Home / Browse projects / Raigarh, Maharashtra / Cidade Vida

Registered No litigation declared Residential / Group Housing project

Cidade Vida

By Bhide Lifespaces

RG-MH-95350 · RERA P52000012762 · Last updated on MahaRERA portal: 8 May 2026

Source: official MahaRERA filing

Red flags

  • 13 complaints at MahaRERA
  • Completion date moved by 120 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 120 months from the original
22 of 99Construction stages doneacross 9 buildings; furthest along: Slabs of Super Structure, 75%
114 of 231Units unsoldnot recorded sold or booked
13Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

Cidade Vida is a Residential / Group Housing project by Bhide Lifespaces in Raigarh, Maharashtra, registered with MahaRERA as P52000012762 on 7 Sep 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 120 months from the original filing. 117 of the 231 units on this registration are recorded sold or booked, and 22 of 99 construction stages are filed complete. 13 complaints are on record with the regulator.

At a glance

Project

  • NameCidade Vida
  • TypeResidential / Group Housing
  • Location
    • Off. Alibag-Roha Road
    • Tal Village
    • Kawir
    • Alibag
    • Raigarh
    • 402204
  • Pincode402204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000012762
  • ReraGenie IDRG-MH-95350

Builder

  • NameBhide Lifespaces
  • Entity typePartnership
  • GSTIN27ABAFB9994K1ZR
  • PartnersPratik Chandrakant Bhide, Chandrakant Shankar Bhide
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2017First promiseDec 2019Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Sep 2017
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2019)
  • Buildings9 building records
  • Documents filed120 files

Current status

51%117 of 231 units booked
23.6%Work done, per cost certificate

Figures as on 8 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA4348048
BUILDING NO 2NA4324024
BUILDING NO 3NA4324024
BUILDING NO 4NA4327027
BUILDING NO 5NA4324024
BUILDING NO 6NA4030030
BUILDING NO 7NA40606
BUILDING NO 8ANA4024024
BUILDING NO 8BNA4024024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

BUILDING NO 145%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 243%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 341%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 443%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 545%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 8A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 8B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area19,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Sep 2024

Approvals and building plan

Sanctioning authorityCollector, Raigad
Permissible FSI11798.0
Proposed, not sanctioned11,798 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHODBUNDER ROAD THANE
Estimated costRs 19.91 cr
Cost incurredRs 4.69 cr
Work done23.56%
BuildingWingEstimatedIncurred
BUILDING NO 1NARs 4.49 crRs 1.53 cr
-NARs 3.98 cr-
BUILDING NO 3NARs 3.02 crRs 83.13 lakh
BUILDING NO 4NARs 3.02 crRs 83.13 lakh
BUILDING NO 5NARs 2.80 crRs 95.08 lakh
BUILDING NO 2NARs 2.60 crRs 55.24 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSujata Mhatre
EngineerSameer S Jeste
EngineerSameer Jeste
Chartered AccountantSiddhant R Shetty
Chartered AccountantJagdish & Harish
Chartered AccountantShekhar Kulkarni
PartnerRole in project
Bhide Lifespaces-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000025479Dec 2019 → Dec 2029

Reason as filed by the promoterThe project was registered by previous promoters Disha Direct Marketing Services Pvt Ltd with original date of completion of the project as 31st December 2019. Previous promoters did not complete the project before due date. They had availed a project loan from Pune People's Co-operative Bank Ltd which turned NPA in 2017 after which the bank took necessary actions under SARFAESI Act 2002 and put the project land with development rights for sale. We, New promoters, Bhide Lifespaces took the consent of 95 allottees of the project and purchased the said project land with development rights from t

Complaints filed with MahaRERA13

Case no.ComplainantRespondentFiled
CC006000000055030Mr. Pradnesh Prashant JadhavM/s Disha Direct Marketing Services Pvt. Ltd.05/07/2018
CC006000000000871SHRIDHAR KAMATSantosh Naik24/09/2017
CC006000000055820SHRIDHAR KAMATM/S DISHA DIRECT MARKETING AGENCY SERVICES PVT. LTD.15/08/2018
CC006000000012538Kalpana BerdeDisha Direct Mktg. services Pvt. Ltd.21/12/2017
CC006000000056298Carmeline FernandesDisha Direct Marketing Services Pvt Ltd12/10/2018
CC006000000057107Mr. Sanjay D. JadhavDisha Direct Marketing Services Private Limited30/11/2018
CC006000000057304Suchitra Vijaykumar TeloreDish Direct Marketing Services Pvt Ltd14/12/2018
CC006000000057408Saurabh RanadiveSantosh Pandurang Naik22/12/2018
CC006000000057851GERIUS FERNANDESMr. SANTOSH NAIK (DISHA DIRECT MARKETING SERVICES)30/01/2019
CC006000000120963Shri Venkatesh Tukaram MungapatilDisha Direct Marketing Services Pvt Ltd18/09/2019
CC006000000079472Cida De Vida Apartment Owners AssociationDisha Direct Marketing Services Pvt Ltd26/05/2019
CC006000000195255Cida De Vida Apartment owners associationDisha Direct Marketing Services Pvt Ltd16/12/2020
CC006000000089835RaviKrishnan VenkataramanDisha Direct Marketing Services Pvt Ltd23/06/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 (Architect) - Cidade Vida Mar26.pdf8 May 2026
Form 2File: Form 2 (Engineer) - Cidade Vida Mar26.pdf8 May 2026
Form 3File: Form 3 (CA) - Cidade Vida Mar26.pdf8 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Mar26.pdf8 May 2026
Form 1File: Form 1 RERA Cidade Vida DEC-25.pdf31 Jan 2026
Form 2File: Form 2 RERA Cidade Vida Dec-25.pdf31 Jan 2026
Form 3File: Form 3 RERA Cidade Vida Dec-25.pdf31 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Dec-25.pdf31 Jan 2026
Form 1File: Form 1 (Architect) - Cidade Vida Sept'25.pdf15 Dec 2025
Form 2File: Form-2_Engineers_Certificate_RERA_300925.pdf15 Dec 2025
Form 3File: Form 3 (CA) - Cidade Vida Sept'25.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Sept'25.pdf15 Dec 2025
Form 1File: Form 1 (Architect) - Cidade Vida Jun'25.pdf22 Jul 2025
Form 2File: Form 2 (Engineer) - Cidade Vida Jun'25.pdf22 Jul 2025
Form 3File: Form 3 (CA) - Cidade Vida Jun'25.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Jun'25.pdf22 Jul 2025
Form 1File: Form 1 (Architect) - Cidade Vida Mar'25.pdf18 Jul 2025
Form 2File: Form 2 (Engineer) - Cidade Vida Mar'25.pdf18 Jul 2025
Form 3File: Form 3 (CA)- Cidade Vida Mar'25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Mar'25.pdf18 Jul 2025
Form 1File: Form 1 - Cidade Vida Mar'24.pdf5 Jul 2025
Form 2File: Form 2 - Cidade Vida Mar'24.pdf5 Jul 2025
Form 3File: Form 3 - Cidade Vida Mar 24.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory-Mar24.pdf5 Jul 2025
Form 1File: Form 1 - Cidade Vida Jun'24.pdf5 Jul 2025
Form 2File: Form 2 - Cidade Vida Jun'24.pdf5 Jul 2025
Form 3File: Form 3 - Cidade Vida Jun'24.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold& Booked Inventory-Jun24.pdf5 Jul 2025
Form 1File: Form 1 - Cidade Vida Sept'24.pdf5 Jul 2025
Form 2File: Form 2 - Cidade Vida Sept'24.pdf5 Jul 2025
Form 3File: Form 3 - Cidade Vida Sept'24.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold _booked inventory Sept24.pdf5 Jul 2025
Form 1File: Form 1 - Cidade Vida Dec'24.pdf5 Jul 2025
Form 2File: Form 2 - Cidade Vida Dec'24.pdf5 Jul 2025
Form 3File: Form 3 - Cidade Vida Dec'24.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory Dec24.pdf5 Jul 2025
Building plan approvalFile: Sanctioned Plan - Bldg 1 2 Cidade Vida - Compressed-Copy.pdf25 Jun 2024
Building plan approvalFile: Sanctioned Plan - Bldg 3 4 5 Cidade Vida.pdf25 Jun 2024
Building Plan Approval (IOD)File: Sanctioned Plan - Bldg 1 2 Cidade Vida - Compressed-Copy.pdf25 Jun 2024
Building Plan Approval (IOD)File: Sanctioned Plan - Bldg 3 4 5 Cidade Vida.pdf25 Jun 2024
Proforma of Agreement for saleFile: Draft - Agreement for sale.pdf25 Jun 2024
OtherFile: Consent Letters (All)-1Other-Copy.pdf25 Jun 2024
OtherFile: Consent Letters (All)-2 Other-Copy.pdf25 Jun 2024
OtherFile: Consent Letters (All)-3 Other-Copy.pdf25 Jun 2024
OtherFile: Consent Letters (All)-4 Other-Copy.pdf25 Jun 2024
OtherFile: Consent Letters (All)-5 Other-Copy.pdf25 Jun 2024
OtherFile: Consent Letters (All)-6 Other-Copy.pdf25 Jun 2024
OtherFile: Consent Letters (All)-7 Other-Copy.pdf25 Jun 2024
OtherFile: Consent Letters (All)-8 Other-Copy.pdf25 Jun 2024
OtherFile: Format B - Appli for extension.pdf25 Jun 2024
OtherFile: Format B- Consent for Extension.pdf25 Jun 2024
OtherFile: Format C - Appli for correction.pdf25 Jun 2024
OtherFile: Format C- Consent for Correction.pdf25 Jun 2024
Building plan approvalFile: Cidade Vida Building 1 2 Sanctioned Plan RERA.pdf18 Jun 2024
Building plan approvalFile: Cidade Vida Building 3 4 5 Sanctioned Plan RERA.pdf18 Jun 2024
Building plan approvalFile: Sanctioned Plan Bldg 1 2 compressed.pdf18 Jun 2024
Building plan approvalFile: Sanctioned Plan Bldg 3 4 5 compressed.pdf18 Jun 2024
Building Plan Approval (IOD)File: Cidade Vida Building 1 2 Sanctioned Plan RERA.pdf18 Jun 2024
Building Plan Approval (IOD)File: Cidade Vida Building 3 4 5 Sanctioned Plan RERA.pdf18 Jun 2024
Building Plan Approval (IOD)File: Sanctioned Plan Bldg 1 2 compressed.pdf18 Jun 2024
Building Plan Approval (IOD)File: Sanctioned Plan Bldg 3 4 5 compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: Form 3 (CA) Jan 24 Cidade Vida.pdf17 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Declaration ofr Seperate Bank Account.pdf17 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A Declaration cum Undertaking.pdf17 Jun 2024
Certificates of CA (Form 3)File: Form 3 (CA) Jan 24 Cidade Vida.pdf16 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seperate Bank Account 1.pdf16 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration on letterhead about Seperate Bank Account.pdf16 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A Declaration cum Undertaking.pdf16 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (Arch) Jan 24 Cidade Vida.pdf18 Apr 2024
Details of encumbrances concerned to FinanceFile: Declaration about encumbrance.pdf16 Apr 2024
Details of encumbrances concerned to LegalFile: Declaration about encumbrance.pdf16 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: N A Order - Cidade Vida.pdf16 Apr 2024
CERSAI detailsFile: Declaration cum Undertaking.pdf16 Apr 2024
Proforma of Agreement for saleFile: Draft Agreement (UR)Cidade Vida-160424.pdf16 Apr 2024
Proforma of Allotment letterFile: Allotment Letter-Cidade Vida.pdf16 Apr 2024
Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment Letter-Cidade Vida.pdf16 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report for Agreement-Cidade Vida.pdf16 Apr 2024
OtherFile: Consent Letters (All)-pages-1.pdf16 Apr 2024
OtherFile: Consent Letters (All)-pages-2.pdf16 Apr 2024
OtherFile: Consent Letters (All)-pages-3.pdf16 Apr 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hillside ApartmentsPlot No. 23 to 26 Waghela Park Talegaon Dabhade64CompletedMay 2023Feb 2023
Balaji HeightsPlot No. 170 Yashwant Nagar Talegaon Dabhade26CompletedNov 2022Late, Feb 2023
Sarovar ResidencyPlot No 8 Rajendra Nagar Talegaon Dabhade15CompletedMay 2019Late, Oct 2019

How this compares with Raigarh

51%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 120 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Cidade Vida on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tal Village5,900+ in Raigarh

Builder: Bhide Lifespaces

Bhide Lifespaces has 1 registration on MahaRERA, including Cidade Vida. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Cidade Vida is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Cidade Vida?

The registered promoter entity is Bhide Lifespaces, a partnership as per the filing. Its GSTIN 27ABAFB9994K1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Cidade Vida?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Cidade Vida?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Cidade Vida?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Cidade Vida?

The professionals named in the filing: Architect: Sujata Mhatre; Engineer: Sameer S Jeste; Engineer: Sameer Jeste; Chartered Accountant: Siddhant R Shetty; Chartered Accountant: Jagdish & Harish; Chartered Accountant: Shekhar Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Cidade Vida?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Cidade Vida. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Cidade Vida to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.