MAHALAXMI EMPIRE
RG-MH-01254 · RERA P50300014755 · Last updated on MahaRERA portal: 12 Apr 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAHALAXMI EMPIRE is a Residential / Group Housing project by SHREE GAJANAN ASSOCIATES in Amravati, Maharashtra, registered with MahaRERA as P50300014755 on 2 Jan 2018. The registration is recorded completed; possession was promised by 26 Jan 2030.
At a glance
Project
- NameMAHALAXMI EMPIRE
- TypeResidential / Group Housing
- Location
- RAHATGAON RING ROAD
- MAHALAXMI NAGAR
- Amravati (M Corp.)
- Amravati
- 444604
- Pincode444604
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50300014755
- ReraGenie IDRG-MH-01254
Builder
- NameSHREE GAJANAN ASSOCIATES
- Entity typePartnership
- PartnersPRATIKSHA PRAVIN MAHALLE, MINAKSHI SUBHASH AGRAWAL, SUBHASH GULABCHAND AGRAWAL
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Jan 2018
- Promised completion26 Jan 2030
- Revised completionNone
- Buildings2 building records
- Documents filed77 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MAHALAXMI EMPIRE PHASE-I | NA | 7 | 0 | 0 | 0 | 0 |
| MAHALAXMI EMPIRE PHASE-II | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
MAHALAXMI EMPIRE PHASE-I82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MAHALAXMI EMPIRE PHASE-II82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHRADHA SAGNE |
| Engineer | PRATIKSHA GURJAR |
| Chartered Accountant | TAPESH MUNDADA |
| Partner | Role in project |
|---|---|
| SHREE GAJANAN ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Nov 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Nov 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Feb 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Jun 2021
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: sold unsold me2.pdf | 12 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: NA SGA.pdf | 13 Jan 2023 |
| Details of encumbrances concerned to LegalFile: NA SGA.pdf | 13 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: NA SGA.pdf | 13 Jan 2023 |
| CERSAI detailsFile: NA SGA.pdf | 13 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NA SGA.pdf | 13 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NA SGA.pdf | 13 Jan 2023 |
| Proforma of Agreement for saleFile: NA SGA.pdf | 13 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: NA SGA.pdf | 13 Jan 2023 |
| Foreclosure of the ProjectFile: NA SGA.pdf | 13 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: NA SGA.pdf | 13 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: NA SGA.pdf | 13 Jan 2023 |
| Other - FinanceFile: NA SGA.pdf | 13 Jan 2023 |
| Other - TechnicalFile: NA SGA.pdf | 13 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: mahalaaxmi empire 1.pdf | 22 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: mahalaxmi empire 2.pdf | 22 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: ME1 sold unsold.pdf | 4 May 2022 |
| Disclosure of sold/ booked inventoryFile: ME2 Sold unsold.pdf | 4 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ME engi.pdf | 28 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Sold me1.pdf | 26 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: sold me 2 (1).pdf | 26 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Me.pdf | 24 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: ME1.pdf | 24 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: ME2.pdf | 24 Nov 2021 |
| Status of ConveyanceFile: ME1.pdf | 24 Nov 2021 |
| Status of ConveyanceFile: ME2.pdf | 24 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: me.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAHALAXMI EMPIRE-compressed.pdf | 14 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: shree gajanan asso.pdf | 14 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: shree gajanan asso.pdf | 14 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: me (CA 5).pdf | 14 Aug 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: me.pdf | 14 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: me2permit-935.pdf | 13 Aug 2021 |
| Declaration about Commencement CertificateFile: COMMENCEMENTCERTI MEP1.pdf | 13 Aug 2021 |
| Declaration about Commencement CertificateFile: me2permit-935.pdf | 13 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAHALAXMI EMPIRE-compressed.pdf | 13 Aug 2021 |
| Form 2AFile: MAHALAXMI EMPIRE.pdf | 13 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MAHALAXMI EMPIRE.pdf | 13 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: me1soldunsoldinve.pdf | 13 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: me2soldunsoldinve.pdf | 13 Aug 2021 |
| Details of Restarting of Construction work post lockdownFile: nil.pdf | 13 Aug 2021 |
| Status of ConveyanceFile: me1soldunsoldinve.pdf | 13 Aug 2021 |
| Status of ConveyanceFile: me2soldunsoldinve.pdf | 13 Aug 2021 |
| OtherFile: nil.pdf | 13 Aug 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ocme1.pdf | 18 Jun 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc me2.pdf | 18 Jun 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: dod1.pdf | 18 Jun 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: dod2.pdf | 18 Jun 2021 |
| Building plan approvalFile: Mahalaxmi Phase compress.pdf | 18 Feb 2020 |
| Building Plan Approval (IOD)File: Mahalaxmi Phase compress.pdf | 18 Feb 2020 |
| Form 2AFile: form2A DEC19.pdf | 18 Feb 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM4ARCHITECT.pdf | 26 Nov 2019 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM4ARCHIPLUSAMCOC.pdf | 26 Nov 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DOD ME I.pdf | 26 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT 10119 ME.pdf | 24 Jan 2019 |
| Certificates of CA (Form 3)File: CA CERT 10119 ME.pdf | 24 Jan 2019 |
| Form 2AFile: form 2A sga.pdf | 9 Jan 2019 |
| Certificates of CA (Form 5)File: CA5 SGA 17-18.pdf | 5 Jan 2019 |
| Building plan approvalFile: map.pdf | 20 May 2018 |
| Building Plan Approval (IOD)File: map.pdf | 20 May 2018 |
| Building plan approvalFile: sanctionmap phase I.pdf | 9 Apr 2018 |
| Building plan approvalFile: sanctionmap phase I.pdf | 9 Apr 2018 |
| Building Plan Approval (IOD)File: sanctionmap phase I.pdf | 9 Apr 2018 |
| Building Plan Approval (IOD)File: sanctionmap phase I.pdf | 9 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENTCERTI MEP1.pdf | 9 Apr 2018 |
| Proforma of Allotment letterFile: agreement to sale draft.pdf | 22 Dec 2017 |
| Building plan approvalFile: sanctionmap.pdf | 16 Dec 2017 |
| Building Plan Approval (IOD)File: sanctionmap.pdf | 16 Dec 2017 |
| Layout approvalFile: lay.pdf | 30 Nov 2017 |
| PAN CardFile: pam.pdf | 30 Nov 2017 |
| Copy of the legal title reportFile: title.pdf | 30 Nov 2017 |
| Details of encumbrancesFile: Encum.pdf | 30 Nov 2017 |
| Copy of Layout Approval (in case of layout)File: lay.pdf | 30 Nov 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: commen.pdf | 30 Nov 2017 |
| Declaration in FORM BFile: FORMB-ilovepdf-compressed.pdf | 30 Nov 2017 |
| Certificates of CA (Form 3)File: cacertificate.pdf | 30 Nov 2017 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 30 Nov 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Amravati
Computed across the 450+ Amravati projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
Keep MAHALAXMI EMPIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAHALAXMI NAGAR450+ in Amravati
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
VEDAH PHASE 1
TRENDBUILT LIFESPACES LLP
Madhavam Heights
Sky Line Infra Vision
JANNAT COMPLEX
MOHAMMAD AAMIR AHMAD
VIJAY FORTUNE
VIJAY PARANJAPE ESTATE LLP
Dream Imperia
Vilas Ramrao Gawai
SHREE GAJANAN ENCLAVE
AJAY NAMDEORAO DAMBALE
See every Amravati project, with the district possession charts
Builder: SHREE GAJANAN ASSOCIATES
SHREE GAJANAN ASSOCIATES has 1 registration on MahaRERA, including MAHALAXMI EMPIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.
Frequently asked questions
What are my rights if MAHALAXMI EMPIRE is delayed beyond 26 Jan 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAHALAXMI EMPIRE?
The registered promoter entity is SHREE GAJANAN ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAHALAXMI EMPIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAHALAXMI EMPIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAHALAXMI EMPIRE?
The professionals named in the filing: Architect: SHRADHA SAGNE; Engineer: PRATIKSHA GURJAR; Chartered Accountant: TAPESH MUNDADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHALAXMI EMPIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback