ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / MANOHAR KUNJ

Completed No litigation declared Residential / Group Housing project

MANOHAR KUNJ

By GIRIRAJ SHELTERS LLP

RG-MH-43253 · RERA P51600051391 · Last updated on MahaRERA portal: 17 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Staircases, 75%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

MANOHAR KUNJ is a Residential / Group Housing project by GIRIRAJ SHELTERS LLP in Nashik, Maharashtra, registered with MahaRERA as P51600051391 on 8 Jun 2023. The registration is recorded completed; possession was promised by 31 Dec 2027.

At a glance

Project

  • NameMANOHAR KUNJ
  • TypeResidential / Group Housing
  • Location
    • BHABHA NAGAR
    • Nashik (M Corp.)
    • Nashik
    • 422001
  • Pincode422001
  • RERA no.P51600051391
  • ReraGenie IDRG-MH-43253

Builder

  • NameGIRIRAJ SHELTERS LLP
  • Entity typeOthers
  • Named personsSHANAY JAWAHAR LADHA, RAHUL RAJAN LONDHE, SHANAY JAWAHAR LADHA

Key dates

this monthRegisteredJun 2023PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Jun 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANOHAR KUNJNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.

MANOHAR KUNJ: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 17 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered1
Open Space30

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area442 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2024
LandownerVillageDistrict
VIJAY VINAYAK BHATNashik (M Corp.)Nashik

Approvals and building plan

Permissible FSI1378.38
Proposed, not sanctioned1,378 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch51-NEEL KAMAL HOUSE, THATTE NAGAR COLLEGE ROAD NASHIK 422005

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDINESH BHAMRE
EngineerKESHAV KADAM
EngineerROHAN GHUMARE
Chartered AccountantABHAY BHARUKA
Chartered AccountantPIYUSH VERMA
Chartered AccountantB S V D AND ASSOCIATES
PartnerRole in project
GIRIRAJ SHELTERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Mar 2025

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Registration No P51600051391 (1).pdf17 May 2025
Occupational CertificateFile: Completion Certificate.pdf6 May 2025
Other - TechnicalFile: Registration No P51600051391.pdf23 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf14 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate FROM 1 (Regulation 3) MANOHAR KUNJ 30092024.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate FROM 1 (Regulation 3) MANOHAR KUNJ 31122024.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate FROM 2 (Regulation 3) MANOHAR KUNJ 30092024.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate FROM 2 (Regulation 3) MANOHAR KUNJ 31122024.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 24 - converted.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Giriraj shelters LLP FORM5.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 24 - converted.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Giriraj shelters LLP FORM5.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 24 - converted.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Giriraj shelters LLP FORM5.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 24 - converted.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 24.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Giriraj shelters LLP FORM5.pdf6 Oct 2024
Form 1File: Form 1 - June 24.pdf4 Oct 2024
Form 2File: Form 2 - June 24.pdf4 Oct 2024
Form 3File: Form 3 - June 24.pdf4 Oct 2024
Form 5 (FY 2023-2024)File: Giriraj Shelters LLP revised Form 5.pdf12 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q2.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q2.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q2.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate June End.pdf24 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf24 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 Apr 2023
Layout approvalFile: Approved Drawing.pdf26 Apr 2023
Building plan approvalFile: Approved Drawing.pdf26 Apr 2023
PAN CardFile: Giriraj LLP PANCARD.pdf26 Apr 2023
Copy of the legal title reportFile: Title Search Report.pdf26 Apr 2023
Details of encumbrances concerned to FinanceFile: GS Dec Encumbrances.pdf26 Apr 2023
Details of encumbrances concerned to LegalFile: GS Dec Encumbrances.pdf26 Apr 2023
Copy of Layout Approval (in case of layout)File: Approved Drawing.pdf26 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Drawing.pdf26 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert.pdf26 Apr 2023
Declaration about Commencement CertificateFile: GS Dec CC.pdf26 Apr 2023
Declaration in FORM BFile: Affi Promoter.pdf26 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200267085363_For_Asset_Based_Search_26_04_2023_19_31_19_150.pdf26 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RAHUL RAJAN LONDHE.pdf26 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SHANAY JAWAHAR LADHA.pdf26 Apr 2023
Proforma of Agreement for saleFile: Flat Vikri Kararnama Rera sample giriraj.pdf26 Apr 2023
Proforma of Allotment letterFile: Allotment letter.pdf26 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: GS Dec Bnk AC.pdf26 Apr 2023
Deviation Report with respect to Allotment letterFile: NoDev Allotment.pdf26 Apr 2023
Deviation Report with respect to model copy of AgreementFile: NoDev Agreement.pdf26 Apr 2023

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANOHAR KUNJ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHABHA NAGAR4,100+ in Nashik

Builder: GIRIRAJ SHELTERS LLP

GIRIRAJ SHELTERS LLP has 1 registration on MahaRERA, including MANOHAR KUNJ. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if MANOHAR KUNJ is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANOHAR KUNJ?

The registered promoter entity is GIRIRAJ SHELTERS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANOHAR KUNJ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANOHAR KUNJ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANOHAR KUNJ?

The professionals named in the filing: Architect: DINESH BHAMRE; Engineer: KESHAV KADAM; Engineer: ROHAN GHUMARE; Chartered Accountant: ABHAY BHARUKA; Chartered Accountant: PIYUSH VERMA; Chartered Accountant: B S V D AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANOHAR KUNJ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANOHAR KUNJ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANOHAR KUNJ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.