Home / Browse projects / Amravati, Maharashtra / MAHALAXMI EMPIRE

Completed No litigation declared Residential / Group Housing project

MAHALAXMI EMPIRE

By SHREE GAJANAN ASSOCIATES

RG-MH-01254 · RERA P50300014755 · Last updated on MahaRERA portal: 12 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Jan 2030Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

MAHALAXMI EMPIRE is a Residential / Group Housing project by SHREE GAJANAN ASSOCIATES in Amravati, Maharashtra, registered with MahaRERA as P50300014755 on 2 Jan 2018. The registration is recorded completed; possession was promised by 26 Jan 2030.

At a glance

Project

  • NameMAHALAXMI EMPIRE
  • TypeResidential / Group Housing
  • Location
    • RAHATGAON RING ROAD
    • MAHALAXMI NAGAR
    • Amravati (M Corp.)
    • Amravati
    • 444604
  • Pincode444604
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300014755
  • ReraGenie IDRG-MH-01254

Builder

  • NameSHREE GAJANAN ASSOCIATES
  • Entity typePartnership
  • PartnersPRATIKSHA PRAVIN MAHALLE, MINAKSHI SUBHASH AGRAWAL, SUBHASH GULABCHAND AGRAWAL

Key dates

this monthRegisteredJan 2018PromisedJan 2030Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Jan 2018
  • Promised completion26 Jan 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAHALAXMI EMPIRE PHASE-INA70000
MAHALAXMI EMPIRE PHASE-IINA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

MAHALAXMI EMPIRE PHASE-I82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MAHALAXMI EMPIRE PHASE-II82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,700 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5398.0
Proposed, not sanctioned2,730 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1 ST FLOOR, GIRIJA SHANKAR MARKET, JAISTAMBH SQUARE, AMRAVATI-444601, MAHARASHTRA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRADHA SAGNE
EngineerPRATIKSHA GURJAR
Chartered AccountantTAPESH MUNDADA
PartnerRole in project
SHREE GAJANAN ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jun 2021

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: sold unsold me2.pdf12 Apr 2023
Details of encumbrances concerned to FinanceFile: NA SGA.pdf13 Jan 2023
Details of encumbrances concerned to LegalFile: NA SGA.pdf13 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: NA SGA.pdf13 Jan 2023
CERSAI detailsFile: NA SGA.pdf13 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: NA SGA.pdf13 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NA SGA.pdf13 Jan 2023
Proforma of Agreement for saleFile: NA SGA.pdf13 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: NA SGA.pdf13 Jan 2023
Foreclosure of the ProjectFile: NA SGA.pdf13 Jan 2023
Deviation Report with respect to Allotment letterFile: NA SGA.pdf13 Jan 2023
Deviation Report with respect to model copy of AgreementFile: NA SGA.pdf13 Jan 2023
Other - FinanceFile: NA SGA.pdf13 Jan 2023
Other - TechnicalFile: NA SGA.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: mahalaaxmi empire 1.pdf22 Sep 2022
Disclosure of sold/ booked inventoryFile: mahalaxmi empire 2.pdf22 Sep 2022
Disclosure of sold/ booked inventoryFile: ME1 sold unsold.pdf4 May 2022
Disclosure of sold/ booked inventoryFile: ME2 Sold unsold.pdf4 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ME engi.pdf28 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold me1.pdf26 Jan 2022
Disclosure of sold/ booked inventoryFile: sold me 2 (1).pdf26 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Me.pdf24 Nov 2021
Disclosure of sold/ booked inventoryFile: ME1.pdf24 Nov 2021
Disclosure of sold/ booked inventoryFile: ME2.pdf24 Nov 2021
Status of ConveyanceFile: ME1.pdf24 Nov 2021
Status of ConveyanceFile: ME2.pdf24 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: me.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAHALAXMI EMPIRE-compressed.pdf14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: shree gajanan asso.pdf14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: shree gajanan asso.pdf14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: me (CA 5).pdf14 Aug 2021
Architect’s Certificate on Completion of Project (Form 4)File: me.pdf14 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: me2permit-935.pdf13 Aug 2021
Declaration about Commencement CertificateFile: COMMENCEMENTCERTI MEP1.pdf13 Aug 2021
Declaration about Commencement CertificateFile: me2permit-935.pdf13 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAHALAXMI EMPIRE-compressed.pdf13 Aug 2021
Form 2AFile: MAHALAXMI EMPIRE.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MAHALAXMI EMPIRE.pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: me1soldunsoldinve.pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: me2soldunsoldinve.pdf13 Aug 2021
Details of Restarting of Construction work post lockdownFile: nil.pdf13 Aug 2021
Status of ConveyanceFile: me1soldunsoldinve.pdf13 Aug 2021
Status of ConveyanceFile: me2soldunsoldinve.pdf13 Aug 2021
OtherFile: nil.pdf13 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ocme1.pdf18 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc me2.pdf18 Jun 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: dod1.pdf18 Jun 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: dod2.pdf18 Jun 2021
Building plan approvalFile: Mahalaxmi Phase compress.pdf18 Feb 2020
Building Plan Approval (IOD)File: Mahalaxmi Phase compress.pdf18 Feb 2020
Form 2AFile: form2A DEC19.pdf18 Feb 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM4ARCHITECT.pdf26 Nov 2019
Architect’s Certificate on Completion of Project (Form 4)File: FORM4ARCHIPLUSAMCOC.pdf26 Nov 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: DOD ME I.pdf26 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT 10119 ME.pdf24 Jan 2019
Certificates of CA (Form 3)File: CA CERT 10119 ME.pdf24 Jan 2019
Form 2AFile: form 2A sga.pdf9 Jan 2019
Certificates of CA (Form 5)File: CA5 SGA 17-18.pdf5 Jan 2019
Building plan approvalFile: map.pdf20 May 2018
Building Plan Approval (IOD)File: map.pdf20 May 2018
Building plan approvalFile: sanctionmap phase I.pdf9 Apr 2018
Building plan approvalFile: sanctionmap phase I.pdf9 Apr 2018
Building Plan Approval (IOD)File: sanctionmap phase I.pdf9 Apr 2018
Building Plan Approval (IOD)File: sanctionmap phase I.pdf9 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENTCERTI MEP1.pdf9 Apr 2018
Proforma of Allotment letterFile: agreement to sale draft.pdf22 Dec 2017
Building plan approvalFile: sanctionmap.pdf16 Dec 2017
Building Plan Approval (IOD)File: sanctionmap.pdf16 Dec 2017
Layout approvalFile: lay.pdf30 Nov 2017
PAN CardFile: pam.pdf30 Nov 2017
Copy of the legal title reportFile: title.pdf30 Nov 2017
Details of encumbrancesFile: Encum.pdf30 Nov 2017
Copy of Layout Approval (in case of layout)File: lay.pdf30 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: commen.pdf30 Nov 2017
Declaration in FORM BFile: FORMB-ilovepdf-compressed.pdf30 Nov 2017
Certificates of CA (Form 3)File: cacertificate.pdf30 Nov 2017
Proforma of Allotment letterFile: Allotment Letter.pdf30 Nov 2017

How this compares with Amravati

8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is completed

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep MAHALAXMI EMPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHALAXMI NAGAR450+ in Amravati

2 kmMAHALAXMI EMPIRECompleted 17Lapsed / revoked 11Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: SHREE GAJANAN ASSOCIATES

SHREE GAJANAN ASSOCIATES has 1 registration on MahaRERA, including MAHALAXMI EMPIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if MAHALAXMI EMPIRE is delayed beyond 26 Jan 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHALAXMI EMPIRE?

The registered promoter entity is SHREE GAJANAN ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHALAXMI EMPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHALAXMI EMPIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHALAXMI EMPIRE?

The professionals named in the filing: Architect: SHRADHA SAGNE; Engineer: PRATIKSHA GURJAR; Chartered Accountant: TAPESH MUNDADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHALAXMI EMPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHALAXMI EMPIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHALAXMI EMPIRE to a free account