Home / Browse projects / Pune, Maharashtra / Shubham Tarangan Phase II

Completed No litigation declared Residential / Group Housing project

Shubham Tarangan Phase II

By Shubham Vipra Associates

RG-MH-17491 · RERA P52100029066 · Last updated on MahaRERA portal: 31 May 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
28 of 44Construction stages doneacross 4 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
122 of 252Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

Shubham Tarangan Phase II is a Residential / Group Housing project by Shubham Vipra Associates in Pune, Maharashtra, registered with MahaRERA as P52100029066 on 23 Apr 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 130 of the 252 units on this registration are recorded sold or booked, and 28 of 44 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameShubham Tarangan Phase II
  • TypeResidential / Group Housing
  • Location
    • On Pune Nashik Highway
    • Opp. to Reliance Petrol Pump
    • 1.5 Kms from Alephata Chowk toward Nashik
    • A/P - Ale
    • Tal - Junnar
    • Dist - Pune
    • Ale
    • Junnar
    • Pune
    • 412411
  • Pincode412411
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029066
  • ReraGenie IDRG-MH-17491

Builder

  • NameShubham Vipra Associates
  • Entity typeIndividual
  • GSTIN27ACFFS9015G1Z0
  • PartnersPRADEEP PRATAPRAO WALSEPATIL, VINAY KHUSHALCHAND BADERA
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Apr 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed151 files

Current status

52%130 of 252 units booked

Figures as on 31 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AshwiniNA8756056
KrutikaNA8756056
SwatiNA8756056
PurnaNA8784084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 31 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

Ashwini94%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Krutika74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Swati73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Purna75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed428

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots428
Closed/Covered108
Open Space320
BuildingClosed/CoveredOpen SpaceTotal
Ashwini247498
Krutika286189
Swati2897125
Purna2888116

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,088 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Vinay Khushalchand BaderaPune (M Corp.)Pune
Shubham Vipra AssociatesPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityASSISTANT DIRECTOR OF TOWN PLANNING, PUNE BRANCH, PUNE
Permissible FSI17929.16
Proposed, not sanctioned17,929 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APARTMENTS GROUND FLOOR, PLOT NO 3, CTS NO 870, BHANDARKAR ROAD, PUNE, MAHARASHTRA 411 004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN STUDIO
EngineerSHUBHAM VIPRA ASSOCIATES
Chartered AccountantA S JANGADA & ASSOCIATES
Chartered AccountantNITISH VAIDYA AND ASSOCIATES
PartnerRole in project
SHUBHAM VIPRA ASSOCIATES-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12504328Prajakta JadhavShubham Vipra Associates07/12/2025
CC12602043Shubham Vipra AssociatesDipankar Narayan Dinda07/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC upload with cc mail.pdf31 May 2026
Occupational CertificateFile: CC mail.pdf31 May 2026
Form 1File: Form 1 upload.pdf23 May 2026
Form 2File: Form 2 upload final.pdf23 May 2026
Form 3File: Form 3 upload.pdf23 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf23 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular upload.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular upload.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular upload.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular upload.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular upload.pdf22 May 2026
Form 1File: Form 1 upload.pdf22 May 2026
Form 2File: Form 2 upload.pdf22 May 2026
Form 3File: Form 3.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular upload.pdf22 May 2026
Form 1File: Form 1 upload.pdf19 May 2026
Form 2File: Form 2 upload.pdf19 May 2026
Form 3File: Form 3.pdf19 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf19 May 2026
Form 1File: Form 1 upload.pdf19 May 2026
Form 2File: Form 2 upload.pdf19 May 2026
Form 3File: Form 3.pdf19 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf19 May 2026
Form 1File: Form 1 upload.pdf19 May 2026
Form 2File: Form 2 upload.pdf19 May 2026
Form 3File: Form 3.pdf19 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf19 May 2026
Form 1File: Form 1 upload.pdf19 May 2026
Form 2File: Form 2 upload.pdf19 May 2026
Form 3File: Form 3.pdf19 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Circular upload.pdf19 May 2026
Form 1File: Form 1 upload.pdf19 May 2026
Form 2File: Form 2 upload.pdf19 May 2026
Form 3File: Form 3.pdf19 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular upload.pdf19 May 2026
Form 1File: Form 1 upload.pdf19 May 2026
Form 2File: Form 2 upload.pdf19 May 2026
Form 3File: Form 3.pdf19 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular upload.pdf19 May 2026
Form 1File: Final Form 1 upload.pdf19 May 2026
Form 2File: Form 2 upload.pdf19 May 2026
Form 3File: Form 3.pdf19 May 2026
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf19 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ASHWINI-KRUTIKA-SWATI-PURNA RERA CERTIFICATE.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3_31032024_16-07-2025 - converted (1).pdf17 Jul 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Shubham Tarangan Phase IALE172CompletedMar 2019Mar 2017

How this compares with Pune

52%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shubham Tarangan Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near 1.5 Kms from Alephata Chowk toward Nashik, A/P - Ale, Tal - Junnar, Dist - Pune13,700+ in Pune

Builder: Shubham Vipra Associates

Shubham Vipra Associates has 1 registration on MahaRERA, including Shubham Tarangan Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shubham Tarangan Phase II is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shubham Tarangan Phase II?

The registered promoter entity is Shubham Vipra Associates, an individual as per the filing. Its GSTIN 27ACFFS9015G1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shubham Tarangan Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Shubham Tarangan Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Shubham Tarangan Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shubham Tarangan Phase II?

The professionals named in the filing: Architect: DESIGN STUDIO; Engineer: SHUBHAM VIPRA ASSOCIATES; Chartered Accountant: A S JANGADA & ASSOCIATES; Chartered Accountant: NITISH VAIDYA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shubham Tarangan Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shubham Tarangan Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shubham Tarangan Phase II to a free account