Home / Browse projects / Mumbai Suburban, Maharashtra / Maitri Enclave

Registered No litigation declared Residential / Group Housing project

Maitri Enclave

By Atharva Enterprises

RG-MH-06601 · RERA P51800053925 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
74 of 79Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Maitri Enclave is a Residential / Group Housing project by Atharva Enterprises in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053925 on 11 Dec 2023. Possession is promised by 31 Dec 2026. 5 of the 79 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameMaitri Enclave
  • TypeResidential / Group Housing
  • Location
    • Santacruz East
    • Kolekalyan
    • Andheri
    • Mumbai Suburban
    • 400055
  • Pincode400055
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800053925
  • ReraGenie IDRG-MH-06601

Builder

  • NameAtharva Enterprises
  • Entity typePartnership
  • PartnersRuturaj Jayant Kulkarni, Pravin Ravji Chopda, Mohan Ambalal Chauhan, Daksh Pravin Chopda, Jayant Bhalchandra Kulkarni, Jignesh Ambalal Chauhan, Neelesh Vinayak ketkar
  • Other registrations5 more →
  • Completed4 of 6
  • Declared earlier projects6 →

Key dates

this monthRegisteredDec 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed109 files

Current status

6%5 of 79 units booked
4.2%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Maitri Enclave - Wing ANA7518018
Maitri Enclave - Wing BNA8726026
Maitri Enclave - Wing CNA10935035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Maitri Enclave - Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Maitri Enclave - Wing B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Maitri Enclave - Wing C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered52
BuildingClosed/CoveredTotal
Maitri Enclave - Wing A1919
Maitri Enclave - Wing B1717
Maitri Enclave - Wing C1616

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,879 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
SBI Staff Maitrimurti Co-Operative Hsg Soc LtdKolekalyanMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3928.22
Proposed, not sanctioned3,928 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 4,5,6GROUND FLOOR,RAZMAH BUILDING,L J ROMATUNGA WEST,
Estimated costRs 16.49 cr
Cost incurredRs 68.97 lakh
Work done4.18%
BuildingWingEstimatedIncurred
Maitri Enclave - Wing BNARs 6.24 crRs 26.11 lakh
Maitri Enclave - Wing CNARs 5.77 crRs 24.15 lakh
Maitri Enclave - Wing ANARs 4.47 crRs 18.71 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Sumedha Gore
EngineerSunnyraj R Shinde
Chartered AccountantUmang Doshi & Associates
Chartered AccountantShamkant Trimbak Deshpande
PartnerRole in project
Atharva Enterprises-

Litigation declared1

CaseCourtStatus
858/2015/2015CIVIL COURT DINDOSHISUIT PENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate Form 1.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q4 25-26.pdf20 Jun 2026
Withdrawal Update Form 3File: FORM 3_Q4 FY 2025-26.pdf20 Jun 2026
Form 2A (FY 2025-2026)File: FORM 2A_FY 2025-26.pdf20 Jun 2026
Form 2A (FY 2024-2025)File: FORM 2A_FY 2024-25.pdf20 Jun 2026
Form 5 (FY 2023-2024)File: FORM 5 For FY 2023-24.pdf20 Jun 2026
Form 5 (FY 2024-2025)File: FORM 5 For FY 2024-25.pdf20 Jun 2026
Layout approvalFile: amended approval plan_Highlighted revised_Compressed.pdf13 Feb 2026
Withdrawal Update Form 1File: FORM 1_Q3 FY 25-26.pdf13 Feb 2026
Withdrawal Update Form 2File: FORM 2_Q3 of FY 25-26.pdf13 Feb 2026
Withdrawal Update Form 3File: form 3_Q3_FY 25-26.pdf13 Feb 2026
Withdrawal Update Form 1File: FORM 1_Q2.pdf31 Jan 2026
Withdrawal Update Form 2File: FORM 2_Q2.pdf31 Jan 2026
Withdrawal Update Form 3File: FORM 3_Q2_compressed.pdf31 Jan 2026
Layout approvalFile: amended approval plan_Full_Compressed.pdf27 Oct 2025
Form 1File: Form 1 Q1 2025.pdf26 Aug 2025
Form 2File: Form 2 Q1 2025.pdf26 Aug 2025
Form 3File: ATH ENT RERA FNO 3 Q1 YE 2026.pdf26 Aug 2025
Disclosure of Sold and Booked InventoryFile: ATH ENT PROMOTER CERT Q1 YE 2026-DIGI SIGN.pdf26 Aug 2025
Form 1File: Form 1 Dec 2023.pdf23 Jun 2025
Form 2File: NO-2- FORM2A- MAITRI ENCLAVE- 31-12-2023.pdf23 Jun 2025
Form 3File: ATH ENT FORM 3 Q3 YE 2024.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q-3-2023-24- BOOK INVENTORY- AE.pdf23 Jun 2025
Form 1File: UP TO MAR 2024.pdf23 Jun 2025
Form 2File: NO-3-FORM2A-MAITRI ENCLAVE-31-3-2024.pdf23 Jun 2025
Form 3File: ATH ENT FORM 3 Q4 YE 2024_compressed.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q-4- 2023-24- BOOK INVENTORY- AE.pdf23 Jun 2025
Form 1File: UP TO JUNE 2024.pdf23 Jun 2025
Form 2File: NO-4- FORM2A- MAITRI ENCLAVE-30-6-2024.pdf23 Jun 2025
Form 3File: Ath Ent RERA Form 3 Q1 YE 25.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q-1-2024-25- BOOK INVENTORY- AE .pdf23 Jun 2025
Form 1File: UP TO SEP 2024.pdf23 Jun 2025
Form 2File: NO-5-FORM2A- MAITRI ENCLAVE- 30-9-2024.pdf23 Jun 2025
Form 3File: Ath Ent RERA Form 3 Q2 YE 25.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q-2-2024-25- BOOK INVENTORY- AE .pdf23 Jun 2025
Form 1File: architect certificate- AE- upto 31-12-24.pdf23 Jun 2025
Form 2File: F- 2A- Q3- 24-25AE.pdf23 Jun 2025
Form 3File: 1- ATH ENT F NO 3 RERA Q3 YE 2025_compressed.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q-3-2023-24- BOOK INVENTORY- AE.pdf23 Jun 2025
Form 1File: architect certificate - AE upto-31-03-2025.pdf23 Jun 2025
Form 2File: f-2- Q-4-24-25 AE.pdf23 Jun 2025
Form 3File: Form 3 Q4 24-25.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q-4-2024-25- BOOK INVENTORY- AE .pdf23 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2023.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2023.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 maitri enclave 07- 09 2023.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 maitri enclave 01072024-30092024.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form maitri enclave- 01042024-30062024.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 maitri enclave 01012024-31032024.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 maitri enclave 01102023-31122023.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-1-form 2A- MAITRI ENCLAVE- 30-9-23.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-2- FORM2A- MAITRI ENCLAVE- 31-12-2023.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-3-FORM2A-MAITRI ENCLAVE-31-3-2024.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-4- FORM2A- MAITRI ENCLAVE-30-6-2024.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-5-FORM2A- MAITRI ENCLAVE- 30-9-2024.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ath Ent RERA Form 3 Q1 YE 25.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ath Ent RERA Form 3 Q2 YE 25.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UP TO JUNE 2024.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UP TO SEP 2024.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UP TO MAR 2024.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ATH ENT FORM 3 Q2 YE 2024.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ATH ENT FORM 3 Q3 YE 2024.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ATH ENT FORM 3 Q4 YE 2024_compressed.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Wing B Plinth Commencement Certificate CC.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate | Maitri Enclave | Atharva Enterprises.pdf8 Jul 2024
Details of encumbrances concerned to FinanceFile: Annexure K.pdf10 Nov 2023
Details of encumbrances concerned to LegalFile: Annexure K.pdf10 Nov 2023
Layout approvalFile: IOD_Intimation Of Disapproval.pdf7 Nov 2023
Copy of Layout Approval (in case of layout)File: IOD_Intimation Of Disapproval.pdf7 Nov 2023
Copy of the legal title reportFile: Legal Title Report New.pdf6 Nov 2023
Layout approvalFile: Layout_Part_1.pdf28 Oct 2023
Layout approvalFile: Layout_Part_2.pdf28 Oct 2023
Layout approvalFile: Layout_Part_3.pdf28 Oct 2023
Layout approvalFile: Layout_Part_4.pdf28 Oct 2023
Layout approvalFile: Layout_Part_5.pdf28 Oct 2023
Layout approvalFile: Layout_Part_6.pdf28 Oct 2023
Building plan approvalFile: CC.pdf28 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout_Part_1.pdf28 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout_Part_2.pdf28 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout_Part_3.pdf28 Oct 2023

How this compares with Mumbai Suburban

6%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Maitri Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Santacruz East6,700+ in Mumbai Suburban

2 kmMaitri EnclaveCompleted 67Lapsed / revoked 51Other 96Dot size: filed unitsN

Filed coordinates, straight-line distance. 214 registered projects within 2 km.

Builder: Atharva Enterprises

Atharva Enterprises has 6 registrations on MahaRERA, including TruSpace Prima Domus Phase 1 and TruSpace Prima Domus Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Maitri Enclave is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Maitri Enclave?

The registered promoter entity is Atharva Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Maitri Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Maitri Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Maitri Enclave?

The professionals named in the filing: Architect: Ar. Sumedha Gore; Engineer: Sunnyraj R Shinde; Chartered Accountant: Umang Doshi & Associates; Chartered Accountant: Shamkant Trimbak Deshpande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Maitri Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Maitri Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Maitri Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.