ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Mahalaxmi Heights

Completed No litigation declared Residential / Group Housing project

Mahalaxmi Heights

By Mahalaxmi Developers

RG-MH-25583 · RERA P52100010556 · Last updated on MahaRERA portal: 15 Aug 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
34 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

Mahalaxmi Heights is a Residential / Group Housing project by Mahalaxmi Developers in Pune, Maharashtra, registered with MahaRERA as P52100010556 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2026. The completion date has moved by 24 months from the original filing. 46 of the 80 units on this registration are recorded sold or booked, and 27 of 33 construction stages are filed complete.

At a glance

Project

  • NameMahalaxmi Heights
  • TypeResidential / Group Housing
  • Location
    • Pabal road
    • Holewadi
    • Khed
    • Pune
    • 410505
  • Pincode410505
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100010556
  • ReraGenie IDRG-MH-25583

Builder

  • NameMahalaxmi Developers
  • Entity typePartnership
  • PartnersVishal Balasaheb Hole, Gurudev Balasaheb Borhade
  • Other registrations25 more →
  • Completed7 of 26
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2024)
  • Buildings3 building records
  • Documents filed111 files

Current status

57%46 of 80 units booked

Figures as on 15 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA5432032
Building BNA5416016
Building CNA5432032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Building A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Declared on5 Jun 2025
LandownerVillageDistrict
Rohidas Digambar HoleHolewadiPune
Rahibai Digambar HoleHolewadiPune
Tarabai Nandu PadwalHolewadiPune
Sarubai Kashiba GargoteWaki BKPune
Bhagaji Baban HoleHolewadiPune
Balu Baban HoleHolewadiPune
Vandana Prakash WadekarBahulPune

Approvals and building plan

Sanctioning authorityTown Planning Pune
Permissible FSI4078.56
Proposed, not sanctioned4,079 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRajgurunagar, Khed, Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Gurudev B Borhade
EngineerMr Gurudev B Borhade
Chartered AccountantMorde & Retwade
PartnerRole in project
Mahalaxmi Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027275Dec 2024 → Dec 2026

Reason as filed by the promoterDue to material shortages, labor shortages, and insufficient funding, the construction work for the project is currently on hold. Additionally, the completion certificate is still pending. However, sufficient funds are now available. We kindly request an extension for the project completion

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 May 2025

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Screenshot of PMRDA Mail ro MahareRera.pdf15 Aug 2025
Building plan approval or NA orderFile: NAOrder.pdf9 Aug 2025
Commencement certificateFile: Commencement certificate NA order.pdf9 Aug 2025
Occupational CertificateFile: Form 4 Final - Annexure E.pdf11 Jun 2025
Building plan approval or NA orderFile: NAOrder.pdf5 Jun 2025
Occupational CertificateFile: Final Occupancy Certificate Mahalaxmi Heights.pdf5 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final Occupancy Certificate Mahalaxmi Heights.pdf30 May 2025
Declaration in FORM BFile: FORM B_compressed.pdf21 May 2025
Certificates of CA (Form 3)File: 30032023.pdf21 May 2025
Certificates of CA (Form 3)File: 30062023.pdf21 May 2025
Certificates of CA (Form 3)File: 30092023.pdf21 May 2025
Certificates of CA (Form 3)File: 30122023.pdf21 May 2025
Certificates of CA (Form 3)File: 30032024.pdf21 May 2025
Certificates of CA (Form 3)File: 30062024.pdf21 May 2025
Certificates of CA (Form 3)File: 30092024.pdf21 May 2025
Certificates of CA (Form 3)File: 30122024.pdf21 May 2025
Certificates of CA (Form 3)File: 30032025.pdf21 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf21 May 2025
Other - TechnicalFile: ANNEXURE A.pdf21 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: REAL ESTAE.pdf21 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062023.pdf20 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092023.pdf20 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30122023.pdf20 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032024.pdf20 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062024.pdf20 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092024.pdf20 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30122024.pdf20 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032025.pdf20 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032023.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30032025.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30122024.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30092024.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30062024.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30032024.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30122023.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30092023.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30062023.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30032023.pdf20 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032023.pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062023.pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092023.pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122023.pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032024.pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062024.pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092024.pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122024.pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032025.pdf19 May 2025
Certificates of CA (Form 3)File: CA form 3 mach 2025.pdf1 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer letter form2 2024-25 docx.pdf1 Apr 2025
Disclosure of sold/ booked inventoryFile: sold book allot inventory 2025.pdf1 Apr 2025
Disclosure of sold/ booked inventoryFile: sold inventary.pdf4 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect cert fy 2022-23.pdf23 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect cert fy 2023-24.pdf23 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect cert fy 2023-24.pdf23 Jan 2025
Certificates of CA (Form 5)File: form 5 22-23.pdf23 Jan 2025
Certificates of CA (Form 5)File: Form 5 2023-24.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer letter form2 2023-24 docx.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf23 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: We have only one Maharera account.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers form 2A yr 2024.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf24 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Not Applicable.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers form 2A yr 2023 .pdf20 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: We are not involve in any other real estate organization.pdf20 Nov 2023
Certificates of CA (Form 3)File: form 3 fy 2018-19.pdf2 Apr 2023
Certificates of CA (Form 3)File: form 3 fy 2019-20.pdf2 Apr 2023
Certificates of CA (Form 3)File: form 3 fy 2020-21.pdf2 Apr 2023
Certificates of CA (Form 3)File: form 3 fy 2021-22.pdf2 Apr 2023
Disclosure of sold/ booked inventoryFile: sold unsold details A bld.pdf11 Feb 2023
Disclosure of sold/ booked inventoryFile: sold unsold details B bld.pdf11 Feb 2023
Disclosure of sold/ booked inventoryFile: sold unsold details C bld.pdf11 Feb 2023
CERSAI detailsFile: CERSAI declaration.pdf11 Feb 2023
Proforma of Agreement for saleFile: Agreement for sale draft copy .pdf11 Feb 2023
Proforma of Allotment letterFile: allotment letter.pdf11 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: legal entity.pdf11 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrances decl 2023.pdf10 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrances decl 2023.pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 2019-20.pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 2020-21.pdf10 Feb 2023

How this compares with Pune

57%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahalaxmi Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Holewadi13,700+ in Pune

2 kmMahalaxmi HeightsCompleted 7Lapsed / revoked 12Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: Mahalaxmi Developers

MAHALAXMI DEVELOPERS has 26 registrations on MahaRERA, including Mahalaxmi Sankul and Silver Springs. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mahalaxmi Heights is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahalaxmi Heights?

The registered promoter entity is Mahalaxmi Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahalaxmi Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahalaxmi Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahalaxmi Heights?

The professionals named in the filing: Architect: Mr Gurudev B Borhade; Engineer: Mr Gurudev B Borhade; Chartered Accountant: Morde & Retwade. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahalaxmi Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahalaxmi Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahalaxmi Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.