ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MANGALAM MIRAYA

Registered No litigation declared Residential / Group Housing project

MANGALAM MIRAYA

By SHREE DATTA MANGALAM ASSOCIATES

RG-MH-52342 · RERA P52100054359 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
7 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 85%
87 of 352Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 171 documents Report an error

MANGALAM MIRAYA is a Residential / Group Housing project by SHREE DATTA MANGALAM ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100054359 on 15 Jan 2024. Possession is promised by 31 Dec 2027. 265 of the 352 units on this registration are recorded sold or booked, and 7 of 33 construction stages are filed complete.

At a glance

Project

  • NameMANGALAM MIRAYA
  • TypeResidential / Group Housing
  • Location
    • Dehu Alandi Road
    • Borhadewadi
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054359
  • ReraGenie IDRG-MH-52342

Builder

  • NameSHREE DATTA MANGALAM ASSOCIATES
  • Entity typePartnership
  • PartnersChetan Suresh Kunjir, Ramdas Damodar Phuge designated partner of Mangalam Landmarks LLP, Ganesh Pandurang Ghare designated partner of Shri Bhagirathi Realty LLP, Sandip Pandurang Ghare designated partner of Shri Bhagirathi Realty LLP, Nitin Pandurang Ghare designated partner of Shri Bhagirathi Realty LLP, Sagar Vitthal Ghare designated partner of Shri Bhagirathi Realty LLP, Sachin Vitthal Ghare designated partner of Shri Bhagirathi Realty LLP

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed171 files

Current status

75%265 of 352 units booked
50.4%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building DNA22221350135
Building BNA17171090109
Building CNA18181080108

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 85%.

Building D54%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)0%
Plinth100%
Stilt Floor82%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Building B41%
ActivityProgress
Excavation100%
Basement (if any)82%
Podiums (if any)0%
Plinth100%
Stilt Floor85%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
Building C50%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth100%
Stilt Floor85%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed137

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots137
Closed/Covered108
Open Space29
BuildingClosed/CoveredOpen SpaceTotal
Building D74074
Building C342963

Land and ownership29

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,800 sq m
Land owned byThe promoter, with other names on the file
Named landowners29
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Oct 2025
LandownerVillageDistrict
Surekha Pandurang GhareMoshiPune
Vitthal Dattatray GhareMoshiPune
Sanjivini Vitthal GhareMoshiPune
Sandeep Pandurang GhareMoshiPune
Manisha Sandeep GhareMoshiPune
Shravani Sandeep Ghare D/O Sandeep GhareMoshiPune
Bhagyesh Sandeep Ghare S/o Sandeep GhareMoshiPune
Ganesh Pandurang GhareMoshiPune
Sarika Ganesh GhareMoshiPune
Tanmay Ganesh Ghare s/o Ganesh GhareMoshiPune
Shivanya Ganesh Ghare d/o Ganesh GhareMoshiPune
Nitin Pandurang GhareMoshiPune
Pooja Nitin GhareMoshiPune
Rudra Nitin Ghare s/o Nitin GhareMoshiPune
Sachin Vitthal GhareMoshiPune
Sonali Sachin GhareMoshiPune
Sanskriti Sachin Ghare d/o Sachin GhareMoshiPune
Sarvdanya Sachin Ghare s/o Sachin GhareMoshiPune
Sagar Vitthal GhareMoshiPune
Tejshree Sagar GhareMoshiPune
Sarvesh Sagar Ghare s/o Sagar GhareMoshiPune
Kalpana Sunil KuteMoshiPune
Sarika Mahesh KuteMoshiPune
Rukmini Urf Sarubai Shivaji JadhavMoshiPune
Sulochana Murlidhar KuteMoshiPune
Aruna Urf Lata Tukaram KuteMoshiPune
Alka Ramesh GaikwadMoshiPune
Nalini Urf Sangita Bhagwan ShindeMoshiPune
Pandurang Dattatray GhareMoshiPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI45760.0
Proposed, not sanctioned13,100 sq m
Buildings approved4
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShree Ganesh Plaza Shivaji Chowk Hinjawadi Pune 411057
Estimated costRs 120.66 cr
Cost incurredRs 60.79 cr
Work done50.38%
BuildingWingEstimatedIncurred
Building DNARs 36.42 crRs 25.99 cr
Building CNARs 35.17 crRs 21.12 cr
Building BNARs 35.14 crRs 10.64 cr
-NARs 13.93 crRs 3.03 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR VILAS JAGANNATH YELE
EngineerVaibhav Gaikwad
Chartered AccountantAMRUTA SHINDE AND ASSOCIATES CHARTERED ACCOUNTANTS
Chartered AccountantVikas Khadasare
PartnerRole in project
SHREE DATTA MANGALAM ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed171

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 171 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Miraya Arch certificate upto 31 March 2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Engg Certificate upto March 2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 SDMA upto 31 March 2026.pdf20 Apr 2026
Layout approvalFile: 1SanctionedlayoutNov2025.pdf24 Jan 2026
Building plan approvalFile: 2 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 3 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 4 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 5 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 6 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 7 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 8 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 9 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 10 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 11 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 12 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 13 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 14 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 15 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 16 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 17 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 18 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 19 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 20 Nov 2025.pdf24 Jan 2026
Building plan approvalFile: 21 Nov 2025.pdf24 Jan 2026
Commencement certificateFile: CC 12112025.pdf24 Jan 2026
Withdrawal Update Form 1File: Form 1 Miraya Arch certificate upto 31 Dec 2025.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 upto Dec 2025 Miraya.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3upto dec 2025 Miraya compressed.pdf24 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 2024 to 2025 SDMA.pdf19 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 2023 - 2024 shree datta mangalam 200924001.pdf17 Jan 2026
Withdrawal Update Form 1File: Miraya Arch Cer Sep 2025_0001 (1).pdf20 Oct 2025
Withdrawal Update Form 2File: final MANGALAM MIRAYA FORM 2 DOWNLOAD (1).pdf20 Oct 2025
Withdrawal Update Form 3File: final MANGALAM MIRAYA FORM 3 DOWNLOAD (1).pdf20 Oct 2025
Form 3File: Form 3 upto June 25.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY UPTO JUNE 25.pdf19 Jul 2025
Form 1File: Form 1 Architect Certificate Mangalam Miraya upto June 2025.pdf19 Jul 2025
Form 2File: Form 2 Engg Certificate upto June 25.pdf19 Jul 2025
Form 1File: Form 1 Architect Certificate Mangalam Miraya upto March 2025.pdf26 Jun 2025
Form 2File: Form 2 Miraya upto March 2025.pdf26 Jun 2025
Form 3File: Form 3 SDMA as on 31032025compressed.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Updated 31032025 Disclosure of sold and unsold inventory.pdf26 Jun 2025
Form 1File: Miraya Arch Certificate upto Dec 2024.pdf26 Jun 2025
Form 2File: scan DEC 24 Form 2 Engineers certificate Mangalam MIRAYA.pdf26 Jun 2025
Form 3File: CA Certificate Form 3 upto Dec 2024 Miraya_compressed.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Miraya DOSU upto dec 2024_compressed.pdf26 Jun 2025
Form 1File: Miraya Form1 Sept2024.pdf26 Jun 2025
Form 2File: Form 2 Sept 2024 Miraya.pdf26 Jun 2025
Form 3File: Form 3 Miraya Sept 2024compressed.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: DOSU Sept 2024compressed.pdf26 Jun 2025
Form 1File: Form1 june miraya .pdf26 Jun 2025
Form 2File: Form 2 June 2024 Miraya.pdf26 Jun 2025
Form 3File: June 2024 Miraya 3mb CA Certificate.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: DSU Miraya 30June2024.pdf26 Jun 2025
Form 1File: Form 1 Miraya March 2024.pdf26 Jun 2025
Form 2File: Form 2 Miraya March 2024.pdf26 Jun 2025
Form 3File: Form 3 Miraya March 2024.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold 31march2024.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Mangalam Miraya upto March 2025.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SDMA as on 31032025compressed.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Miraya upto March 2025.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: scan DEC 24 Form 2 Engineers certificate Mangalam MIRAYA.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Miraya Arch Certificate upto Dec 2024.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Miraya Arch Certificate upto Dec 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 upto Dec 2024 Miraya_compressed.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Miraya DOSU upto dec 2024_compressed.pdf18 Jan 2025
Proforma of Agreement for saleFile: Agreement Mangalam Miraya.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2024 Miraya.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: DOSU Sept 2024compressed.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Miraya Form1 Sept2024.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Miraya Sept 2024compressed.pdf25 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: shree datta mangalam 200924001.pdf9 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A 23TO24 Miraya.pdf7 Aug 2024
Building plan approvalFile: 2 Parking Layout.pdf3 Aug 2024
Building plan approvalFile: 3 Building -B.pdf3 Aug 2024
Building plan approvalFile: 3 Building -B.pdf3 Aug 2024
Building plan approvalFile: 4 Building - B -8th to 13th Floor.pdf3 Aug 2024
Building plan approvalFile: 5 Building B Terrace.pdf3 Aug 2024
Building plan approvalFile: 6 Building B Elevation.pdf3 Aug 2024
Building plan approvalFile: 7 Building B OHWT.pdf3 Aug 2024
Building plan approvalFile: 8 Building C- upto 12th Floor.pdf3 Aug 2024

How this compares with Pune

75%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANGALAM MIRAYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borhadewadi13,700+ in Pune

2 kmMANGALAM MIRAYACompleted 79Lapsed / revoked 42Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 214 registered projects within 2 km.

Builder: SHREE DATTA MANGALAM ASSOCIATES

SHREE DATTA MANGALAM ASSOCIATES has 1 registration on MahaRERA, including MANGALAM MIRAYA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANGALAM MIRAYA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANGALAM MIRAYA?

The registered promoter entity is SHREE DATTA MANGALAM ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANGALAM MIRAYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANGALAM MIRAYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANGALAM MIRAYA?

The professionals named in the filing: Architect: AR VILAS JAGANNATH YELE; Engineer: Vaibhav Gaikwad; Chartered Accountant: AMRUTA SHINDE AND ASSOCIATES CHARTERED ACCOUNTANTS; Chartered Accountant: Vikas Khadasare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANGALAM MIRAYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANGALAM MIRAYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANGALAM MIRAYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.