Home / Browse projects / Pune, Maharashtra / Majestique Nest Building E
Majestique Nest Building E
RG-MH-21950 · RERA P52100034017 · Last updated on MahaRERA portal: 5 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Majestique Nest Building E is a Residential / Group Housing project by M/S MAJESTIQUE ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100034017 on 17 Mar 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date.
At a glance
Project
- NameMajestique Nest Building E
- TypeResidential / Group Housing
- Location
- --
- FURSUNGI
- Haveli
- Pune
- 412308
- Pincode412308
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100034017
- ReraGenie IDRG-MH-21950
Builder
- NameM/S MAJESTIQUE ASSOCIATES
- Entity typePartnership
- PartnerMEHTA HEIGHTS LLP THROUGH MR SANJAY BHANWARLAL MEHTA
- Other registrations4 more →
- Completed4 of 5
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Mar 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed98 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| E BUILDING | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.
E BUILDING: 74% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 5 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed143
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership6
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Maruti Sitaram Kale | Fursungi | Pune |
| Vittal Maruti Kale | Fursungi | Pune |
| Somnath Maruti Kale | Fursungi | Pune |
| Yeshwant Maruti Kale | Fursungi | Pune |
| Vishnu Sitaram Kale | Fursungi | Pune |
| Dattatray Vishnu Kale | Fursungi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR JAY AERAM |
| Engineer | MR GULABRAO ANANDRAO BHILARE |
| Chartered Accountant | Natwarlal Tawani |
| Chartered Accountant | MALLIKA BHALGAT AND CO. CHARTERED ACCOUNTANTS |
| Chartered Accountant | Vinod Kumar Jindal |
| Partner | Role in project |
|---|---|
| M/S MAJESTIQUE ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Majestique Associates E Building FORM 5.pdf | 5 Dec 2025 |
| Form 1File: Form 1 Nest E.pdf | 26 Nov 2025 |
| Form 2File: Form 2 Nest E.pdf | 26 Nov 2025 |
| Form 3File: Associates FORM 3 Q2.pdf | 26 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Nest -E- Sept 2025.pdf | 26 Nov 2025 |
| Form 1File: FORM 01.pdf | 26 Aug 2025 |
| Form 2File: FORM 02.pdf | 26 Aug 2025 |
| Form 3File: FORM 3_compressed.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec.pdf | 26 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: Nest E-dec 24_compressed.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Nest E- mar 25_compressed.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 12 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 12 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 12 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Nest E building Q3_compressed.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Nest E building Q4_compressed.pdf | 11 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Nest E.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Associates Ca Certificate E Bdlg Q2_compressed.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Associates Ca Certificate E Bdlg Q1_compressed.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 Majestique Associates Building E P52100034017.pdf | 17 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: E-Sold unsold inventory.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certificate Associates.pdf | 24 Jun 2024 |
| Layout approvalFile: PLAN-01-06.pdf | 13 May 2024 |
| Building plan approvalFile: PLAN-05-06-.pdf | 13 May 2024 |
| Building plan approvalFile: PLAN-06-06-.pdf | 13 May 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN-01-06.pdf | 13 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN-05-06-.pdf | 13 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN-06-06-.pdf | 13 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: BP-CC-0177-24 DT 16-04-2024 (1).pdf | 13 May 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 13 May 2024 |
| Disclosure of sold/ booked inventoryFile: Nest -E.pdf | 10 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: E-BLDG CA CERTIFICATE_compressed (1).pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nest - E Building.pdf | 23 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 E Building.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Majestique Associates Form-5 E Building.pdf | 30 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Nest E_compressed.pdf | 18 Jun 2022 |
| Layout approvalFile: 01.pdf | 10 Mar 2022 |
| Building plan approvalFile: 02.pdf | 10 Mar 2022 |
| Building plan approvalFile: 03.pdf | 10 Mar 2022 |
| Building plan approvalFile: 04.pdf | 10 Mar 2022 |
| Building plan approvalFile: 05.pdf | 10 Mar 2022 |
| Building plan approvalFile: 06.pdf | 10 Mar 2022 |
| Building plan approvalFile: 07.pdf | 10 Mar 2022 |
| Building plan approvalFile: 08.pdf | 10 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: 01.pdf | 10 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Majestique Nest Building E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near FURSUNGI13,700+ in Pune
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
Ashtavinayak City Phase - 3
Ashtavinayak City Pune LLP
CELESTIA
Malpani Properties
SAMRUDDHI HEIGHTS
Shree Samruddhi Corporation
Suyog Shrushti
Suyog Developers
Ashtavinayak City Phase - 4
Ashtavinayak Reality
Everra Phase 1
Honcho Properties Private Limited
Builder: M/S MAJESTIQUE ASSOCIATES
M/S MAJESTIQUE ASSOCIATES has 5 registrations on MahaRERA, including Majestique Nest Building A and Majestique Nest Building B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Majestique Nest Building E shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Majestique Nest Building E is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Majestique Nest Building E?
The registered promoter entity is M/S MAJESTIQUE ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Majestique Nest Building E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Majestique Nest Building E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Majestique Nest Building E?
The professionals named in the filing: Architect: MR JAY AERAM; Engineer: MR GULABRAO ANANDRAO BHILARE; Chartered Accountant: Natwarlal Tawani; Chartered Accountant: MALLIKA BHALGAT AND CO. CHARTERED ACCOUNTANTS; Chartered Accountant: Vinod Kumar Jindal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Majestique Nest Building E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback