Jun 2017
Copy of the legal title reportFile: Additional Search Report.pdf14 Jun 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MANTRA SENSESAUTADE HANDEWADI PUNE 411028131CompletedJun 2016Late, Jul 2017
Mantra Moments Phase 1gat no 167 168 Borhadewadi moshi 412105229CompletedMar 2016Mar 2016
OMEGA RETREATNANGARGAON NEAR SWAMI SAMARTH MATH MAWAL TALUKA PUNE 4104018CompletedApr 2015Apr 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANTRA MOMENTS PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri Chinchawad (M Corp.)13,700+ in Pune

2 kmMANTRA MOMENTS PHASE 2Completed 7Lapsed / revoked 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: MANTRA PROPERTIES

MANTRA PROPERTIES has 8 registrations on MahaRERA, including MANTRA MOMENTS PHASE 2 and Mantra Moments Phase 3. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANTRA MOMENTS PHASE 2 is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRA MOMENTS PHASE 2?

The registered promoter entity is MANTRA PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRA MOMENTS PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MANTRA MOMENTS PHASE 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MANTRA MOMENTS PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRA MOMENTS PHASE 2?

The professionals named in the filing: Architect: DEEPESH BHURAT; Engineer: PARAG CHOPADA; Chartered Accountant: CA Avtarsingh H Saini. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRA MOMENTS PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRA MOMENTS PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRA MOMENTS PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.