Home / Browse projects / Nagpur, Maharashtra / MAHALAXMI NAGAR
MAHALAXMI NAGAR
By CHANDRASHEKHAR BABURAO KALE
RG-MH-62653 · RERA P50500055314 · Last updated on MahaRERA portal: 19 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAHALAXMI NAGAR is a Plotted project by CHANDRASHEKHAR BABURAO KALE in Nagpur, Maharashtra, registered with MahaRERA as P50500055314 on 14 Mar 2024. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 123 of the 241 units on this registration are recorded sold or booked.
At a glance
Project
- NameMAHALAXMI NAGAR
- TypePlotted
- Location
- SAWANGI
- Sawangi (535181)
- Kalameshwar
- Nagpur
- 441501
- Pincode441501
- RERA no.P50500055314
- ReraGenie IDRG-MH-62653
Builder
- NameCHANDRASHEKHAR BABURAO KALE
- Entity typeIndividual
- Other registrations3 more →
- Completed2 of 4
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Mar 2024
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- BuildingsNot stated in filing
- Documents filed89 files
Current status
Figures as on 19 Apr 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 79% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 92% |
| Storm Water Drains | Yes | 97% |
| Landscaping & Tree Planting | Yes | 36% |
| Street Lighting | Yes | 91% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 92% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 86% |
| Aggregate area of recreational Open Space | Yes | 57% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 1.16 cr | Rs 98.28 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR LOKESH KADU KADU |
| Engineer | MR JAYPRAKASH GANDHI |
| Chartered Accountant | CA ANKIT TALREJA GAD AND ASSOCIATES |
| Chartered Accountant | SUMIT SANTOSH AGRAWAL & ASSOCIATES |
| Chartered Accountant | UTSAV SUMIT & ASSOCIATES |
| Partner | Role in project |
|---|---|
| CHANDRASHEKHAR BABURAO KALE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir/Madam, I, CHANDRASHEKHAR BABURAO KALE, Promoter of the project “MAHALAXMI NAGAR” bearing MahaRERA Registration No. P50500055314, respectfully submit this application seeking extension of the project completion period. The progress of the project was delayed due to delay in statutory approvals and permissions, force majeure and external circumstances beyond the control of the promoter, shortage of labour, disruption in availability of construction materials, and delay in approvals and services from utility and other government departments. Due to the cumulative effect of these fac
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 MAHALAXMI NAGAR SEP 2025.pdf | 19 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 MAHALAXMI NAGAR SEP 2025.pdf | 19 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 MAHALAXMI NAGAR SEP 2025_compressed.pdf | 19 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 MAHALAXMI NAGAR SEP 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 MAHALAXMI NAGAR SEP 2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 MAHALAXMI NAGAR SEP 2025_compressed.pdf | 22 Jan 2026 |
| Form 2A (FY 2024-2025)File: FORM-2A MAR-25 SCANNED.pdf | 24 Dec 2025 |
| Form 5 (FY 2023-2024)File: FORM-5 MAR-24.pdf | 24 Dec 2025 |
| Form 1File: FORM 1 MARCH 2024.pdf | 23 Dec 2025 |
| Form 2File: FORM 2 MAR 2024.pdf | 23 Dec 2025 |
| Form 3File: FORM 3 MAR 2024.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MAR-2024.pdf | 23 Dec 2025 |
| Form 1File: FORM 1 JUNE 2024.pdf | 23 Dec 2025 |
| Form 2File: FORM 2 JUNE 2024.pdf | 23 Dec 2025 |
| Form 3File: FORM 3 JUNE 2024.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD JUNE -2024.pdf | 23 Dec 2025 |
| Form 1File: FORM 1 SEP 2024.pdf | 23 Dec 2025 |
| Form 2File: FORM 2 SEP 2024.pdf | 23 Dec 2025 |
| Form 3File: FORM 3 SEP 2024.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD -SEP -2024.pdf | 23 Dec 2025 |
| Form 1File: FORM 1 DEC 2024.pdf | 23 Dec 2025 |
| Form 2File: FORM 2 DEC 2024.pdf | 23 Dec 2025 |
| Form 3File: FORM 3 DEC 2024.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD DEC-2024.pdf | 23 Dec 2025 |
| Form 1File: FORM 1 MARCH 2025.pdf | 23 Dec 2025 |
| Form 2File: FORM-2_MAR-25.pdf | 23 Dec 2025 |
| Form 3File: form 3 Mahalaxmi nagar mar 2025.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MARCH-2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 JUNE 2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 MAHALAXMI NAGAR SEP 2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: FORM-2_June-25.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 MAHALAXMI NAGAR SEP 2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 MAHALAXMI NAGAR JUNE 2025.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 MAHALAXMI NAGAR SEP 2025_compressed.pdf | 23 Dec 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A MARCH 2024.pdf | 23 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM-5 MAR-25 SCANNED.pdf | 20 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: mn f1.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: mn f3.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: mn f2.pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: mn sns.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_MAHALAXMI NAGAR_Dec-24.pdf | 4 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2__.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 MAHALAXMI NAGAR 08-01-2025.pdf | 23 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mahalaxmi Nagar Form 5.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 MAHALAXMI NAGAR_SEP_2024.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mahalaxminagar June 2024_.pdf | 19 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 MAHALAXMI NAGAR 07-07-2024.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_MAR-24.pdf | 15 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: mar-24.pdf | 15 May 2024 |
| Disclosure of sold/ booked inventoryFile: MAR-24.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_MAHALAXMI NAGAR-MAR-24.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHALAXMI NAGAR 01-04-2024.pdf | 13 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_NA ORDER_.pdf | 6 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 3 Other - Technical.pdf | 6 Mar 2024 |
| Layout approvalFile: scan0055_11zon.pdf | 27 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUM_Finance_MAHALAXMI.pdf | 27 Feb 2024 |
| Details of encumbrances concerned to LegalFile: ENCUM_Finance_MAHALAXMI.pdf | 27 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: scan0055_11zon.pdf | 27 Feb 2024 |
| Declaration about Commencement CertificateFile: form d (2)_Mahalaxmi.pdf | 27 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Mahalaxmi Nagar.pdf | 27 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DECLARATION (3).pdf | 27 Feb 2024 |
| Other - FinanceFile: DECLARATION (3).pdf | 27 Feb 2024 |
| Other - FinanceFile: Cersai Declaration_Vedant Aquamarine.pdf | 27 Feb 2024 |
| Other - FinanceFile: Bank Account Disclosure_Prepared Nalwadi 91-2AMD.pdf | 27 Feb 2024 |
| Other - TechnicalFile: Document 223.pdf | 27 Feb 2024 |
| Other - TechnicalFile: CC MAIL.pdf | 27 Feb 2024 |
| Other - TechnicalFile: Quality-Annexure A Royal Regency Kalidas.pdf | 27 Feb 2024 |
| Building plan approval or NA orderFile: Scan-0574_compressed (1).pdf | 30 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0574_compressed (1).pdf | 30 Mar 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200265000903_For_Asset_Based_Search_30_03_2023_21_42_02_056.pdf | 30 Mar 2023 |
| Proforma of Agreement for saleFile: Agreement to Sale- CHANDRASHEKHAR KALE.pdf | 30 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Disclosure_Prepared.pdf | 30 Mar 2023 |
| Declaration in FORM BFile: FORM B.pdf | 29 Mar 2023 |
| PAN CardFile: 1 PAN Card (4).pdf | 18 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAHALAXMI NAGAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SAWANGI2,800+ in Nagpur
MAYA NAGARI PARK-1
PRAVIN WAMANRAO BHOYAR
DERA GREENS 3
NARAYAN CHANDIRAM DEMBLE
MADHAV NAGARI- 3
MIDAS PROPERTIES
NIRALA GREEN WOODS
Nirala Buildtech Private Limited
DERA GREENS 2
VIJAY KIMATRAI HUF
Nisarg Vihar
CRUSH-N-CUT STONES PRIVATE LIMITED
See every Nagpur project, with the district possession charts
Builder: CHANDRASHEKHAR BABURAO KALE
CHANDRASHEKHAR BABURAO KALE has 4 registrations on MahaRERA, including SHREE RAJ TOWER and SHREE ANAND SAGAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if MAHALAXMI NAGAR is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAHALAXMI NAGAR?
The registered promoter entity is CHANDRASHEKHAR BABURAO KALE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAHALAXMI NAGAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAHALAXMI NAGAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAHALAXMI NAGAR?
The professionals named in the filing: Architect: AR LOKESH KADU KADU; Engineer: MR JAYPRAKASH GANDHI; Chartered Accountant: CA ANKIT TALREJA GAD AND ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES; Chartered Accountant: UTSAV SUMIT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHALAXMI NAGAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback