Home / Browse projects / Bengaluru Urban, Karnataka / MAHINDRA NEWHAVEN
MAHINDRA NEWHAVEN
By MAHINDRA LIFESPACE DEVELOPERS LIMITED
RG-KA-55949 · RERA PRM/KA/RERA/1251/310/PR/160425/007668 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MAHINDRA NEWHAVEN is a Residential/Group Housing project by MAHINDRA LIFESPACE DEVELOPERS LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/160425/007668 on 16 Apr 2025. Possession is promised by 28 Dec 2029. 106 of the 119 units on this registration are recorded sold or booked, and 1 of 19 construction stages are filed complete.
At a glance
Project
- NameMAHINDRA NEWHAVEN
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560068
- Pincode560068
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/160425/007668
- ReraGenie IDRG-KA-55949
Builder
- NameMAHINDRA LIFESPACE DEVELOPERS LIMITED
- Entity typeCompany
- CINL45200MH1999PLC118949
- GSTIN29AAACG8904C1ZR
- Authorized SignatoryNandan V Mallya
- Managing Director & Chief Executive OfficerAmit Kumar Sinha
- DirectorsMr.Ameet Pratapsinh Hariani, Dr. Anish Dilip Shah, Mr. Anuj Puri, Ms.Amrita Verma Chowdhury, Ms.Asha Kharga, Ms.Rucha Nanvati, Mr.Milind Kulkarni, Mr.Amit Kumar Sinha
- Project HeadR. Aswath Prasad
- Other registrations4 more →
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on16 Apr 2025
- Promised completion28 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed141 files
Current status
Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | - | - | - | 119 | 0 | 119 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 19 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 72%.
Building: 15% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 72% |
| Foundation footing work | 68% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 38% |
| RCC or MS Framed structure | 4% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mahindra Lifespace Developers Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 118.31 cr | Rs 4.05 cr |
| Administrative Costs | Rs 4.31 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 4.14 cr | - |
| On-site expenditure-Consultants Fees | Rs 3.88 cr | - |
| On-site expenditure-Site Overhead | - | Rs 85.42 lakh |
| Payment of taxes | - | Rs 1.76 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anup Naik |
| Engineer | Vishnu Kumar |
| Chartered Accountant | Sai Rakshith M S |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed141
As listed on the registration, under the names the promoter filed them with; the newest 80 of 141 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/160425/007668 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU Sep 26.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Sep 26.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU Sep 26.pdf | 13 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 13 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 13 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 13 Oct 2026 |
| Q2 2026-27 Fire and Safety | 13 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 13 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU June 26.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU June 26.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU June 26.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q1 2026-27 Fire and Safety | 13 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU March 26.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU March 26.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU March 26.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q4 2025-26 Fire and Safety | 13 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU Dec 25.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Dec 25.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU Dec 25.pdf | 13 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 13 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Jan 2026 |
| Q3 2025-26 Fire and Safety | 13 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 13 Jan 2026 |
| Approved Building PlanFile: Approved Building Plan.pdf | 9 Apr 2025 |
| Building LicenseFile: Building License.pdf | 9 Apr 2025 |
| Common Area and Amenities DetailsFile: 2 Common Area and Amenities Details.pdf | 9 Apr 2025 |
| Balance Sheet with schedules FY 21-22File: 1 Balance Sheet with schedules FY 21-22.pdf | 29 Mar 2025 |
| Balance Sheet with schedules FY 22-23File: 1 Balance Sheet with schedules FY 22-23.pdf | 29 Mar 2025 |
| Balance Sheet with schedules FY 23-24File: 1 Balance Sheet with schedules FY 23-24.pdf | 29 Mar 2025 |
| Profit and Loss FY 21-22File: 1 Profit and Loss FY 21-22.pdf | 29 Mar 2025 |
| Profit and Loss FY 22-23File: 1 Profit and Loss FY 22-23.pdf | 29 Mar 2025 |
| Profit and Loss FY 23-24File: 1 Profit and Loss FY 23-24.pdf | 29 Mar 2025 |
| Auditors Report FY 21-22File: 1 Auditors Report FY 21-22.pdf | 29 Mar 2025 |
| Auditors Report FY 22-23File: 1 Auditors Report FY 22-23.pdf | 29 Mar 2025 |
| Auditors Report FY 23-24File: 1 Auditors Report FY 23-24.pdf | 29 Mar 2025 |
| Cash flow FY 21-22File: 1 Cash flow FY 21-22.pdf | 29 Mar 2025 |
| Cash flow FY 22-23File: 1 Cash flow FY 22-23.pdf | 29 Mar 2025 |
| Cash flow FY 23-24File: 1 Cash flow FY 23-24.pdf | 29 Mar 2025 |
| Directors Report FY 21-22File: 1 Directors Report FY 21-22.pdf | 29 Mar 2025 |
| Directors Report FY 22-23File: 1 Directors Report FY 22-23.pdf | 29 Mar 2025 |
| Directors Report FY 23-24File: 1 Directors Report FY 23-24.pdf | 29 Mar 2025 |
| Source of Fund with Supoorting DocumentsFile: 2 Source of Fund with Supoorting Documents.pdf | 29 Mar 2025 |
| MLDL_Q2FY25 Signed_Source of fundsFile: 2 MLDL_Q2FY25 Signed_Source of funds.pdf | 29 Mar 2025 |
| Common Area and Amenities DetailsFile: 3 Common Area and Amenities Details.pdf | 29 Mar 2025 |
| HAL NOCFile: 4 HAL NOC.PDF | 29 Mar 2025 |
| BWSSB NOCFile: 5 BWSSB NOC.pdf | 29 Mar 2025 |
| ADLR Survey SketchFile: 6 ADLR Survey Sketch.pdf | 29 Mar 2025 |
| KSPCB NOCFile: 7 KSPCB NOC.pdf | 29 Mar 2025 |
| BESCOM NOCFile: BESCOM NOC.pdf | 29 Mar 2025 |
| Reply to QueryFile: Reply to Query.pdf | 29 Mar 2025 |
| RTC, survey 62 | - |
| Mutation, survey 62 | - |
| Encumbrance Certificate, survey 62 | - |
| Conversion/Alienation Order, survey 62 | - |
| Sale/Title/Gift Deed, survey 62 | - |
| Khatha, survey 62 | - |
| Registration CertificateFile: Company Registration Certificate.PDF | - |
| Memorandum of AssociationFile: Company MOA.pdf | - |
| Article of AssociationFile: Company AOA.pdf | - |
| GST CertificateFile: GST Certificate.pdf | - |
| Organization StructureFile: Organization Structure.pdf | - |
| Certificate issued by CA Form 1File: Form-1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form-3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| MAHINDRA ZEN | MAHINDRA ZEN Sy No 65 & 116/2, Singasandra Village , Begur Hobli , Bengaluru South , Bengaluru Urban, Karnataka - 560068 | Ongoing | Dec 2028 | Not due yet |
| Mahindra Eden Phase-2 | Mahindra Eden Sy. No. 49 & 50/2, Holiday Village Road, Vajarahalli Village, Kanakapura Road, Bengaluru: 560062. | Ongoing | Mar 2027 | Not due yet |
| Mahindra Eden Phase-1 | Mahindra Eden Sy. No. 49 & 50/2, Holiday Village Road, Vajarahalli Village, Kanakapura Road, Bengaluru: 560062. | Ongoing | Mar 2027 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MAHINDRA NEWHAVEN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 22 registered projects within 2 km.
MEMCO SKYLINE - JUTAKU
MEMCO SKYLINE PRIVATE LIMITED
SNN RAJ SERENITY
SNN Builders Private Limited
TVS Emerald Jardin
Emerald Haven Development Limited
CASAGRAND AMOR
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Assetz Mizumi Reserve Tower A1 A2 A4
APG COMMUNITY DEVELOPMENT PRIVATE LIMITED
Assetz Canvas & Cove 2.0 - Block B & C
APG HABITAT PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: MAHINDRA LIFESPACE DEVELOPERS LIMITED
MAHINDRA LIFESPACE DEVELOPERS LIMITED has 5 registrations on RERA Karnataka, including MAHINDRA EDEN PHASE-2 and MAHINDRA NEWHAVEN. Its filings declare 6 earlier projects, none of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MAHINDRA NEWHAVEN is delayed beyond 28 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MAHINDRA NEWHAVEN?
The registered promoter entity is MAHINDRA LIFESPACE DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1999PLC118949 and GSTIN 29AAACG8904C1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MAHINDRA NEWHAVEN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MAHINDRA NEWHAVEN?
The professionals named in the filing: Architect: Anup Naik; Engineer: Vishnu Kumar; Chartered Accountant: Sai Rakshith M S. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHINDRA NEWHAVEN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback