Home / Browse projects / Raigarh, Maharashtra / Mahindra The Serenes- 8 Villas
Mahindra The Serenes- 8 Villas
By Mahindra Lifespace Developers limited
RG-MH-10902 · RERA P52000000461 · Last updated on MahaRERA portal: 24 Jul 2024
Source: official MahaRERA filing
Red flags
- Completion date moved by 2 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mahindra The Serenes- 8 Villas is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Raigarh, Maharashtra, registered with MahaRERA as P52000000461 on 18 Jul 2017. The registration is recorded completed; possession was promised by 16 Aug 2018. The completion date has moved by 2 months from the original filing.
At a glance
Project
- NameMahindra The Serenes- 8 Villas
- TypeResidential / Group Housing
- Location
- --
- Nagaon
- Alibag
- Raigarh
- 402204
- Pincode402204
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000000461
- ReraGenie IDRG-MH-10902
Builder
- NameMahindra Lifespace Developers limited
- Entity typeCompany
- CINL45200MH1999PLC118949
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- ChairpersonArun Kumar Tilak Raj Nanda
- Managing DirectorArvind Subramanian
- Other registrations66 more →
- Completed25 of 67
- No longer live20 lapsed, de-registered or revoked
- Declared earlier projects66 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Jul 2017
- Promised completion16 Aug 2018
- Revised completionRevised to 16 Aug 2018 (originally 30 Jun 2018)
- Buildings8 building records
- Documents filed38 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Villa 1 | NA | 2 | 0 | 0 | 0 | 0 |
| Villa 2 | NA | 2 | 0 | 0 | 0 | 0 |
| Villa 3 | NA | 2 | 0 | 0 | 0 | 0 |
| Villa 5 | NA | 2 | 0 | 0 | 0 | 0 |
| Villa 6 | NA | 2 | 0 | 0 | 0 | 0 |
| Villa 12 | NA | 2 | 0 | 0 | 0 | 0 |
| Villa 15 | NA | 2 | 0 | 0 | 0 | 0 |
| Villa 18 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 24 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
72 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 0%.
Villa 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Villa 282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Villa 382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Villa 582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Villa 682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Villa 1282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Villa 1582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Villa 1882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 80% |
| Community Buildings | Yes | 80% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed16
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Villa 1 | 2 | 2 |
| Villa 2 | 2 | 2 |
| Villa 3 | 2 | 2 |
| Villa 5 | 2 | 2 |
| Villa 6 | 2 | 2 |
| Villa 12 | 2 | 2 |
| Villa 15 | 2 | 2 |
| Villa 18 | 2 | 2 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Abhijit mohite |
| Engineer | H.M.Raje Structural Consultants Pvt. Ltd. |
| Partner | Role in project |
|---|---|
| Mahindra Lifespace Developers limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) OC scrutiny is in process at the respective authority since more than a month.we are expecting the OC by 30th July 18.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| NIL/2018 | Deputy Commissioner Of Income Tax | Hearing In Progress |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Dec 2019
Documents filed38
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MLDL SERENES VILLA 08_ALIBAUG_JUN'24-Final.pdf | 24 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MLDL SERENES VILLA 08_ALIBAUG_JUN'24-Final.pdf | 24 Jul 2024 |
| Certificates of CA (Form 5)File: 8 Villas.pdf | 26 Dec 2019 |
| Architect’s Certificate on Completion of Project (Form 4)File: 191220_The Serenes - 8 Villas-min.pdf | 22 Dec 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Certificate_compressed_reduce.pdf | 10 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_The Serenes_08 Villas_compressed.pdf | 30 Jul 2019 |
| Certificates of CA (Form 3)File: The Serenes 8 Villas CA July 2019_compressed.pdf | 30 Jul 2019 |
| Certificates of CA (Form 3)File: Serene Certificate villas8.pdf | 30 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Serenes 8 Villas Certificate.pdf | 23 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R1 8 Villas - Architecture Certificate Sept 2018.pdf | 9 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: R1 Serenes Villa 8 CA Certificate Sept 18.pdf | 9 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-THE SERENES 8 VILLAS.pdf | 9 Nov 2018 |
| Certificates of CA (Form 3)File: R1 Serenes Villa 8 CA Certificate Sept 18.pdf | 9 Nov 2018 |
| Certificates of CA (Form 5)File: Serenes.pdf | 9 Oct 2018 |
| Certificates of CA (Form 3)File: CA certificate-Q1 fy 19.pdf | 8 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate - June 2018 - 8 Villas.pdf | 4 Aug 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- June 2018- 8 Villas.pdf | 4 Aug 2018 |
| Certificates of CA (Form 3)File: Serenes CA_8 Villas_ Mar 2018.pdf | 23 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Serenes Arch Certi Mar'18.pdf | 19 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate of Serenes 8 Villas.pdf | 19 Apr 2018 |
| Certificates of CA (Form 3)File: 8 Villas.pdf | 10 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Serenes Arch Certi Dec'17.pdf | 1 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi 8 Villas Dec'17.pdf | 1 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Serenes - Architect Certificate - Sept'17.pdf | 20 Dec 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Serenes - Engg certi sept'17.pdf | 20 Dec 2017 |
| Layout approvalFile: Final layout.pdf | 15 Jul 2017 |
| Building plan approvalFile: NA Order.pdf | 15 Jul 2017 |
| PAN CardFile: PAN .pdf | 15 Jul 2017 |
| Copy of the legal title reportFile: Alibaug Title Certificate.pdf | 15 Jul 2017 |
| Details of encumbrancesFile: LETTER OF ENCUMBRANCES.PDF | 15 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Final layout.pdf | 15 Jul 2017 |
| Building Plan Approval (IOD)File: NA Order.pdf | 15 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf | 15 Jul 2017 |
| Declaration in FORM BFile: Form B.pdf | 15 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Serenes 8 Villas - Arch Certi.pdf | 15 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Serenes 8 Villas - Engineer Certificate.pdf | 15 Jul 2017 |
| Certificates of CA (Form 3)File: Serenes 8 Villas - CA Certi.pdf | 15 Jul 2017 |
| Proforma of Allotment letterFile: Allotment letter and Agreement For Sale.pdf | 15 Jul 2017 |
Promoter's earlier projects16
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Windchimes | Mahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075 | 454 | Completed | Dec 2018 | Dec 2018 |
| Boisar Phase II | Gut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar | 238 | Completed | Dec 2017 | Jun 2017 |
| BOISAR Phase I | Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar | 359 | Completed | Jun 2017 | Jan 2017 |
| Lartista | Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018 | 21 | Completed | Sep 2016 | Sep 2016 |
| Avadi Phase I | Block No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee | 604 | Completed | Jun 2016 | Apr 2016 |
| Ashvita | Mahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072 | 664 | Completed | Jun 2016 | May 2016 |
| Aura PH5 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 150 | Completed | Jan 2015 | Late, Sep 2016 |
| Aura PH4 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 142 | Completed | Jan 2015 | Late, Dec 2015 |
| Aura PH3 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 110 | Completed | Oct 2014 | Late, Aug 2015 |
| Aura PH2 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 166 | Completed | Nov 2013 | Late, Oct 2014 |
| Splendour Phase 2 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re | 233 | Completed | Nov 2013 | Jun 2013 |
| Aura PH1 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 231 | Completed | May 2013 | May 2013 |
| Angelica | Bldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai | 67 | Completed | Mar 2013 | Mar 2013 |
| Aspen | Bldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai | 68 | Completed | Dec 2012 | Dec 2012 |
| Splendour Phase 1 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078 | 265 | Completed | Aug 2011 | Aug 2011 |
| Chloris | Milestone 16 PART 3 Sector 19 Faridabad | 160 | Completed | Jul 2011 | Jul 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 66 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 38 filed documents as one ZIP, foldered, with a manifest
Keep Mahindra The Serenes- 8 Villas on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nagaon5,900+ in Raigarh
Filed coordinates, straight-line distance. 22 registered projects within 2 km.
Cidade Vida
Bhide Lifespaces
Aqua Shores
Dynamix Vacation Resorts Private Limited
AQUA SUITES
Dynamix Vacation Resorts Private Limited
Creata Harmony
Creata lifespaces LLp
Coral Bay
Dynamix Vacation Resorts Private Limited
Aqua Bliss
Dynamix Vacation Resorts Private Limited
See every Raigarh project, with the district possession charts
Builder: Mahindra Lifespace Developers limited
Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Mahindra The Serenes- 8 Villas is delayed beyond 16 Aug 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mahindra The Serenes- 8 Villas?
The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mahindra The Serenes- 8 Villas?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mahindra The Serenes- 8 Villas?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mahindra The Serenes- 8 Villas?
The professionals named in the filing: Architect: Abhijit mohite; Engineer: H.M.Raje Structural Consultants Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mahindra The Serenes- 8 Villas?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback