Home / Browse projects / Mumbai Suburban, Maharashtra / Maitri Enclave
Maitri Enclave
RG-MH-06601 · RERA P51800053925 · Last updated on MahaRERA portal: 20 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Maitri Enclave is a Residential / Group Housing project by Atharva Enterprises in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053925 on 11 Dec 2023. Possession is promised by 31 Dec 2026. 5 of the 79 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.
At a glance
Project
- NameMaitri Enclave
- TypeResidential / Group Housing
- Location
- Santacruz East
- Kolekalyan
- Andheri
- Mumbai Suburban
- 400055
- Pincode400055
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800053925
- ReraGenie IDRG-MH-06601
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Dec 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings3 building records
- Documents filed109 files
Current status
Figures as on 20 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Maitri Enclave - Wing A | NA | 7 | 5 | 18 | 0 | 18 |
| Maitri Enclave - Wing B | NA | 8 | 7 | 26 | 0 | 26 |
| Maitri Enclave - Wing C | NA | 10 | 9 | 35 | 0 | 35 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.
Maitri Enclave - Wing A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Maitri Enclave - Wing B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Maitri Enclave - Wing C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed52
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Maitri Enclave - Wing A | 19 | 19 |
| Maitri Enclave - Wing B | 17 | 17 |
| Maitri Enclave - Wing C | 16 | 16 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SBI Staff Maitrimurti Co-Operative Hsg Soc Ltd | Kolekalyan | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Maitri Enclave - Wing B | NA | Rs 6.24 cr | Rs 26.11 lakh |
| Maitri Enclave - Wing C | NA | Rs 5.77 cr | Rs 24.15 lakh |
| Maitri Enclave - Wing A | NA | Rs 4.47 cr | Rs 18.71 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Sumedha Gore |
| Engineer | Sunnyraj R Shinde |
| Chartered Accountant | Umang Doshi & Associates |
| Chartered Accountant | Shamkant Trimbak Deshpande |
| Partner | Role in project |
|---|---|
| Atharva Enterprises | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 858/2015/2015 | CIVIL COURT DINDOSHI | SUIT PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed109
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate Form 1.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Q4 25-26.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3_Q4 FY 2025-26.pdf | 20 Jun 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A_FY 2025-26.pdf | 20 Jun 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A_FY 2024-25.pdf | 20 Jun 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 For FY 2023-24.pdf | 20 Jun 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 For FY 2024-25.pdf | 20 Jun 2026 |
| Layout approvalFile: amended approval plan_Highlighted revised_Compressed.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1_Q3 FY 25-26.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2_Q3 of FY 25-26.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: form 3_Q3_FY 25-26.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1_Q2.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2_Q2.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_Q2_compressed.pdf | 31 Jan 2026 |
| Layout approvalFile: amended approval plan_Full_Compressed.pdf | 27 Oct 2025 |
| Form 1File: Form 1 Q1 2025.pdf | 26 Aug 2025 |
| Form 2File: Form 2 Q1 2025.pdf | 26 Aug 2025 |
| Form 3File: ATH ENT RERA FNO 3 Q1 YE 2026.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: ATH ENT PROMOTER CERT Q1 YE 2026-DIGI SIGN.pdf | 26 Aug 2025 |
| Form 1File: Form 1 Dec 2023.pdf | 23 Jun 2025 |
| Form 2File: NO-2- FORM2A- MAITRI ENCLAVE- 31-12-2023.pdf | 23 Jun 2025 |
| Form 3File: ATH ENT FORM 3 Q3 YE 2024.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q-3-2023-24- BOOK INVENTORY- AE.pdf | 23 Jun 2025 |
| Form 1File: UP TO MAR 2024.pdf | 23 Jun 2025 |
| Form 2File: NO-3-FORM2A-MAITRI ENCLAVE-31-3-2024.pdf | 23 Jun 2025 |
| Form 3File: ATH ENT FORM 3 Q4 YE 2024_compressed.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q-4- 2023-24- BOOK INVENTORY- AE.pdf | 23 Jun 2025 |
| Form 1File: UP TO JUNE 2024.pdf | 23 Jun 2025 |
| Form 2File: NO-4- FORM2A- MAITRI ENCLAVE-30-6-2024.pdf | 23 Jun 2025 |
| Form 3File: Ath Ent RERA Form 3 Q1 YE 25.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q-1-2024-25- BOOK INVENTORY- AE .pdf | 23 Jun 2025 |
| Form 1File: UP TO SEP 2024.pdf | 23 Jun 2025 |
| Form 2File: NO-5-FORM2A- MAITRI ENCLAVE- 30-9-2024.pdf | 23 Jun 2025 |
| Form 3File: Ath Ent RERA Form 3 Q2 YE 25.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q-2-2024-25- BOOK INVENTORY- AE .pdf | 23 Jun 2025 |
| Form 1File: architect certificate- AE- upto 31-12-24.pdf | 23 Jun 2025 |
| Form 2File: F- 2A- Q3- 24-25AE.pdf | 23 Jun 2025 |
| Form 3File: 1- ATH ENT F NO 3 RERA Q3 YE 2025_compressed.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q-3-2023-24- BOOK INVENTORY- AE.pdf | 23 Jun 2025 |
| Form 1File: architect certificate - AE upto-31-03-2025.pdf | 23 Jun 2025 |
| Form 2File: f-2- Q-4-24-25 AE.pdf | 23 Jun 2025 |
| Form 3File: Form 3 Q4 24-25.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q-4-2024-25- BOOK INVENTORY- AE .pdf | 23 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2023.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2023.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 maitri enclave 07- 09 2023.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 maitri enclave 01072024-30092024.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form maitri enclave- 01042024-30062024.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 maitri enclave 01012024-31032024.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 maitri enclave 01102023-31122023.pdf | 24 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-1-form 2A- MAITRI ENCLAVE- 30-9-23.pdf | 24 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-2- FORM2A- MAITRI ENCLAVE- 31-12-2023.pdf | 24 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-3-FORM2A-MAITRI ENCLAVE-31-3-2024.pdf | 24 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-4- FORM2A- MAITRI ENCLAVE-30-6-2024.pdf | 24 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NO-5-FORM2A- MAITRI ENCLAVE- 30-9-2024.pdf | 24 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ath Ent RERA Form 3 Q1 YE 25.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ath Ent RERA Form 3 Q2 YE 25.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UP TO JUNE 2024.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UP TO SEP 2024.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UP TO MAR 2024.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ATH ENT FORM 3 Q2 YE 2024.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ATH ENT FORM 3 Q3 YE 2024.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ATH ENT FORM 3 Q4 YE 2024_compressed.pdf | 10 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Wing B Plinth Commencement Certificate CC.pdf | 10 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate | Maitri Enclave | Atharva Enterprises.pdf | 8 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Annexure K.pdf | 10 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Annexure K.pdf | 10 Nov 2023 |
| Layout approvalFile: IOD_Intimation Of Disapproval.pdf | 7 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: IOD_Intimation Of Disapproval.pdf | 7 Nov 2023 |
| Copy of the legal title reportFile: Legal Title Report New.pdf | 6 Nov 2023 |
| Layout approvalFile: Layout_Part_1.pdf | 28 Oct 2023 |
| Layout approvalFile: Layout_Part_2.pdf | 28 Oct 2023 |
| Layout approvalFile: Layout_Part_3.pdf | 28 Oct 2023 |
| Layout approvalFile: Layout_Part_4.pdf | 28 Oct 2023 |
| Layout approvalFile: Layout_Part_5.pdf | 28 Oct 2023 |
| Layout approvalFile: Layout_Part_6.pdf | 28 Oct 2023 |
| Building plan approvalFile: CC.pdf | 28 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Layout_Part_1.pdf | 28 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Layout_Part_2.pdf | 28 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Layout_Part_3.pdf | 28 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 109 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Maitri Enclave on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Santacruz East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 214 registered projects within 2 km.
ATMIYA CENTRIA
UPTURN PROPERTIES LLP
NINE ARCS
ARIHANT CONSTRUCTION CO
Trinity Towers
Jet Speed Realtors Private Limited
Bluemoon Annexe
MUDASSAR BUILDERS & DEVELOPERS
W55
DVASUYASH CONSTRUCTION 1 LLP
Sumit Bhakti
Sumit Pragati Ventures LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Atharva Enterprises
Atharva Enterprises has 6 registrations on MahaRERA, including TruSpace Prima Domus Phase 1 and TruSpace Prima Domus Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Maitri Enclave is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Maitri Enclave?
The registered promoter entity is Atharva Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Maitri Enclave?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Maitri Enclave?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Maitri Enclave?
The professionals named in the filing: Architect: Ar. Sumedha Gore; Engineer: Sunnyraj R Shinde; Chartered Accountant: Umang Doshi & Associates; Chartered Accountant: Shamkant Trimbak Deshpande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Maitri Enclave?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback