ReraGenieLog inGet a buyer report

Home / Browse projects / Wardha, Maharashtra / MAJESTIC RESIDENCY

Completed No litigation declared Residential / Group Housing project

MAJESTIC RESIDENCY

By SKYLINE INFRA

RG-MH-56278 · RERA P50400050776 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Wardha registration emailed to you, free during the pilot beta.
Sep 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
4 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

MAJESTIC RESIDENCY is a Residential / Group Housing project by SKYLINE INFRA in Wardha, Maharashtra, registered with MahaRERA as P50400050776 on 3 May 2023. The registration is recorded completed; possession was promised by 30 Sep 2026. The completion date has moved by 9 months from the original filing. 12 of the 16 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameMAJESTIC RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • PALAKWADI WARDHA
    • Palakwadi (Wardha)
    • Wardha
    • 442001
  • Pincode442001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50400050776
  • ReraGenie IDRG-MH-56278

Builder

  • NameSKYLINE INFRA
  • Entity typePartnership
  • PartnersMUSTAFA SAJJAD SAIFEE, ABEDIN HAKIMMUDDIN ESSAJI, NIKESH RAJKUMAR KRIPLANI, VINOD GIRIDHARILAL RATHI, MUSTAFA HAKIMUDDIN ESSAJI, ASHISH PANJABRAO ZODE, FAKHRUDDIN HAKIMUDDIN ESSAJI
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2023First promiseDec 2025Revised toSep 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 May 2023
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed121 files

Current status

75%12 of 16 units booked
100.0%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAJESTIC RESIDENCYNA5416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

MAJESTIC RESIDENCY: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area769 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SKYLINE INFRAWardha (M Cl)Wardha

Approvals and building plan

Sanctioning authorityWardha Municipal Council
Permissible FSI1353.44
Proposed, not sanctioned1,353 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANDHI NAGAR, WARDHA
Estimated costRs 2.85 cr
Cost incurredRs 2.85 cr
Work done100.0%
BuildingWingEstimatedIncurred
MAJESTIC RESIDENCYNARs 2.85 crRs 2.85 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRENIK KHONDE
ArchitectEMANATE DESIGN
EngineerSAGAR NARAWADIYA
Chartered AccountantDARSHAN WAKHARIYA
Chartered AccountantCA ANKIT TALREJA
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
SKYLINE INFRA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03052620816Dec 2025 → Sep 2026

Reason as filed by the promoterWe, MARIGOLD REALITY (Promoter), through our Partner and Authorized Signatory MR. MUSTAFA SAJJAD SAIFEE, of the real estate project “MAJESTIC RESIDENCY”, bearing MahaRERA Registration No. P50400050776, respectfully submit this application seeking an extension of Nine (9) months i.e., up to 30/09/2026 for the completion of the project. The originally declared project completion date under MahaRERA was 31/12/2025. However, we have received the Occupation Certificate (OC) on 09/01/2026. The project experienced minor delays due to: • Delays in obtaining certain statutory approvals and completing p

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 MAJESHTIC RESIDENCY MAR-2026.pdf14 May 2026
Withdrawal Update Form 2File: FORM-2 MAJESTIC RESIDENCY MAR-2026.pdf14 May 2026
Withdrawal Update Form 3File: FORM-3 MAJESTIC RESIDENCY MAR-2026.pdf14 May 2026
Occupational CertificateFile: OCCUPANCY CERTIFICATE.pdf14 May 2026
Form 2A (FY 2025-2026)File: FORM 2A MARCH 2026.pdf4 May 2026
Form 2A (FY 2024-2025)File: FORM 2A.pdf4 May 2026
Form 1File: FORM-1 MAJESTIC RESIDENCY JUN-2023.pdf2 May 2026
Form 2File: FORM-2 MAJESTIC RESIDENCY JUN-2023.pdf2 May 2026
Form 3File: FORM-3 MAJESTIC RESIDENCY JUN-2023.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2023.pdf2 May 2026
Form 1File: FORM-1 MAJESTIC RESIDENCY SEP-2023.pdf2 May 2026
Form 2File: FORM-2 MAJESTIC RESIDENCY SEP-2023.pdf2 May 2026
Form 3File: FORM-3 MAJESTIC RESIDENCY SEP-2023.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPTEMBER 2023.pdf2 May 2026
Form 1File: FORM-1 MAJESTIC RESIDENCY DEC-2023.pdf2 May 2026
Form 2File: FORM-2 MAJESTIC RESIDENCY DEC-2023.pdf2 May 2026
Form 3File: FORM-3 MAJESTIC RESIDENCY DEC-2023.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DECEMBER 2023.pdf2 May 2026
Form 1File: FORM-1 MAJESTIC RESIDENCY MAR-2024.pdf2 May 2026
Form 2File: FORM-2 MAJESTIC RESIDENCY MAR-2024.pdf2 May 2026
Form 3File: FORM-3 MAJESTIC RESIDENCY MAR-2024.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH 2024.pdf2 May 2026
Form 1File: FORM-1 MAJESTIC RESIDENCY JUN-2024.pdf2 May 2026
Form 2File: FORM-2 MAJESTIC RESIDENCY JUN-2024.pdf2 May 2026
Form 3File: FORM-3 MAJESTIC RESIDENCY JUN-2024.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2024.pdf2 May 2026
Form 1File: FORM-1 MAJESTIC RESIDENCY SEP-2024.pdf2 May 2026
Form 2File: FORM-2 MAJESTIC RESIDENCY SEP-2024.pdf2 May 2026
Form 3File: FORM-3 MAJESTIC RESIDENCY SEP-2024.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD SEP-2024.pdf2 May 2026
Form 1File: FORM-1 MAJESTIC RESIDENCY DECEMBER 2024.pdf2 May 2026
Form 2File: FORM-2 MAJESTIC RESIDENCY DEC-2024.pdf2 May 2026
Form 3File: FORM-3 MAJESTIC RESIDENCY DEC-2024.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD DEC-2024.pdf2 May 2026
Form 1File: FORM-1 MAJESTIC RESIDENCY MARCH 2025.pdf2 May 2026
Form 2File: FORM-2 MAJESTIC RESIDENCY MAR-2025.pdf2 May 2026
Form 3File: FORM-3 MAJESTIC RESIDENCY MAR-2025.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MAR-2025.pdf2 May 2026
Withdrawal Update Form 1File: FORM-1 MAJESHTIC RESIDENCY JUN-2025.pdf2 May 2026
Withdrawal Update Form 1File: FORM-1 MAJESHTIC RESIDENCY SEP-2025.pdf2 May 2026
Withdrawal Update Form 1File: FORM-1 MAJESHTIC RESIDENCY DEC-2025.pdf2 May 2026
Withdrawal Update Form 2File: FORM-2 MAJESTIC RESIDENCY JUN-2025.pdf2 May 2026
Withdrawal Update Form 2File: FORM-2 MAJESTIC RESIDENCY SEP-2025.pdf2 May 2026
Withdrawal Update Form 2File: FORM-2 MAJESTIC RESIDENCY DEC-2025.pdf2 May 2026
Withdrawal Update Form 3File: FORM-3 MAJESTIC RESIDENCY JUN-2025.pdf2 May 2026
Withdrawal Update Form 3File: FORM-3 MAJESTIC RESIDENCY SEP-2025.pdf2 May 2026
Withdrawal Update Form 3File: FORM-3 MAJESTIC RESIDENCY DEC-2025.pdf2 May 2026
Form 2A (FY 2023-2024)File: FORM-2A MAJESTIC RESIDENCY MAR-2024.pdf2 May 2026
Form 5 (FY 2024-2025)File: FORM-5 SKYLINE INFRA MAR-25.pdf2 May 2026
Form 5 (FY 2025-2026)File: FORM-5 SKYLINE INFRA MAR-26.pdf2 May 2026
Form 5 (FY 2023-2024)File: FORM-5 MAJESTIC RESIDENCY MAR-2024.pdf2 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MR F1.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MR F3.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MR F2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: MR Sold.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 MAJESTIC RESIDENCY 13-10-2024 (1).pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 MAJESTIC RESIDENCY 07-07-2024_page-0001.pdf17 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Majestic Residency_Form-2-Engineers Certificate_June-23.pdf17 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Majestic Residency_Form-2-Engineers Certificate_Sep-23.pdf17 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Majestic Residency_Form-2-Engineers Certificate_Dec-23.pdf17 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Majestic Residency_Form-2-Engineers Certificate_Mar-24.pdf17 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Majestic Residency_Form-2-Engineers Certificate_june-24.pdf17 Aug 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD MAJESTIC RESIDENCY.pdf17 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE-24.pdf17 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Majestic Residency_Form-1- Architect Certificate_June-23.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Majestic Residency_Form-1- Architect Certificate_Sep-23.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Majestic Residency_Form-1- Architect Certificate_Dec-23.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Majestic Residency_Form-1- Architect Certificate_Mar-24.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Majestic Residency_Form-2-Engineers Certificate_June-23.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Majestic Residency_Form-2-Engineers Certificate_Sep-23.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Majestic Residency_Form-2-Engineers Certificate_Dec-23.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Majestic Residency_Form-2-Engineers Certificate_Mar-24.pdf14 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Majestic Residency_RERA_Form 2A_MAR-24.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: June-23.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: Sep-23.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: Dec-23.pdf14 May 2024
Disclosure of sold/ booked inventoryFile: Mar-24.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE-23.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEP-23.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec-23.pdf14 May 2024

How this compares with Wardha

75%of this project is bookeddistrict median 0%
5%of Wardha projects moved their completion datethis one moved by 9 months
18%of Wardha registrations have lapsed or been cancelledthis one is completed

Computed across the 290+ Wardha projects on ReraGenie, from their own filings.

Keep MAJESTIC RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALAKWADI WARDHA290+ in Wardha

2 kmMAJESTIC RESIDENCYCompleted 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: SKYLINE INFRA

Skyline Infra has 5 registrations on MahaRERA, including Shlok Heritage and MAJESTIC RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Wardha district page.

Frequently asked questions

What are my rights if MAJESTIC RESIDENCY is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAJESTIC RESIDENCY?

The registered promoter entity is SKYLINE INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAJESTIC RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAJESTIC RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAJESTIC RESIDENCY?

The professionals named in the filing: Architect: SHRENIK KHONDE; Architect: EMANATE DESIGN; Engineer: SAGAR NARAWADIYA; Chartered Accountant: DARSHAN WAKHARIYA; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAJESTIC RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAJESTIC RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAJESTIC RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.