ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Malhar Resisdency

Registered No litigation declared Others project

Malhar Resisdency

By JAI MALHAR PROMOTER AND DEVELOPERS

RG-MH-05588 · RERA P52100077023 · Last updated on MahaRERA portal: 21 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 95%
22 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

Malhar Resisdency is a Others project by JAI MALHAR PROMOTER AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100077023 on 16 Jul 2024. Possession is promised by 31 Dec 2026. 4 of the 26 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameMalhar Resisdency
  • TypeOthers
  • Location
    • Dawane Mala
    • Jejuri
    • Jejuri (M Cl)
    • Purandhar
    • Pune
    • 412303
  • Pincode412303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077023
  • ReraGenie IDRG-MH-05588

Builder

  • NameJAI MALHAR PROMOTER AND DEVELOPERS
  • Entity typePartnership
  • PartnersOmkar Macchindranath Wadkar, Sagar Subhash Darekar

Key dates

this monthRegisteredJul 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jul 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed47 files

Current status

15%4 of 26 units booked
92.8%Work done, per cost certificate

Figures as on 21 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Malhar ResisdencyNA4420626

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

Malhar Resisdency: 62% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered6
Open Space6

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area800 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jul 2025
LandownerVillageDistrict
Ramchandra Krushnaji ZagadeJejuri RuralPune
Harishchandra krushnaji ZagadeJejuri RuralPune
Shakuntala Chhaban ZagadeJejuri RuralPune
Santosh Chhaban ZagadeJejuri RuralPune
Ganesh Chhaban ZagadeJejuri RuralPune
Suman Vijay ZagadeJejuri RuralPune
Kiran Vijay ZagadeJejuri RuralPune
Smita Manik BaravkarJejuri RuralPune
Ujjwala Machindra WadkarHadapsarPune

Approvals and building plan

Sanctioning authorityJejuri Municipal Council
Permissible FSI1765.15
Proposed, not sanctioned1,248 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Tupe Complex, S No 84, Hadapsar Pune 411028
Estimated costRs 2.50 cr
Cost incurredRs 2.32 cr
Work done92.8%
BuildingWingEstimatedIncurred
Malhar ResisdencyNARs 2.00 crRs 1.85 cr
-NARs 50.00 lakhRs 47.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmol Shinde
EngineerOmkar wadkar
Chartered AccountantPASALKAR AND ASSOCIATES
Chartered AccountantP R A S S & ASSOCIATES
PartnerRole in project
JAI MALHAR PROMOTER AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sept.pdf21 Jun 2026
Withdrawal Update Form 1File: Form 1 Dec.pdf21 Jun 2026
Withdrawal Update Form 1File: FORM 1 Architect CERTIFICATE 31-03-2026.pdf21 Jun 2026
Withdrawal Update Form 2File: Form 2 Sept.pdf21 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec.pdf21 Jun 2026
Withdrawal Update Form 2File: Form 2 Mar 2026.pdf21 Jun 2026
Withdrawal Update Form 3File: Form 3 Sept 2025.pdf21 Jun 2026
Withdrawal Update Form 3File: Form 3 Dec 2025.pdf21 Jun 2026
Withdrawal Update Form 3File: Form 3 Mar 2026.pdf21 Jun 2026
Form 1File: Architect Certificate.pdf13 Aug 2025
Form 2File: Engineer Certificate.pdf13 Aug 2025
Form 3File: Form 3_11zon.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf13 Aug 2025
Form 1File: Architect Certificate.pdf13 Aug 2025
Form 2File: Engineer Certificate.pdf13 Aug 2025
Form 3File: Form 3.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf13 Aug 2025
Form 1File: Architect Certificate.pdf13 Aug 2025
Form 2File: Engineer Certificate.pdf13 Aug 2025
Form 3File: Form 3.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf13 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf25 Jun 2024
Details of encumbrances concerned to FinanceFile: Finance and legal (2).pdf24 Jun 2024
Details of encumbrances concerned to LegalFile: Finance and legal (2).pdf24 Jun 2024
Other - TechnicalFile: Annexure A.pdf24 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organizations (2).pdf21 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organizations (4).pdf21 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organizations.pdf21 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf21 Jun 2024
CERSAI detailsFile: CERSAI_Search_Report_200308483885_For_Asset_Based_Search_29_05_2024_12_43_49_929.pdf29 May 2024
Copy of the legal title reportFile: jejuri serch report_11zon.pdf6 May 2024
Proforma of Agreement for saleFile: Proforma of agreement sale.pdf10 Apr 2024
Proforma of Allotment letterFile: allotment letter.pdf10 Apr 2024
Layout approvalFile: REVSIE MALHAR RESIDENCY SANCTIONED PLAN 1.pdf1 Apr 2024
Building plan approvalFile: REVSIE MALHAR RESIDENCY SANCTIONED PLAN 1.pdf1 Apr 2024
Copy of Layout Approval (in case of layout)File: REVSIE MALHAR RESIDENCY SANCTIONED PLAN 1.pdf1 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: REVSIE MALHAR RESIDENCY SANCTIONED PLAN 1.pdf1 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: REVISE MALHAR RESIDENCY COMMNECEMENT 1.pdf1 Apr 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf1 Apr 2024
Declaration in FORM BFile: Form B.pdf1 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf1 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf1 Apr 2024
Deviation Report with respect to Allotment letterFile: Model copy of allotment.pdf1 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Model copy of agreement.pdf1 Apr 2024
PAN CardFile: Firm PAN.pdf27 Mar 2024
Details of encumbrances concerned to FinanceFile: Finance and Legal.pdf27 Mar 2024
Details of encumbrances concerned to LegalFile: Finance and Legal.pdf27 Mar 2024

How this compares with Pune

15%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Malhar Resisdency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jejuri13,700+ in Pune

2 kmMalhar ResisdencyCompleted 2Lapsed / revoked 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: JAI MALHAR PROMOTER AND DEVELOPERS

JAI MALHAR PROMOTER AND DEVELOPERS has 1 registration on MahaRERA, including Malhar Resisdency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Malhar Resisdency is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Malhar Resisdency?

The registered promoter entity is JAI MALHAR PROMOTER AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Malhar Resisdency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Malhar Resisdency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Malhar Resisdency?

The professionals named in the filing: Architect: Amol Shinde; Engineer: Omkar wadkar; Chartered Accountant: PASALKAR AND ASSOCIATES; Chartered Accountant: P R A S S & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Malhar Resisdency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Malhar Resisdency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Malhar Resisdency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.