ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Lavthaleshwar Heights

Registered No litigation declared Residential / Group Housing project

Lavthaleshwar Heights

By Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers

RG-MH-65268 · RERA P52100049346 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 50%
78 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

Lavthaleshwar Heights is a Residential / Group Housing project by Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers in Pune, Maharashtra, registered with MahaRERA as P52100049346 on 7 Feb 2023. Possession is promised by 31 Dec 2027. 34 of the 112 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameLavthaleshwar Heights
  • TypeResidential / Group Housing
  • Location
    • Jejuri
    • Jejuri (M Cl)
    • Purandhar
    • Pune
    • 412303
  • Pincode412303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049346
  • ReraGenie IDRG-MH-65268

Builder

  • NameSachin Balkrushn Bayas proprietor of Lavthaleshwar developers
  • Entity typeIndividual
  • GSTIN27AVTPB9750C1ZD
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed127 files

Current status

30%34 of 112 units booked

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lavthaleshwar HeightsNA10106349112

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

Lavthaleshwar Heights: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks28%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed216

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots216
Closed/Covered67
Open Space149

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,837 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityJejuri municipal council
Permissible FSI6410.31
Proposed, not sanctioned6,410 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSnehasurya S No 1470 1534 Market Yard Sasvad Pune 412301

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant Gulabrao Nazrekar
EngineerPrashant Gulabrao Nazrekar
Chartered AccountantA P Yadav and CO
Chartered AccountantYOGESH SURESH KHAIRE
Chartered AccountantPRAVIN Dasharath Bichukale
PartnerRole in project
Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: JAN FEB MARCH 2026 ARCHITECT CERTIFICATE.pdf27 Apr 2026
Form 2File: JAN FEB MARCH 2026 ENGINEER CERTIFICATE.pdf27 Apr 2026
Form 3File: FORM 3 31032026.pdf27 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf27 Apr 2026
Form 1File: ARCHITECT CERTIFICATE JAN FEB MARCH 2023.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf1 Apr 2026
Form 3File: FORM 3 31032023.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT AND ENGINEER CERTIFICATE APR MAY JUN 2023.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE APR MAY JUN 2023.pdf1 Apr 2026
Form 3File: FORM 3 30062023.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT CERTIFICATE JAN FEB MARCH 2025.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE JAN FEB MARCH 2025.pdf1 Apr 2026
Form 3File: FORM 3 31032025.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT CERTIFICATE APR MAY JUN 2024.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE APR MAY JUN 2024.pdf1 Apr 2026
Form 3File: FORM 3 30062024.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT AND ENGINEER CERTIFICATE JUL AUG SEP 2024.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE JUL AUG SEP 2024.pdf1 Apr 2026
Form 3File: FORM 3 30092024.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT OCT NOV DEC 2024.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE OCT NOV DEC 2024.pdf1 Apr 2026
Form 3File: FORM 3 31122024.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT CERTIFICATE APR MAY JUN 2025.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf1 Apr 2026
Form 3File: FORM 3 30062025.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT CERTIFICATE JULLY AUG SEP 2025.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE JULLY AUG SEP 2025.pdf1 Apr 2026
Form 3File: FORM 3 30092025.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT CERTIFICATE OCT NOV DEC 2025.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE OCT NOV DEC 2025.pdf1 Apr 2026
Form 3File: FORM 3 31122025.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT CERTIFICATE JUL AUG SEP 2023.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE JUL AUG SEP 2023.pdf1 Apr 2026
Form 3File: FORM 3 30092023.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT CERTIFICATE OCT NOV DEC 2023.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE OCT NOV DEC 2023.pdf1 Apr 2026
Form 3File: FORM 3 31122023.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 1File: ARCHITECT CERTIFICATE JAN FEB MARCH 2024.pdf1 Apr 2026
Form 2File: ENGINEER CERTIFICATE JAN FEB MARCH 2024.pdf1 Apr 2026
Form 3File: FORM 3 31032024.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD INVENTORY.pdf1 Apr 2026
Form 5 (FY 2022-2023)File: CA Form_5 2022-23.pdf30 Mar 2026
Form 5 (FY 2023-2024)File: CA Form_5 2023-24.pdf30 Mar 2026
Form 5 (FY 2024-2025)File: CA Form_5 2024-25.pdf30 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1) MAR 2024.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1) JUNE 2024.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1) SEP 2024.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2) MAR 2024.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2) JUNE 2024.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2) SEP 2024.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf4 Dec 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf4 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate june 2023.pdf11 Sep 2023
PAN CardFile: proprietorship letter with shop act.pdf2 Feb 2023
Details of encumbrances concerned to FinanceFile: Other Finance.pdf2 Feb 2023
Details of encumbrances concerned to LegalFile: Other Finance.pdf2 Feb 2023
Other - FinanceFile: proprietorship letter with shop act.pdf2 Feb 2023
PAN CardFile: PAN Card WITH SHOT ACT.pdf31 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account FINAL CORRECTED.pdf31 Jan 2023
Copy of the legal title reportFile: SCAN legal title report 5.pdf26 Jan 2023
Details of encumbrances concerned to FinanceFile: scan Encum finance Lav height.pdf26 Jan 2023
Details of encumbrances concerned to LegalFile: scan Encum finance Lav height.pdf26 Jan 2023

How this compares with Pune

30%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lavthaleshwar Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jejuri13,700+ in Pune

2 kmLavthaleshwar HeightsCompleted 2Lapsed / revoked 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers

Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers has 2 registrations on MahaRERA, including Lavthaleshwar Complex and Lavthaleshwar Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Lavthaleshwar Heights is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lavthaleshwar Heights?

The registered promoter entity is Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers, an individual as per the filing. Its GSTIN 27AVTPB9750C1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lavthaleshwar Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Lavthaleshwar Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lavthaleshwar Heights?

The professionals named in the filing: Architect: Prashant Gulabrao Nazrekar; Engineer: Prashant Gulabrao Nazrekar; Chartered Accountant: A P Yadav and CO; Chartered Accountant: YOGESH SURESH KHAIRE; Chartered Accountant: PRAVIN Dasharath Bichukale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lavthaleshwar Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lavthaleshwar Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lavthaleshwar Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.