Home / Browse projects / Pune, Maharashtra / MANAS RESIDENCY

Registered No litigation declared Residential / Group Housing project

MANAS RESIDENCY

By OORJITAA REALTORS

RG-MH-36089 · RERA P52100016431 · Last updated on MahaRERA portal: 20 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
7 of 11Construction stages donefurthest along: Staircases, 95%
31 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

MANAS RESIDENCY is a Residential / Group Housing project by OORJITAA REALTORS in Pune, Maharashtra, registered with MahaRERA as P52100016431 on 10 May 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 17 of the 48 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameMANAS RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • NASHIK HIGHWAY
    • aalephata
    • Ale
    • Junnar
    • Pune
    • 412411
  • Pincode412411
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016431
  • ReraGenie IDRG-MH-36089

Builder

  • NameOORJITAA REALTORS
  • Entity typePartnership
  • PartnersRAMESH RAJARAM BORHADE, AMOL BABAN DUMBRE, PRITESH RAMESH BORHADE, SHIVAJI BALA MAHALE

Key dates

this monthRegisteredMay 2018First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2018
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed49 files

Current status

35%17 of 48 units booked
84.9%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING C WINGNA5548048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

BUILDING C WING: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes85%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Open Space27

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,575 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SHARAD KURHADE AND OTHERSAlePune
VILAS DAWKHARBotaAhmednagar

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI6022.28
Proposed, not sanctioned4,104 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchONKAR PLAZA 1ST FLOOR GAT NO 2982/2983, KALYAN NAGAR ROAD, ALEPHATA TAL JUNNAR PUNE412411
Estimated costRs 10.85 cr
Cost incurredRs 9.22 cr
Work done84.91%
BuildingWingEstimatedIncurred
BUILDING C WINGNARs 5.75 crRs 4.93 cr
-NARs 5.10 crRs 4.28 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTRIPTI GUPTA ARCHITECTS AND DESIGNERS
EngineerPankaj Sawant
Chartered AccountantMukesh Choudhari
PartnerRole in project
OORJITAA REALTORS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027625Dec 2024 → Dec 2025

Reason as filed by the promoterWe had obtained approval for our proposal without any delay. Even the construction of the building was going on without a hitch on site. After which a phase came wherein, we faced a major downfall in our sale of flats due to which we could not have sufficient funds to manage the construction expenses for a certain period of time. Therefore, the construction of the building could not go smoothly & we could not complete the project within the committed time. Currently, we are able to sell flats at a normal pace & there are no financial crunches to delay the building construction. Our project is

EA25012619578Dec 2024 → Dec 2026

Reason as filed by the promoterWe request you to approve extension of the project due to lack of sale of flats resulting revenue difficulties. The project’s financial model relied on milestone-based payments from new allottees. The absence of these sales led to an exhaustion of the initial capital/loans, making it impossible to pay contractors or procure materials. Despite active marketing, sale of flats is not as expected which is beyond our control. Still we are trying our best in good faith.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf20 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Aug 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Aug 2026
Withdrawal Update Form 1File: FORM 1.pdf26 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf26 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf26 Jun 2026
Form 5 (FY 2025-2026)File: FORM 5.pdf19 May 2026
Form 2A (FY 2025-2026)File: Form 2A_2026.pdf13 May 2026
Form 2A (FY 2024-2025)File: Form 2A_2025.pdf13 May 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf22 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf21 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf21 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5.pdf7 Dec 2025
Form 1File: Form 1.pdf5 Dec 2025
Form 2File: Form 2.pdf5 Dec 2025
Form 3File: Form 3.pdf5 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory.pdf5 Dec 2025
Certificates of CA (Form 3)File: FORM 3.pdf18 Dec 2023
Layout approvalFile: REVISED_compressed.pdf18 Oct 2023
Copy of Layout Approval (in case of layout)File: REVISED_compressed.pdf18 Oct 2023
Proforma of Allotment letterFile: AFS_REVISED_15-3-22.pdf15 Mar 2022
Copy of the legal title reportFile: search report 1_compressed (1).pdf26 Nov 2020
Copy of the legal title reportFile: search report _compressed.pdf26 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Awinash verma compressed.pdf26 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CARERA2018-19.pdf26 Nov 2020
Proforma of Allotment letterFile: sale agreement.pdf26 Nov 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER2.pdf26 Nov 2020
OtherFile: Admissionofpartners_compressed.pdf26 Nov 2020
Certificates of CA (Form 3)File: Awinash verma compressed.pdf4 May 2018
Proforma of Allotment letterFile: Agreement to Sale oorjita.pdf4 May 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf4 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ilovepdf_merged-ilovepdf-compressed.pdf3 May 2018
Layout approvalFile: TPSANCTION-ilovepdf-compressed.pdf26 Apr 2018
Layout approvalFile: HPSC0401-min.pdf26 Apr 2018
Layout approvalFile: compressed_compressed_NA.pdf26 Apr 2018
Building plan approvalFile: TPSANCTION-ilovepdf-compressed.pdf26 Apr 2018
PAN CardFile: OORJITA PAN.pdf26 Apr 2018
Copy of the legal title reportFile: FINALSEARCHREPORT_COMPRESSED.pdf26 Apr 2018
Details of encumbrancesFile: NONENCUMBRANCE CERTIFICATE.pdf26 Apr 2018
Copy of Layout Approval (in case of layout)File: TPSANCTION-ilovepdf-compressed.pdf26 Apr 2018
Copy of Layout Approval (in case of layout)File: HPSC0401-min.pdf26 Apr 2018
Copy of Layout Approval (in case of layout)File: compressed_compressed_NA.pdf26 Apr 2018
Building Plan Approval (IOD)File: TPSANCTION-ilovepdf-compressed.pdf26 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: compressed_compressed_NA.pdf26 Apr 2018
Declaration in FORM BFile: FORM B_COMPRESSED.pdf26 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT_COMPRESSEDPDF.pdf26 Apr 2018

How this compares with Pune

35%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANAS RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near aalephata13,700+ in Pune

2 kmMANAS RESIDENCYCompleted 3Lapsed / revoked 3Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: OORJITAA REALTORS

OORJITAA REALTORS has 1 registration on MahaRERA, including MANAS RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANAS RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANAS RESIDENCY?

The registered promoter entity is OORJITAA REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANAS RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANAS RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANAS RESIDENCY?

The professionals named in the filing: Architect: TRIPTI GUPTA ARCHITECTS AND DESIGNERS; Engineer: Pankaj Sawant; Chartered Accountant: Mukesh Choudhari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANAS RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANAS RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANAS RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.