Home / Browse projects / Raigarh, Maharashtra / Cidade Vida
Cidade Vida
RG-MH-95350 · RERA P52000012762 · Last updated on MahaRERA portal: 8 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 13 complaints at MahaRERA
- Completion date moved by 120 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Cidade Vida is a Residential / Group Housing project by Bhide Lifespaces in Raigarh, Maharashtra, registered with MahaRERA as P52000012762 on 7 Sep 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 120 months from the original filing. 117 of the 231 units on this registration are recorded sold or booked, and 22 of 99 construction stages are filed complete. 13 complaints are on record with the regulator.
At a glance
Project
- NameCidade Vida
- TypeResidential / Group Housing
- Location
- Off. Alibag-Roha Road
- Tal Village
- Kawir
- Alibag
- Raigarh
- 402204
- Pincode402204
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000012762
- ReraGenie IDRG-MH-95350
Builder
- NameBhide Lifespaces
- Entity typePartnership
- GSTIN27ABAFB9994K1ZR
- PartnersPratik Chandrakant Bhide, Chandrakant Shankar Bhide
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Sep 2017
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2019)
- Buildings9 building records
- Documents filed120 files
Current status
Figures as on 8 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 1 | NA | 4 | 3 | 48 | 0 | 48 |
| BUILDING NO 2 | NA | 4 | 3 | 24 | 0 | 24 |
| BUILDING NO 3 | NA | 4 | 3 | 24 | 0 | 24 |
| BUILDING NO 4 | NA | 4 | 3 | 27 | 0 | 27 |
| BUILDING NO 5 | NA | 4 | 3 | 24 | 0 | 24 |
| BUILDING NO 6 | NA | 4 | 0 | 30 | 0 | 30 |
| BUILDING NO 7 | NA | 4 | 0 | 6 | 0 | 6 |
| BUILDING NO 8A | NA | 4 | 0 | 24 | 0 | 24 |
| BUILDING NO 8B | NA | 4 | 0 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building9
As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Slabs of Super Structure, at 75%.
BUILDING NO 145%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 243%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 341%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 443%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 545%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 60%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 70%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 8A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 8B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 1 | NA | Rs 4.49 cr | Rs 1.53 cr |
| - | NA | Rs 3.98 cr | - |
| BUILDING NO 3 | NA | Rs 3.02 cr | Rs 83.13 lakh |
| BUILDING NO 4 | NA | Rs 3.02 cr | Rs 83.13 lakh |
| BUILDING NO 5 | NA | Rs 2.80 cr | Rs 95.08 lakh |
| BUILDING NO 2 | NA | Rs 2.60 cr | Rs 55.24 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sujata Mhatre |
| Engineer | Sameer S Jeste |
| Engineer | Sameer Jeste |
| Chartered Accountant | Siddhant R Shetty |
| Chartered Accountant | Jagdish & Harish |
| Chartered Accountant | Shekhar Kulkarni |
| Partner | Role in project |
|---|---|
| Bhide Lifespaces | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project was registered by previous promoters Disha Direct Marketing Services Pvt Ltd with original date of completion of the project as 31st December 2019. Previous promoters did not complete the project before due date. They had availed a project loan from Pune People's Co-operative Bank Ltd which turned NPA in 2017 after which the bank took necessary actions under SARFAESI Act 2002 and put the project land with development rights for sale. We, New promoters, Bhide Lifespaces took the consent of 95 allottees of the project and purchased the said project land with development rights from t
Complaints filed with MahaRERA13
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055030 | Mr. Pradnesh Prashant Jadhav | M/s Disha Direct Marketing Services Pvt. Ltd. | 05/07/2018 |
| CC006000000000871 | SHRIDHAR KAMAT | Santosh Naik | 24/09/2017 |
| CC006000000055820 | SHRIDHAR KAMAT | M/S DISHA DIRECT MARKETING AGENCY SERVICES PVT. LTD. | 15/08/2018 |
| CC006000000012538 | Kalpana Berde | Disha Direct Mktg. services Pvt. Ltd. | 21/12/2017 |
| CC006000000056298 | Carmeline Fernandes | Disha Direct Marketing Services Pvt Ltd | 12/10/2018 |
| CC006000000057107 | Mr. Sanjay D. Jadhav | Disha Direct Marketing Services Private Limited | 30/11/2018 |
| CC006000000057304 | Suchitra Vijaykumar Telore | Dish Direct Marketing Services Pvt Ltd | 14/12/2018 |
| CC006000000057408 | Saurabh Ranadive | Santosh Pandurang Naik | 22/12/2018 |
| CC006000000057851 | GERIUS FERNANDES | Mr. SANTOSH NAIK (DISHA DIRECT MARKETING SERVICES) | 30/01/2019 |
| CC006000000120963 | Shri Venkatesh Tukaram Mungapatil | Disha Direct Marketing Services Pvt Ltd | 18/09/2019 |
| CC006000000079472 | Cida De Vida Apartment Owners Association | Disha Direct Marketing Services Pvt Ltd | 26/05/2019 |
| CC006000000195255 | Cida De Vida Apartment owners association | Disha Direct Marketing Services Pvt Ltd | 16/12/2020 |
| CC006000000089835 | RaviKrishnan Venkataraman | Disha Direct Marketing Services Pvt Ltd | 23/06/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed120
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 (Architect) - Cidade Vida Mar26.pdf | 8 May 2026 |
| Form 2File: Form 2 (Engineer) - Cidade Vida Mar26.pdf | 8 May 2026 |
| Form 3File: Form 3 (CA) - Cidade Vida Mar26.pdf | 8 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Mar26.pdf | 8 May 2026 |
| Form 1File: Form 1 RERA Cidade Vida DEC-25.pdf | 31 Jan 2026 |
| Form 2File: Form 2 RERA Cidade Vida Dec-25.pdf | 31 Jan 2026 |
| Form 3File: Form 3 RERA Cidade Vida Dec-25.pdf | 31 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Dec-25.pdf | 31 Jan 2026 |
| Form 1File: Form 1 (Architect) - Cidade Vida Sept'25.pdf | 15 Dec 2025 |
| Form 2File: Form-2_Engineers_Certificate_RERA_300925.pdf | 15 Dec 2025 |
| Form 3File: Form 3 (CA) - Cidade Vida Sept'25.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Sept'25.pdf | 15 Dec 2025 |
| Form 1File: Form 1 (Architect) - Cidade Vida Jun'25.pdf | 22 Jul 2025 |
| Form 2File: Form 2 (Engineer) - Cidade Vida Jun'25.pdf | 22 Jul 2025 |
| Form 3File: Form 3 (CA) - Cidade Vida Jun'25.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Jun'25.pdf | 22 Jul 2025 |
| Form 1File: Form 1 (Architect) - Cidade Vida Mar'25.pdf | 18 Jul 2025 |
| Form 2File: Form 2 (Engineer) - Cidade Vida Mar'25.pdf | 18 Jul 2025 |
| Form 3File: Form 3 (CA)- Cidade Vida Mar'25.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Mar'25.pdf | 18 Jul 2025 |
| Form 1File: Form 1 - Cidade Vida Mar'24.pdf | 5 Jul 2025 |
| Form 2File: Form 2 - Cidade Vida Mar'24.pdf | 5 Jul 2025 |
| Form 3File: Form 3 - Cidade Vida Mar 24.pdf | 5 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory-Mar24.pdf | 5 Jul 2025 |
| Form 1File: Form 1 - Cidade Vida Jun'24.pdf | 5 Jul 2025 |
| Form 2File: Form 2 - Cidade Vida Jun'24.pdf | 5 Jul 2025 |
| Form 3File: Form 3 - Cidade Vida Jun'24.pdf | 5 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold& Booked Inventory-Jun24.pdf | 5 Jul 2025 |
| Form 1File: Form 1 - Cidade Vida Sept'24.pdf | 5 Jul 2025 |
| Form 2File: Form 2 - Cidade Vida Sept'24.pdf | 5 Jul 2025 |
| Form 3File: Form 3 - Cidade Vida Sept'24.pdf | 5 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold _booked inventory Sept24.pdf | 5 Jul 2025 |
| Form 1File: Form 1 - Cidade Vida Dec'24.pdf | 5 Jul 2025 |
| Form 2File: Form 2 - Cidade Vida Dec'24.pdf | 5 Jul 2025 |
| Form 3File: Form 3 - Cidade Vida Dec'24.pdf | 5 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory Dec24.pdf | 5 Jul 2025 |
| Building plan approvalFile: Sanctioned Plan - Bldg 1 2 Cidade Vida - Compressed-Copy.pdf | 25 Jun 2024 |
| Building plan approvalFile: Sanctioned Plan - Bldg 3 4 5 Cidade Vida.pdf | 25 Jun 2024 |
| Building Plan Approval (IOD)File: Sanctioned Plan - Bldg 1 2 Cidade Vida - Compressed-Copy.pdf | 25 Jun 2024 |
| Building Plan Approval (IOD)File: Sanctioned Plan - Bldg 3 4 5 Cidade Vida.pdf | 25 Jun 2024 |
| Proforma of Agreement for saleFile: Draft - Agreement for sale.pdf | 25 Jun 2024 |
| OtherFile: Consent Letters (All)-1Other-Copy.pdf | 25 Jun 2024 |
| OtherFile: Consent Letters (All)-2 Other-Copy.pdf | 25 Jun 2024 |
| OtherFile: Consent Letters (All)-3 Other-Copy.pdf | 25 Jun 2024 |
| OtherFile: Consent Letters (All)-4 Other-Copy.pdf | 25 Jun 2024 |
| OtherFile: Consent Letters (All)-5 Other-Copy.pdf | 25 Jun 2024 |
| OtherFile: Consent Letters (All)-6 Other-Copy.pdf | 25 Jun 2024 |
| OtherFile: Consent Letters (All)-7 Other-Copy.pdf | 25 Jun 2024 |
| OtherFile: Consent Letters (All)-8 Other-Copy.pdf | 25 Jun 2024 |
| OtherFile: Format B - Appli for extension.pdf | 25 Jun 2024 |
| OtherFile: Format B- Consent for Extension.pdf | 25 Jun 2024 |
| OtherFile: Format C - Appli for correction.pdf | 25 Jun 2024 |
| OtherFile: Format C- Consent for Correction.pdf | 25 Jun 2024 |
| Building plan approvalFile: Cidade Vida Building 1 2 Sanctioned Plan RERA.pdf | 18 Jun 2024 |
| Building plan approvalFile: Cidade Vida Building 3 4 5 Sanctioned Plan RERA.pdf | 18 Jun 2024 |
| Building plan approvalFile: Sanctioned Plan Bldg 1 2 compressed.pdf | 18 Jun 2024 |
| Building plan approvalFile: Sanctioned Plan Bldg 3 4 5 compressed.pdf | 18 Jun 2024 |
| Building Plan Approval (IOD)File: Cidade Vida Building 1 2 Sanctioned Plan RERA.pdf | 18 Jun 2024 |
| Building Plan Approval (IOD)File: Cidade Vida Building 3 4 5 Sanctioned Plan RERA.pdf | 18 Jun 2024 |
| Building Plan Approval (IOD)File: Sanctioned Plan Bldg 1 2 compressed.pdf | 18 Jun 2024 |
| Building Plan Approval (IOD)File: Sanctioned Plan Bldg 3 4 5 compressed.pdf | 18 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3 (CA) Jan 24 Cidade Vida.pdf | 17 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Declaration ofr Seperate Bank Account.pdf | 17 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A Declaration cum Undertaking.pdf | 17 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3 (CA) Jan 24 Cidade Vida.pdf | 16 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seperate Bank Account 1.pdf | 16 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration on letterhead about Seperate Bank Account.pdf | 16 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A Declaration cum Undertaking.pdf | 16 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (Arch) Jan 24 Cidade Vida.pdf | 18 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration about encumbrance.pdf | 16 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Declaration about encumbrance.pdf | 16 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: N A Order - Cidade Vida.pdf | 16 Apr 2024 |
| CERSAI detailsFile: Declaration cum Undertaking.pdf | 16 Apr 2024 |
| Proforma of Agreement for saleFile: Draft Agreement (UR)Cidade Vida-160424.pdf | 16 Apr 2024 |
| Proforma of Allotment letterFile: Allotment Letter-Cidade Vida.pdf | 16 Apr 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment Letter-Cidade Vida.pdf | 16 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report for Agreement-Cidade Vida.pdf | 16 Apr 2024 |
| OtherFile: Consent Letters (All)-pages-1.pdf | 16 Apr 2024 |
| OtherFile: Consent Letters (All)-pages-2.pdf | 16 Apr 2024 |
| OtherFile: Consent Letters (All)-pages-3.pdf | 16 Apr 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Hillside Apartments | Plot No. 23 to 26 Waghela Park Talegaon Dabhade | 64 | Completed | May 2023 | Feb 2023 |
| Balaji Heights | Plot No. 170 Yashwant Nagar Talegaon Dabhade | 26 | Completed | Nov 2022 | Late, Feb 2023 |
| Sarovar Residency | Plot No 8 Rajendra Nagar Talegaon Dabhade | 15 | Completed | May 2019 | Late, Oct 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 120 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Cidade Vida on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tal Village5,900+ in Raigarh
Aqua Shores
Dynamix Vacation Resorts Private Limited
AQUA SUITES
Dynamix Vacation Resorts Private Limited
Creata Harmony
Creata lifespaces LLp
Coral Bay
Dynamix Vacation Resorts Private Limited
Aqua Bliss
Dynamix Vacation Resorts Private Limited
Aqua Vista
Dynamix Vacation Resorts Private Limited
See every Raigarh project, with the district possession charts
Builder: Bhide Lifespaces
Bhide Lifespaces has 1 registration on MahaRERA, including Cidade Vida. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Cidade Vida is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Cidade Vida?
The registered promoter entity is Bhide Lifespaces, a partnership as per the filing. Its GSTIN 27ABAFB9994K1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Cidade Vida?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Cidade Vida?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Cidade Vida?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Cidade Vida?
The professionals named in the filing: Architect: Sujata Mhatre; Engineer: Sameer S Jeste; Engineer: Sameer Jeste; Chartered Accountant: Siddhant R Shetty; Chartered Accountant: Jagdish & Harish; Chartered Accountant: Shekhar Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Cidade Vida?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback